Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

B.V ·

Project, Utah , USA Vancouver, BC

Corporate Updates

BCM

Intercepts 510 ft @ 0.66% Cu in

Phase 3

Drilling

at

T

hompson Knolls

G

reenfield

Cu

-

Au

Porphyry

Project, Utah

, USA

Vancouver, BC,

May 2

4

, 202

3

–

BCM Resources Corp

(

“

B

”

or

“

Company

”

)

is pleased

to update its

shareholders

on

the

progress at

Thompson Knolls (TK)

greenfield Cu

-

Au

-

Ag

-

Mo

porphyry

project

in

southwestern Utah

, USA

.

Phase 3 drilling at TK

(see Company pre

v

ious NR

BCM Resources Corp.

| News

)

envisaged drilling of

seven

core

holes.

“

B

”

reports

th

at

,

to date

,

four

drill

holes

have been

completed

.

A

ssay results

have been

received for

three

of these

dril

l

holes

(TK7, TK8

,

and TK9)

.

The

h

ighlight of the assay results is a significant m

ineral intercept of

510 ft (

155

.4

m)

@

0.66% Cu, 0.12

g/t Au

,

and

7.4 g/t Ag

in drillhole TK8

, with

8 sample intervals containing

values

greater than

1% Cu

over

8

0 ft (

24.3

m

)

.

President

& CEO

Dr. Sergei Diakov stated,

“

I am

very excited

about

this

very encouraging

mineral

ized

intercept

in

drillhole

TK8

as it

indicat

es

significant

potential f

or the

TK project to

host a

sizable

copper

-

gold

porphyry system

with skarn mineralization

. We continue

testing

TK

project

potential

focusing our

exploration

porphyry Cu expertise to

vector

-

in on

the

discovery of

the

greenfield

porphyry system

copper core

.

”

Summary of

Drillhole TK

8

TK

8

was collared

between TK3 and TK5 drillholes

(see

map

BCM Resources Corp. | News

)

.

It

was

drilled vertically

,

reaching

a

downhole

depth of

3

,

06

2

.5 ft (933.45 m).

The hole was designed to test

the north

-

western

flank

of

the

TK magnetic anomaly and continuity of mineralization from TK3

.

At

1

,

915

ft (

583.7

m)

depth,

TK8 intercepted mineralized

diopside

-

marble

skarn

oxidized to

a

2,040 ft

(621.8 m) depth and then

encountered

primary

magnetite

-

chalcopyrite

mineralization

that

was

documented

for

an exten

d

ed interval

from 2

,

040 ft (

621.8

m) to 3

,

050 ft (

929.6

m)

, a

total

of

1

,

010 ft

(

307.8

m)

. Sampling

returned assay results

averag

ing

0.40% Cu, 0.08 g/t Au and 4.92 g/t Ag

,

including a more intensely mineralized interval from 2

,

040 ft (

621.8

m) to 2

,

550 ft (

777.2

m)

of

total

510 ft (155.4 m)

@

0.66% Cu, 0.12 g/t Au and 7.4 g/t Ag

,

with 8 sample intervals containing

values greater than

1% Cu over 80 ft (24.3 m).

Summary of

Drillhole TK

7

Drillhole TK

7

was drilled

vertically

to a depth of

1,2

3

0

ft (

375

m)

and located

S

S

W

of hole TK

3

which

was drilled

vertically to

a depth of

2,641 ft (

805

m)

and designed to test

the

strong

part of

the

TK

magnetic anomaly

. It

reached

a

quartz

-

monzonite porphyry intrusion at 1,321 ft (

402.6

m) carrying

weak quartz

-

chalcopyrite mineralization in numerous thin quartz pyrite

-

chalcopyrite veinlets and rare

quart

z

stockworks. Typical alteration

developed includes

: i)

weak potassic (biotite

-

K

-

feldspar)

; ii)

propylitic

(chlorite)

with magnetite

,

and

; iii)

patchy argillic alteration

.

