Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BAY.V ·

Aston Bay Announces 48 Metres of 2.92% Copper Intersected at Storm Project, Nunavut

Drill Results

Aston Bay Announces 48 Metres of 2.92% Copper Intersected at

Storm Project, Nunavut

TORONTO, ON / ACCESSWIRE / September 8, 2022 / Aston Bay Holdings Ltd.

(TSXV:BAY) (OTCQB:ATBHF) ("Aston Bay" or the "Company") is pleased to announce

further assay results from drilling at the Company's high-grade Storm Copper Project ("Storm"

or the "Project") on Somerset Island, Nunavut. This is the maiden drilling program for American

West Metals Limited ("American West"), who are the project operator, since entering an option

agreement with Aston Bay in March 2021.

Highlights

Drill hole ST22-02 has intersected:

• 48m @ 2.92% copper (Cu) from 8 metres (m) downhole, including;

o 1m @ 21.9% Cu from 14m downhole, and;

o 8m @ 7.86% Cu from 29m downhole, including;

▪ 3m @ 12.12% Cu from 34m downhole, and;

o 2m @ 10.24% Cu from 48m downhole

• Result further confirms continuity of the near surface high-grade copper at the

2750N Zone

• Further assays for Storm are expected in the coming days.

"These assay results from the 2750N Zone are impressive and again demonstrate the quality of

the mineralized system," stated Thomas Ullrich, CEO of Aston Bay. "These are spectacular

copper grades over significant thicknesses very near surface. This increases our confidence in the

continuity of the mineralization and confirms the potential to define a shallow copper resource

that can support a low cost, small footprint direct shipping product mining operation.

"In addition to moving the 2750N Zone toward development, a compelling discovery story is

emerging with the immense potential demonstrated by the intersection of a zone of sediment

hosted style of copper mineralization in drill hole ST22-10. Assay results for that hole are still

pending, but confirmation of copper would validate our predictive exploration model with

significant implications for the potential copper endowment in this region. We eagerly await

those results."

Figure 1: Plan view of the 2750N Zone showing drilling and gossans over aerial photography.

Stated drill hole intersections are all core length, and true width is expected to be 60% to 95% of

core length.

Drill Hole ST22-02 Details

ST22-02 was drilled to a downhole depth of 155m and was designed to test the continuity of the

copper mineralization in the central 2750N Zone (Figure 1).

The drill hole intersected a broad, 83m zone of vein and fracture style copper sulfide

mineralization from approximately 5m downhole. The volume of copper sulfide throughout the

interval is variable and is controlled by the intensity of rock fracturing within the broader fault

zone.

The stronger mineralization in ST22-02 (and throughout the 2750N Zone) consists of massive

and semi-massive chalcocite and/or bornite and is hosted within large fractures and breccia zones

(Table 1 & Figure 2).

The drill core from ST22-02 will be used for beneficiation and metallurgical test work to

produce a direct shipping product (DSP) from the 2750N Zone mineralization.

Table 1 summarizes the significant intersections from ST22-02. Intersections are expressed as

downhole widths and are interpreted to be approximately 90% of true width. A cut-off grade of

0.5% copper is used to define a significant intersection and is based on ore mineralogy,

mineralization habit and expected beneficiation performance.

Hole ID From

(m)

To (m) Width Cu % Zn % Ag

g/t

ST22-02 8 56 48 2.92 - -

Including 14 15 1 21.90 - -

And 29 37 8 7.86 - -

Including 34 37 3 12.12 - -

And 48 50 2 10.24 - -

And 53 56 3 3.07 - -

82 83 1 3.93 - -

87 88 1 4.97 - -

Table 1: Summary of significant drilling intersections for drill hole ST22-02 (>0.5% Cu).

Figure 2: Schematic geological section at 466200E showing drilling and mineralized intervals.

Drill Hole ST22-01 Details

ST22-01 was drilled from south to north to a downhole depth of 128m and was also designed to

test the continuity of the copper mineralization in the central 2750N Zone (Figure 1).

An 18m wide zone of copper mineralization was intersected in ST22-01, which appears to have

been part of a much thicker intersection that has been truncated by a high-angle fault (Figure 4).

The preserved copper rich portion of the interval lies on the interpreted footwall of the fault, and

appears identical to that in drill hole ST22-02, with massive and breccia sulfides in places over

10% copper. The upper, hanging wall zone of the mineralized interval contains dark grey sooty

iron oxides (after pyrite?) and intermittent copper sulfides.

