Aston Bay and American West Metals Confirm New Zone of Thick, Near-Surface, High-Grade Copper at Storm Copper Project, Canada Grades of more than 7% copper in recent drilling of The Gap; planned 20,000m summer drilling program underway

Drill Results Exploration Programs

Aston Bay and American West Metals Confirm New Zone of Thick,

Near-Surface, High-Grade Copper at Storm Copper Project, Canada

Grades of more than 7% copper in recent drilling of The Gap;

planned 20,000m summer drilling program underway

• Drill hole SR24-03 at the underexplored Gap prospect has intersected:

• 20 metres (“m”) @ 2.3% copper (“Cu”) from 38m downhole, including,

▪ 8m @ 5.3% Cu from 39m downhole, including,

• 3m @ 7% Cu from 41m downhole

• SR24-03 was drilled to test an electromagnetic (EM) anomaly, once again demonstrating the strong

correlation between EM targets and very high-grade copper sulfide mineralization

• A further 10 EM anomalies have already been identified by the 2024 EM program, with deep penetrating,

high-resolution EM surveys planned to recommence this month around the existing Storm deposits as

well as the regional Tornado, Blizzard, and Tempest areas

• The summer drilling program is now underway with approximately 20,000m of drilling planned, initially

using two Reverse Circulation (RC) rigs and one diamond drilling rig, to target:

• Resource definition at the Thunder high-grade discovery where drilling during 2023 intersected

48.6m @ 3% Cu from 32.4m (ST23-03)

• Resource definition and extension at the Cyclone and Chinook Prospects

• Shallow, high-priority EM targets within the Storm area

• Large-scale geophysical targets below the Cyclone Prospect where drilling during 2023

discovered high -grade copper sulfides up to 2.7% Cu at approximately 300m vertical depth

(ST23-02)

• Bulk sampling for prefeasibility-level processing and development studies

• Sealift to Storm locked -in for September 2024 with fuel and other drilling supplies as well as heavy

mechanized equipment for the 2025 season already delivered to port in Montreal and ready for shipping

to Storm

TORONTO, Ontario, July 2, 2024 – Aston Bay Holdings Ltd. (TSXV: BAY) (OTCQB: ATBHF) ("Aston Bay" or

the "Company”) is pleased to present an update on drilling and exploration activities currently underway

at the Storm Copper Project (“Storm” or the “Project”) on Somerset Island, Nunavut. The program is being

conducted by American West Metals Limited (“American West”), who is the operator of the Project. Aston

Bay and American West have formed a 20/80 unincorporated joint venture in respect of the Storm Project

property, with Aston Bay maintaining a free carried interest until a decision to mine upon completion of

a bankable feasibility study.

Thomas Ullrich, Chief Executive Officer of Aston Bay, commented:

“The 2024 exploration program is already delivering early exploration success this season. The grade and

length of this intercept at the new Gap Prospect are impressive, further proof of the effectiveness of EM

geophysics as a targeting tool for copper.

“The track-mounted RC drill rig , new to Storm this year, will improve efficiency in delineation drilling,

augmenting our heli -portable RC and diamond rigs. Multiple anomalies remain untested - we are just

getting started, with more geophysics and 20,000 metres of reverse circulation (RC) and diamond drilling

planned for the rest of the season.”

Figure 1: Reverse Circulation (RC) drilling underway at the Chinook Prospect, Storm Project, Nunavut.

SUMMER DRILLING TO ACCELERATE AND BUILD ON EARLY 2024 SUCCESS

Assays from the spring program drill holes SR24 -01, SR24-02, SR24-03, SR24-04 and SR24 -05 have now

been received and confirm new exploration success in The Gap area, which is located midway between

the Cirrus Prospect and the high-grade Thunder Prospect.

A total of five drill holes for 992.2m were completed during the spring program before the break leading

into the summer drilling and exploration program.

The drilling at The Gap has intersected a thick interval of high -grade copper sulfides associated with an

EM anomaly. The intersection of 20m @ 2.3% Cu from 38m downhole contains copper grades up to 7.3%

Cu (from 41m downhole) and continues to confirm the association of EM anomalies with very high-grade,

semi-massive copper sulfides.

The Gap EM anomaly was the first of a series of high-priority conductors in the southern graben area that

are planned to be tested during the drilling season . The drill hole highlights the potential for further

discoveries along the 4km of structures that host the Cirrus and Corona Prospects, as well as the high-

grade Thunder (48.6m @ 3% Cu) and Lightning Ridge (30.4m @ 2.1% Cu) copper prospects.

The fifth drill hole of the spring program (SR24-05) tested a historic Induced Polarization (IP) geophysical

anomaly within the central graben area, an area with very little previous drilling. This central graben area

is interpreted to be a down-dropped block between the two main faults to the north and south that host

or are spatially associated with most of the copper mineralization at Storm. The geology in the graben is

considered equally prospective as elsewhere at Storm but displaced downwards an unknown depth.