Cop

p

er grades in the sampled

interval from 2

,

060

ft (627.9 m)

to

the

bottom returned low copper metal

values

below 0.1%

.

Summary of

Drillhole TK

9

Drillhole TK9

located

E

SE

of TK6

1,923 ft

(

586

m)

away

was drilled to

a

depth of

2

,

322

.5

ft (

707.

9

m)

and designed to test

the

northern edge of

the TK

magnetic anomaly

in carbonate rocks

. It

encountered

strongly silicified

marbleized

dolomites and

limestones

with some patchy

quartz

-

magnetite

-

hematite breccia

mineralization

. Assay results

were

low copper grades below 0.1% Cu.

Summary of Drillhole TK10

This drill hole was located

E

SE

of TK9

1,585 ft (483 m)

away

to test the northern edge of

the

TK

anomaly

similarly to TK9

. It was

d

rilled vertically to a depth of 3,633 ft (1.107 m) in dolomitized

marbles

with no visual mineralization.

Drilling continues.

The Company

is currently a

ctively

advancing

hole

TK14

which

is

strategically located

between

holes

TK3a and TK6

.

Hole TK14 is designed to test

the

north

-

western extension of

the

TK magnetic

anomaly

both in carbonate rocks and underlying quartz

-

monzonite intrusion

.

Mineralized skarn

lithologies have been inter

sected in TK14

so far

and drilling is proceeding.

TK is located approximately

2

10

k

m

southwest of Rio Tinto’s giant Bingham Canyon porphyry

copper

-

molybdenum

-

gold mine and smelter complex near Salt Lake City, Utah.

Qualified Person and QAQC

Mr. Richard R. Redfern, M.Sc., and Certified Professional Geologist, a

Company

“

qualified person

”

for the purposes of National Instrument 43

-

101, has verified and approved the information contained

in this news release.

Core sampling was conducted on 10

-

ft

mineralized intervals with standards

and “blank” samples inserted in every 10 batch

es

of samples for quality control procedures.

About BCM Resources Corporation

BCM Resources Corporation is a diversified Canadian mineral exploration company

focused on

the

continued exploration

of the Thompson Knolls

Porphyry Cu

-

Au

-

Ag

-

Mo

pro

ject

. BCM also controls

perspective

Copper, Gold, and Molybdenum exploration projects in

British Columbia. BCM

Resources is managed by experienced and successful board members

and

tec

hnical

advisors. For

further information, including area maps, sections, and photos, please visit

our website at

www.bcmresources.com or contact us by e

-

mail at

[email protected]

.

ON BEHALF OF BCM RESOURCES

CORP.

Sergei Diakov

President

&

CEO

For further

information,

please contact:

Investor relations 604

-

646

-

0144 ext

.

222

[email protected]

www.bcmresources.com

Caut

ion Concerning Forward

-

Looking Statements:

This news release and related texts and images on BCM Resource Corporation

’

s website contain

certain

“

forward

-

looking statements

”

including, but not limited to, statements relating to

interpretation of

mineralizat

ion potential, drilling and assay results, future exploration work, and the

anticipated results of

this work. Forward

-

looking statements are statements that are not historical

facts and are subject to a

variety of risks and uncertainties which could cause

actual events or

results to differ materially from those

reflected in the forward

-

looking statements, including, without

limitation: risks related to fluctuations in

metals prices; uncertainties related to raising sufficient

financing to fund the planned

work in a timely

manner and on acceptable terms; changes in

planned work resulting from weather, logistical, technical,

governmental, social, or other factors;

the possibility that results of work will not fulfill expectations and

realize the perceived pot

ential of

the company

’s

projects; uncertainties involved in the interpretation of

sampling and drilling results

and other tests; the possibility that required permits and access agreements

may not be obtained

in a timely manner; risk of accidents, equipmen

t breakdowns or other unanticipated

difficulties or

interruptions

, and

; the possibility of cost overruns or unanticipated expenses in these

exploration

programs.