The strong presence of fine grained and sooty pyrite, highly fractured dolomite and weathered

nature of the rock package all confirm the presence of a late-stage structure which has likely

offset the mineralization on this drill section (Figure 3). Larger examples of these north-south

oriented faults can be seen at surface and appear as weathered gullies, one of which is present to

the immediate west of the 2750N Zone (Figure 1).

Further drilling either side of this section will define the displacement direction of the typically

wide (approx. 50m) zone of mineralization in this part of the mineralized system.

Table 2 summarizes the significant intersections from ST22-01. Intersections are expressed as

downhole widths and are interpreted to be approximately 90% of true width. A cut-off grade of

0.5% copper is used to define a significant intersection and is based on copper sulfide

mineralogy, mineralization habit and expected beneficiation performance.

Figure 3: Sooty sulfides within fractured dolomite in drill hole ST22-01 (approx. 29m - 38.31m

downhole).

Hole ID From

(m)

To (m) Width Cu % Zn % Ag

g/t

ST22-01 50 53 3 0.77 - -

Including 50 51 1 1.05 - -

65 69 4 3.39 - -

Including 66 67 1 10.6 - -

82 83 1 1.69 - -

Table 2: Summary of significant drilling intersections for drill hole ST22-01 (>0.5% Cu).

Figure 4: Schematic geological section at 466230E showing drilling and mineralized intervals.

2750N Zone: Advancing to a Mineral Resource Estimate

All drill holes completed at the 2750N Zone have successfully intersected thick zones of breccia

and/or massive copper sulfides (mostly chalcocite) hosted within much broader intervals of vein

and fracture-style mineralization.

Of the total of 1,534m drilled during the 2022 program, 997m has been completed at the shallow

and high-grade 2750N Zone. The drilling has failed to close off the mineralization, which is over

200m in strike and remains open to the east and west, and at depth.

There is excellent potential for further extensions to the 2750N Zone with strong copper

anomalism in soils and rock chips along strike for over 1km from the known mineralization.

Massive chalcocite has been mapped in outcrop to the west of the 2750N Zone, with assays of

rock chips up to 62% copper (Figure 5).

Figure 5: Massive chalcocite boulders exposed at surface from the 2750N Zone.

Drilling Program Summary

Hole ID Prospect Easting Northing Depth

(m) Azimuth Inclination

ST22-01 2750N 466230 8172841 128 180 -50

ST22-02 2750N 466202 8172763 155 360 -65

ST22-03 2750N 466293 8172778 119 359 -68.6

ST22-04 2750N 466276 8172827 146 182 -60.3

ST22-05 2750N 466275 8172827 89 180 -45.8

ST22-06 2750N 466178 8172828 152 180 -53

ST22-07 2750N 466164 8172804 101 197 -52

ST22-08 2750N 466328 8172822 107 180 -55

ST22-09 Loop10_1 466947 8172552 155 018 -60

ST22-10 Loop7_2 464323 8174299 382.6 180 -68.4

Table 3: Drill hole details.

Planned Program

Work will continue to progress the near-surface mine development and exploration/discovery

paths for the Storm Project in parallel.

Further diamond drilling is planned for next season to expand the shallow, high-grade 2750N

Zone, and to define initial resources at the 4100N and 2200N Zones where shallow high-grade

copper mineralization has also been intersected in historical drilling.

Exploration activities including drilling and geophysics are also planned for next season to

follow-up the significant new discovery of sediment hosted style copper mineralization, which is

associated with a large EM anomaly to the west of the previously recognized and highly

mineralized 4100N Zone (see August 23, 2022 news release). With six EM anomalies similar to

that intersected remaining to be tested, there is strong potential for multiple large-scale mineral

system to occur at these deeper levels.

Beneficiation and metallurgical test work will soon commence on the remaining half drill core

(ST22-02) from this year's program. The aim of this work is to create a definitive flow sheet for a

direct shipping product operation from the 2750N Zone mineralization. Previous test work on

Storm drill core has produced a >53% copper direct shipping product using a full-scale ore sorter

and with no further processing or optimization (see April 11, 2022 news release).

Investors can expect further news as the laboratory assays for the remaining drill holes are

received over the coming days and weeks.

About the Storm Copper and Seal Zinc-Silver Projects, Nunavut

The Nunavut property consists of 117 contiguous mining claims and six prospecting permits

covering an area of approximately 302,725 hectares on Somerset Island, Nunavut, Canada. The

Storm Project comprises both the Storm Copper Project, a high-grade sediment hosted copper

discovery (intersections including 110m* @ 2.45% Cu from surface and 56.3m* @ 3.07% Cu

from 12.2m) as well as the Seal Zinc Deposit (intersections including 14.4m* @ 10.58% Zn,