Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

B.V ·

Diamond Drilling Resumed at Thompson Knolls Cu-Au-Mo project in SW Utah

Exploration Programs

Diamond Drilling Resumed at Thompson Knolls Cu-Au-Mo project in SW Utah

Vancouver, BC, December 2, 2021 – Dr. Sergei Diakov, President & Director of BCM Resources

Corporation (TSX-V: B), the "Company," is pleased to announce that Diamond Drilling has

resumed at the Thompson Knolls (“TK”) porphyry copper-gold-molybdenum project in

southwestern Utah.

The company has hired drilling contractor Falcon Drilling, the “Contractor”. The contractor is

based out of Prince George, B.C. Canada with a branch office in Carson City, Nevada, USA.

Falcon Drilling was selected on a competitive basis. The Contractor is bringing its powerful F-

6000 drilling rig and experienced crew to continue drill testing of TK anomalous areas with a

capability of drilling HQ drillholes down to a depth of 6,000’. Photos of the F-6000 drilling rig

will be posted to the company website in short order.

Earlier drilling at TK-3 intercepted porphyry-style mineralization both in the marbleized host

rock dolomites and the underlying quartz-monzonite porphyry intrusion. Drilling was stopped in

the mineralized intrusive due to complications in the drill hole.

Further drillhole sites to test the mineralized TK porphyry system were identified based on the

results obtained from the magnetic and AMT geophysical surveys as well as the results of the

previous drilling. The Contractor will start with the drilling of TK-4, located 500 meters due

south of TK-2, and directed towards a vertical conductor outlined by the AMT survey within the

magnetic anomalous area over the TK porphyry system.

TK is located approximately 200 km southwest of Rio Tinto’s giant Bingham Canyon porphyry

copper-molybdenum-gold mine and smelter complex near Salt Lake City, Utah.

The Company’s Director, Mr. Richard R. Redfern, M.Sc., and Certified Professional Geologist, a

'qualified person' for the purposes of National Instrument 43-101, has verified and approved

the information contained in this news release.

About BCM Resources Corporation

BCM Resources Corporation is a diversified Canadian mineral exploration company focused on

continued exploration of the Thompson Knolls Porphyry Cu-Au-Mo project. BCM also controls

prospective Copper, Gold, and Molybdenum exploration projects in British Columbia. BCM

Resources is managed by experienced and successful board members and advisors. For further

information, including area maps, sections, and photos, please visit our website at

www.bcmresources.com or contact us by e-mail at [email protected].

ON BEHALF OF BCM RESOURCES CORP.

Sergei Diakov

President & Director

For further information, please contact:

Investor relations 604-646-0144 ext. 222

[email protected]

www.bcmresources.com

Caution Concerning Forward-Looking Statements:

This news release and related texts and images on BCM Resource Corporation’s website contain

certain “forward-looking statements” including, but not limited to, statements relating to interpretation

of mineralization potential, drilling and assay results, future exploration work, and the anticipated

results of this work. Forward-looking statements are statements that are not historical facts and are

subject to a variety of risks and uncertainties which could cause actual events or results to differ

materially from those reflected in the forward-looking statements, including, without limitation: risks

related to fluctuations in metals prices; uncertainties related to raising sufficient financing to fund the

planned work in a timely manner and on acceptable terms; changes in planned work resulting from

weather, logistical, technical, governmental, social, or other factors; the possibility that results of work

will not fulfill expectations and realize the perceived potential of the company’s projects; uncertainties

involved in the interpretation of sampling and drilling results and other tests; the possibility that

required permits and access agreements may not be obtained in a timely manner; risk of accidents,

equipment breakdowns or other unanticipated difficulties or interruptions, and; the possibility of cost

overruns or unanticipated expenses in these exploration programs.