This fifth hole encountered a thick sequence of pyrite mineralization, typical peripheral -style

mineralization at Storm, and the likely source of the IP anomaly. The hole terminated at 251.5m, the limit

of the RC drill rig, without intercepting copper sulfides . This suggests that the hypothesized flat-lying

copper-mineralized horizon within the central graben could be displaced 250m stratigraphically below the

mineralized zones as seen at Cyclone . Additional drilling with the diamond drill rig will test Fixed Loop

Electromagnetic (FLEM) and Moving Loop Electromagnetic ( MLEM) anomalies in this highly prospective

area.

The Summer program has now commenced testing a broad range of exploration and resource targets,

including the Thunder, Cyclone and Chinook Prospect areas. The program will initially use two RC rigs and

one diamond drilling rig with over 20,000m of drilling planned for the 2024 program.

Hole ID Prospect Easting Northing Depth (m) Azimuth Inclination

SR24-01 Expl. 465403 8174839 251.5 180 -75

SR24-02 Cyclone 465497 8174396 140.2 180 -70

SR24-03 The Gap 464015 8173152 149.4 170 -45

SR24-04 The Gap 463975 8173143 199.6 130 -60

SR24-05 Graben 464200 8173324 251.5 180 -75

Table 1: Details for the 2024 resource and exploration drill holes completed to date.

Figure 2: Recent and existing drill hole locations and zones of copper mineralization overlaying aerial

photography.

DRILL HOLE SR24-02 DETAILS

SR24-02 was drilled to the north of the Cyclone Prospect to a downhole depth of 140.2m and was designed

to test for potential extensions to the existing copper resources at the Cyclone Prospect.

SR24-02 intersected a single thick zone of copper sulfide mineralization between 82m and 116m

downhole. The chalcocite dominant, weakly mineralized zone consists of thin veinlets and patchy

disseminations within fractured dolomite, with grades up to 0.5% Cu (82.3 – 83.8m downhole).

The relatively lower grades of the interval reflect other nearby drill holes that are characterized by a local

facies change in the rock to massive dolomudstone: the “tight” very fine-grained mudstone rock lacks the

open space necessary for the efficient copper mineralization that is well -defined laterally throughout

Cyclone. Importantly, however, previous drilling has confirmed that the copper mineralization re -

intensifies in more favourable permeable host rock to the east, as well as potentially north tow ards drill

hole SR23-55 (7.6m @ 1% Cu, including 1.5m @ 2% Cu), providing vectors for future drilling.

Hole ID From

(m)

To (m) Width Cu % Zn % Ag g/t

SR24-02 82.3 83.8 1.5 0.5 - 0.5

106.7 108.2 1.5 0.3 - 1

111 116 5 0.2 - 1

Table 2: Summary of significant drilling intersections for drill hole SR24-02 (>0.2% Cu)

DRILL HOLE SR24-03 & SR24-04 DETAILS

SR24-03 was drilled to a downhole depth of 149.4m and was designed to test a strongly conductive MLEM

anomaly in The Gap area (midway between the Cirrus copper prospect and the Thunder high-grade copper

prospect) (Figure 2).

The entire 149.4m length of drill hole SR24 -03 is variably mineralized with a combined total of 47.2m of

breccia and vein-style copper mineralization. The drill hole contains a strongly sulfide-mineralized breccia

interval which returned 20m @ 2.3% Cu from 38m downhole . The mineralization within the strongly

mineralized zone (chalcocite, bornite, chalcopyrite) appears very similar to that of the Thunder Prospect

to the east and contains a semi-massive sulfide zone grading 8m @ 5.3% Cu from 40m downhole.

Hole ID From

(m)

To (m) Width Cu % Zn % Ag g/t

SR24-03 38 58 20 2.3 - 3.3

Including 39 47 8 5.3 - 6.4

Including 41 44 3 7 - 7.5

And 54.9 56.4 1.5 1.1 - 1

62.5 64 1.5 0.4 1

74 82 8 0.4 1.6

93 96 3 0.5 1.5

129 134 4 0.2 1

Table 3: Summary of significant drilling intersections for drill hole SR24-03 (>0.2% Cu)

SR24-04 was drilled to a downhole depth of 199.6m and was designed to help determine the geometry of

the main zone of copper mineralization encountered in drill hole SR24 -03 for future resource definition

drilling. The drill hole was drilled across section and below SR24-03.

SR24-04 intersected a number of copper zones with vein style mineralization hosted within fractured

dolomite.

