Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BARU.V ·

BARU GOLD Corp Receives Production Licence Upgrade

Permits & Approvals

News Release

February 03, 2021 Trading Symbol: “TSX.V: BARU | OTCQB: BARUF”

BARU GOLD CORP RECEIVES PRODUCTION LICENCE UPGRADE

Vancouver, Canada – Baru Gold Corp (“Baru Gold” or “The Company”) is pleased to announce

that the Ministry of Energy and Mineral Resources (MoEMR) has upgraded its Sangihe Gold

Project Contract of Work (“CoW”) to Operation Production status after a three month delay

due to the Covid-19 pandemic in Indonesia.

This licence provides Baru Gold with the rights to operate precious metal mine s on 42,000

hectares on Sangihe Island, of which only 10% of the area has been geologically explored

to date. Exploration will be upgraded through a resource development drilling program and

will be expanded to other areas of the CoW once production cashflow has been initiated.

The Company intends to proceed to production without the benefit of first establishing mineral

reserves supported by a feasibility study. The Company cautions readers that any production

decision made by the Company will not be based on a NI 43 -101 feasibility study of mineral

reserves that demonstrates economic and technical viability and as such, there may be involved

increased uncertainty and various technological and econom ic risks such as the interpretation of

drill results; the geology, grade and continuity of mineral deposits; the possibility that future

exploration, development or mining results will not be consistent with our expectations; commodity

and currency price f luctuation; failure to obtain adequate financing; regulatory, recovery rates,

refinery costs, and other relevant conversion factors, permitting and licensing risks; general market

and mining exploration risks and production and economic risks related to de sign and engineering,

manufacturing, technological processes and test procedures and the risk that the project’s output

will not be salable at a price that will cover the project’s operating and maintenance costs.

The existing CoW license for the Sangihe g old project is a 30 -year license and under the

recently issued 2020 mining regulations can be extended for 20 years . This CoW

production status upgrade also gives the Company rights for refinery and export licences.

Mr. Terry Filbert, CEO of Baru, commented, “Since 2017, I have been focused on bringing

the Sangihe gold project into profitable cashflow production. After four long years we are

now clear of obstacles to accomplish this goal.”

“I would like to thank the MoEMR for their diligent support in e xpediting Baru Gold’s

request to issue the production licence upgrade despite their office closure during this

second wave of COVID-19 sweeping through Indonesia that has caused both government

and administrative delays.”

Baru Gold Corporation

9th Floor 1021 West Hastings St

Vancouver, BC V6C1L6

www.barugold.com

While waiting for the issu ance of the licence upgrade, the Company has taken many steps

to fast-track the heap leach construction target. We have mobilized our mining team to the

site, started hiring local residents for the many construction and production positions ,

identified land acquisition targets required for the project, and undertaken steps to mitigate

any environmental impact we may have on the island.

The recent appointment of Joe Keane as a director, with over 40 years of experience in

heap leach technology, production , and mining processing systems from around the world ,

adds to the wealth of knowledge and experience the Company presently has , and will be

instrumental in bringing the production online as quickly as possible.

Baru Gold is no longer a junior exploration company . The Company is moving towards

generating cashflow from a self-sustaining operation. With its low cost of production and

the rising price of gold , the Company expects its expanding profit margin will enable its

expansion of the mines production and detailed exploration of the entire CoW. T argeted

start up of the heap leach operation is mid-2021.

QUALIFIED PERSON

Frank Rocca, BAppSc. (Geology), MAusIMM, MAIG, Chief Geologist of Baru Gold Corp.

is the Qualified Person as defined under NI 43 -101 who has re viewed and approves the

content of this release.

ABOUT SANGIHE GOLD PROJECT

The Sangihe Gold project is located on the island of Sangihe off the northern coast of Sulawesi and

has an existing National Instrument 43 -101 inferred mineral resource of 114,700 indicated and

105,000 inferred ounces of gold as reported in the Company's "Independent Technical Report on the

Mineral Resource Estimates of the Binebase and Bawone Deposits, Sangihe Project, North

Sulawesi, Indonesia" dated May 10, 2017 by Ian Taylor MAusIMM(CP) and Anthony James

Woodward MAusIMM, MAIG filed on SEDAR . Only 10% of the gold bearing area has been

explored. The Company's 70 -percent interest in the Sangihe -mineral-tenement contract of work

("CoW") is held in PT. Tambang Mas Sangihe (“TMS”). The remaining 30-percent interest in TMS

is held by three Indonesian corporations. The term of the Sangihe CoW agreement is for 30 years

upon commencement of the production phase of the project.

ABOUT BARU GOLD CORPORATION

Baru Gold Corporation (formerly East Asia Minerals) is positioning itself to become Indonesia’s

new gold producer. We are a dynamic junior gold developer with NI43 -101 gold resources in

Indonesia, one of the top ten gold producer countries in the world. In 2020, Baru Gold received

approval on the environmental permit and became compliant on all government requirements for

the Sangihe Gold Project. Baru has received the approval for the upgrade of its licence to advance

the project to construction and production in 2021.

Our team of min ing and finance professionals are based both in North America and locally in

Indonesia and boasts extensive experience in starting and operating small-scale gold and coal assets.

With sufficient funds and strong retail and institutional shareholder support , Baru Gold is well

positioned to take advantage of the increased interest in gold and precious metals with both

exploration upsides and operation cashflow in 2021.

BARU GOLD CORPORATION

Per: “Terry Filbert”

Terry Filbert, Director

President & CEO

[email protected]

+1-206-890-8285

For investor contacts more information, please contact:

Kevin Shum

Investor Relations

[email protected]

647-725-3888 ext 702

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

Certain statements in this News Release, which are not historical in nature, constitute “forward looking statements”

within the meaning of that phrase under applicable Canadian securities law. These statements include, but are not limited

to, statements or information concerning future work programs, results and timing of any work programs, the Company’s

performance or events as of the date hereof. These statements reflect management’s current assumptions and expectations

and by their nature are subject to certain underlying assumptions, known and unkn own risks and uncertainties and other

factors which may cause actual results, performance or events to be materially different from those expressed or implied

by such forward looking statements. Those risks include the interpretation of drill results; the geology, grade and

continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent

with our expectations; commodity and currency price fluctuation; failure to obtain adequate financing; regulato ry,

recovery rates, refinery costs, and other relevant conversion factors, permitting and licensing risks; general market and

mining exploration risks and production and economic risks related to design and engineering, manufacturing,

technological processes and test procedures and the risk that the project’s output will not be salable at a price that will

cover the project’s operating and maintenance costs. Forward -looking statements should not be construed as investment

advice. Readers should perform a detailed, independent investigation and analysis of the Company and are encouraged to

seek independent professional advice before making any investment decision. Accordingly, readers should not place

undue reliance on any forward -looking statement. Except as required by applicable securities laws, the Company

disclaims any obligation to update or revise any forward looking statements to reflect events or changes in circumstances

that occur after the date hereof.