Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BCU.V ·

Bell Copper Finds New Porphyry at Big Sandy

Exploration Programs

January 11, 2021

News Release

Bell Copper Corporation - TSX.V Symbol: BCU

Bell Copper Finds New Porphyry at Big Sandy

VANCOUVER, B.C. - Bell Copper Corporation (TSX-V: BCU) (“Bell Copper” or the “Company”) is pleased to

report that it has drilled into a new porphyry copper system at its Big Sandy project, a large, truncated

porphyry copper-molybdenum target located in northwestern Arizona, approximately 30 kilometers south

of the Company’s Perseverance Project.

Highlights

 Drilling through gravel cover has discovered a porphyry copper system of suspected Laramide age.

 Minerals observed in core include gossan veins (goethite, hematite, and jarosite ), native copper,

chalcocite, covellite, sphalerite, galena, disseminated pyrite, and quartz-molybdenite veinlets.

 Downhole IP survey at BS-1 to be performed

 Core drilling at BS-1 continues.

Drilling and Analysis

After drilling a water well to support a multi -hole, potentially multi -rig, drilling campaign, Bell began core

drilling BS-1 in early November 202 0. At a depth of 889 meters, BS -1 cut leached capping consisting of

gossan veins in sericitized quartz monzonite porphyry of suspected Laramide age and Precambrian

chloritized (i.e. “greenrocks”) granite porphyry. A weak supergene enrichment blanket in w hich chalcocite

forms rims surrounding pyrite grains extends to the base of oxidation at 938 meters. Scattered small grains

of native (metallic) copper were seen above the chalcocite -bearing interval. Below the base of oxidation,

disseminated pyrite constitutes about one volume percent of the sericitized porphyry host rock. Veinlets of

quartz carrying 3-millimeter-wide crystals of molybdenite (“B -veins” of Gustafson and Hunt, 1975) cut the

porphyry. Drilling was suspended for the Christmas holiday, and has now resumed on BS-1.

The coexistence of chlorite, sericite, molybdenite, sphalerite, and weak chalcocite in the same small volume

of core leads Bell to believe that BS -1 has penetrated a porphyry copper system near the inner edge of the

propylitic, or “greenrocks”, environment. A copper-rich shell, if one is present, would be expected within a

few hundred meters of BS-1.

The Company will take full advantage of having an active drillhole into sulfide -bearing porphyry by

conducting 2 borehole studies in BS-1 in the coming weeks. These include an acoustic televiewer (ATV) log

and downhole radial Induced Polarization (IP) survey . The combination of information from these studies

will help Bell understand the tilt of the porphyry system, the principal vein and fault orientations, and the

distribution of chargeable sulfides away from the drillhole. Such studies are expected to be useful in

targeting shallower, more sulfide-rich parts of the systems with the upcoming drillholes.

Bell will use the results from the IP survey to determine which of 4 currently permitted sites will be best for

drilling any chargeability anomalies that are detected.

Tim Marsh, Bell’s President and CEO, and a Qualified Person as defined by NI43-101, said,

“Bell’s first hole at Big Sandy intersected leached capping, weak native copper, a weak supergene chalcocite

blanket, and quartz -molybdenite veinlets in sericitized quartz monzonite porphyry of suspected Laramide

age. Big Sandy appears to be the newest addition to Arizona’s prolific Laramide porphyr y copper belt. Bell

will be giving this greenfields, grassroots, blind discovery the serious drilling attention that it deserves.”

About Bell Copper

Bell Copper is a mineral exploration company focused on the identification, exploration and discovery of

large copper deposits located in Arizona. Bell Copper is exploring its 100% owned Big Sandy Porphyry

Copper Project and the Perseverance Porphyry Copper Project which is under a Joint Venture - Earn In.

Qualified Person

The technical content of this release has been reviewed and approved by Timothy Marsh, PhD, PEng., the

Company’s CEO and President. No mineral resource has yet been identified on the Big Sandy Project. There

is no certainty that the present exploration effort will result in the identificatio n of a mineral resource or

that any mineral resource that might be discovered will prove to be economically recoverable.

On behalf of the Board of Directors of

Bell Copper Corporation

"Timothy Marsh"

Timothy Marsh, President, CEO & Director

For further information please contact the Company

Tel: 1 800 418 8250

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release includes “forward -looking statements” and “forward -looking information” within the meaning of Canadian

securities legislati on. All statements included in this news release, other than statements of historical fact, are forward -looking

statements. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by

the use of wo rds such as "anticipate", "believe", "plan", "estimate", "expect", "potential", "target", "budget" and "intend" and

statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar express ions

and includes the negatives thereof.

Forward-looking statements are based on a number of assumptions and estimates that, while considered reasonable by

management based on the business and markets in which Bell Copper operates, are inherently subject to significant operational,

economic, and competitive uncertainties, risks and contingencies. There can be no assurance that such statements will prove t o be

accurate and actual results, and future events could differ materially from those anticipated in such statements . Important factors

that could cause actual results to differ materially from the Company's expectations include actual exploration results,

interpretation of metallurgical characteristics of the mineralization, changes in project parameters as plans conti nue to be refined,

future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditio ns,

uninsured risks, regulatory changes, delays or inability to receive required approvals, and other exploratio n or other risks detailed

herein and from time to time in the filings made by the Company with securities regulators, including those described in the

Company’s most recently filed MD&A. The Company does not undertake to update or revise any forward -looking statements,

except in accordance with applicable law.