Hole ID From

(m)

To (m) Width Cu % Zn % Ag g/t

SR24-04 32 35 3 1 - 3

42.7 44.2 1.5 0.9 - 1

47.3 48.8 1.5 0.4 - 1

56.4 57.9 1.5 1 - 9

Table 4: Summary of significant drilling intersections for drill hole SR24-04 (>0.2% Cu)

The intersection depths and the intensity and zoning of copper sulfides in both drill holes indicate that the

mineralization in the Gap area may be relatively flat-lying and may have the potential for lateral expansion

(Figure 3).

The Gap exploration holes were planned to test a very strong MLEM anomaly that covers an area of

approximately 300m x 200m. This feature is located within a much larger zone of moderately conductive

EM, which suggests that the footprint of copper mineralization in The Gap area could be significant.

Additional drilling will be used to determine the extent of the copper mineralization at The Gap Prospect

during the 2024 summer drilling season.

Figure 3: N-S schematic geological interpretation on section 464,000E showing the location of SR24-03 and

SR24-04. Note – drill hole SR24-04 is located off section and shown for context.

DRILL HOLE SR24-05 DETAILS

Exploration drill hole SR24 -05 was drilled to 251.5m and was designed to both test an IP anomaly and

investigate the stratigraphic section within the central graben area of Storm.

The interpretation of historical IP data highlighted a broad, weakly chargeable feature that may have

represented disseminated copper sulfides.

This central graben area is interpreted to be a down -dropped block between the two main faults to the

north and south that host or are spatially associated with most of the copper mineralization at Storm. The

geology in the graben is thought to be equally prospective as elsewhere at Storm but displaced

downwards by faulting, suggesting that any mineralized horizons in the large graben, if present, would

also be displaced downward an unknown depth.

SR24-05 encountered a thick sequence of pyrite mineralization, the typical peripheral-style mineralization

at Storm, between 58m and 204m and is the likely source of the IP anomaly. The drill hole did not intersect

the hypothesized copper horizon which is interpreted to be displaced below 250m vertical depth.

Deeper diamond drilling will test the prospective copper horizon (which also hosts the Cyclone copper

deposit) at depth in the central graben area. Deep diamond drilling during 2023 intersected copper sulfide

mineralization up to 2.7% Cu (from 358.2m downhole in drill hole ST23 -02), confirming the potential for

a stacked mineral system in the Storm area, with at least two highly prospective horizons identified to

date (at depths of 50-100m and 250-350m depth respectively).

RESOURCE DEFINITION DRILLING PLAN – THUNDER, CYCLONE AND CHINOOK PROSPECTS

The near -surface, favourable geometry and high copper grades of the Storm prospects have set the

foundation for what Aston Bay and American West believe could be a large-scale, long-life copper mining

camp in the Storm area.

The Thunder Prospect, as well as the Cyclone and Chinook Prospects have been prioriti zed for the

delineation of resources for the maiden resource estimate at Storm. Work at Cyclone and Chinook will

also aim to convert a large volume of mineralized rock.

The copper mineralization within all of these prospects remains open with numerous high -grade copper

drill intervals on the margins of the deposits. An estimated 12,000 – 15,000m of drilling has been planned

for resource expansion activities in the Storm area.

EXPLORATION DRILLING PLAN

The recent exploration and resource definition activities indicate that the Storm Prospects and extensive

copper mineralization are only a small part of a very large, sediment-hosted copper mineral system.

Significant exploration discovery potential along strike and at depth

There is significant potential for additional exploration discovery at Storm both at depth and along strike.

High-grade copper sulfide mineralization has been found at a stratigraphic level below the known near-

surface copper prospects (Figure 4), and at numerous other locations along the 100km strike of the

prospective copper horizon (Figure 6).

All five of the deep diamond drill holes completed during the 2022 and 2023 programs intersected copper

sulfide mineralization at approximately the same stratigraphic horizon (270 -320m vertical depth) across

an of area of 5 km2. Notably, drill hole ST23 -02 intersected high-grade mineralization up to 2.7% Cu (at

358.2m downhole), and multiple intersections over 1% copper, indicating the potential of the system to

host economic mineralization similar to that defined in the near surface at that deeper stratigraphic level

(Figure 5).

Figure 4: Long Section view of the Cyclone Prospect showing the known copper mineralization, drilling,

and the potentially extensive copper horizon intersected at depth by diamond drilling in 2022/2023.

MLEM highly effective, now optimized for both near-surface and >250m depth

Phase 1 of the Moving Loop Electromagnetic (MLEM) survey was completed during the Spring exploration

program. The survey covered the majority of central graben of the immediate Storm area with

approximately 46.7 line-km completed. The first phase of the survey was configured and optimized to

screen for conductive bodies (such as copper sulfides) up to 250m depth. Areas to the east hosting

compelling gravity anomalies between known mineralized faults will be investigated in future programs.