Aztec Receives Initial RC Drill Results from Tombstone Project, Arizona Including 0.94 gpt Gold and 42.1 gpt Silver (1.60 gpt AuEq) over 77.7m
PO Box 10328 T: 604-685-9770
Suite 1130 – 609 Granville Street www.aztecminerals.com
Vancouver, BC V7Y 1G5
Aztec Receives Initial RC Drill Results from Tombstone Project, Arizona
Including 0.94 gpt Gold and 42.1 gpt Silver (1.60 gpt AuEq) over 77.7m
• 4 holes drilled near centre of Contention pit confirm gold and silver
mineralization in historic drilling
• 20 hole program continues with results pending from historic gold and
silver targets at north end of Contention Pit
• Currently drilling targets at south end of Contention pit and other targets
Vancouver, Canada – September 29, 2020 - Aztec Minerals Corp. (AZT: TSX-V, OTCQB: AZZTF) announces
it has received the results from the first five holes of its Phase 1 reverse circulation (RC) drilling program
on the Tombstone project at the historic Tombstone silver mining district in southeastern Arizona.
Four holes were drilled in a spoke pattern near the centre of the Contention open pit, highlighted by hole
TR20-02 which returned 0.94 grams per tonne (gpt) gold and 42.1 gpt silver (1.60 gpt gold equivalent
(AuEq) using an 80:1 silver:gold ratio) over 77.72 meters (m), and hole TR20-03 which returned 97.53 m
grading 0.77 gpt gold and 25.2 gpt silver (1.07 gpt AuEq). Reported lengths are apparent widths, not true
widths, which range from 20% to 50% of apparent widths.
View drill sections here:
Link to section view hole TR20-02 and hole TR20-04
Link to section view hole TR20-03 and hole TR20-04
Link to section view hole TR20-05 and hole TR20-04
All 4 holes intersected extensive gold and silver mineralization, see table below, confirming the historic
USMX drill results from 1993 and extending the mineralized zone at depth and along strike, below the
Contention open pit. All four holes also intersected old mine workings, likely dating back to the late 1800’s,
indicating that the highest-grade bonanza mineralization in the area drilled was previously mined out.
Higher grade intervals were also intersected in several drill holes. Drill hole TR20-02 intersected 3.18 gpt
gold and 136 gpt silver (4.88 gpt AuEq) over 13.72 m surrounding an old mine working. Drill hole TR20-
03 encountered 1.24 gpt gold and 31.7 gpt silver (1.64 gpt AuEq) over 35.05 m. Drill hole TR20-01 tested
a parallel structure east of the Contention pit but did not intersect any alteration or mineralization.
The area drilled near the centre of the pit (central spoke pattern) measures 145 meters north-south along
strike by 120 meters east -west perpendicular to the Contention mineralized structure, with gold-silver
mineralization still open in all directions. The area recently drilled at the north end of the pit (northern
spoke pattern) is 288 meters north of central drill pattern. Holes TR20-06 to 09 each intersected similar
widespread alteration and mineralization spanning an area 142 m long by 70 m wide. Results are pending.
“These are exciting times for Aztec”, stated CEO Simon Dyakowski, “ Our initial d rill results more than
confirm the historic gold and silver mineralization in a shallow oxide environment in, around and below
the Contention pit and the next two batches of holes from the northern and southern spoke patterns
show strong geological similarities to both the initial drill holes and the historic drill holes.”
Tombstone 2020 RC Drill Program Plan Map
The alteration and mineralization seen thus far is impressive, marked by hydrothermal breccias, abundant
quartz veining and silicification associated with gold and silver mineralization, moderate to strong
alteration, quartz feldspar porphyry dikes, and strongly altered host sandstone and siltstone throughout.
Areas of intense hematite and goethite are frequent as are mangan ese wad -quartz-calcite veins and
localized skarn alteration in limestone. Several intervals contain cerargyrite (silver chloride) in fractures,
often with fine-grained visible gold in association with the cerargyrite. Most silver and gold mineralization
are proximal to the old underground mine workings, both in hangingwall and footwall rocks.
Drill Hole From_m To_m Interval_
m *
Au_gpt Ag_gpt Au_Eq_gpt Comments
TR20-01 105
Az, -45
No significant
results
TR20-02 016
Az, -60
19.81 96.01 77.72 0.94 42.1 1.60 Excluding Voids/
16.76m of Tunnels
1.52 4.57 3.05 0.60 10.8 0.73
19.81 45.72 25.91 0.83 21.7 1.10
45.72 54.86 9.14 3.18 135.3 4.87
54.86 56.39 1.52 * * * Tunnel
Encountered *
56.39 59.44 3.05 3.19 139.5 4.93
59.44 71.63 12.19 0.23 20.4 0.48
71.63 77.72 6.10 * * * Tunnel
Encountered *
77.72 80.77 3.05 0.22 16.3 0.43
80.77 83.82 3.05 * * * Tunnel
Encountered *
83.82 92.96 9.14 0.62 21.0 0.88
92.96 96.01 3.05 0.11 4.2 0.16
96.01 102.11 6.10 * * * Tunnel
Encountered *
102.11 115.82 13.72 0.32 14.5 0.50
129.54 134.11 4.57 0.26 12.0 0.40
TR20-03 095
Az, -60
6.10 103.63 97.53 0.77 25.2 1.07 Excluding Voids/
4.57m of Tunnels
6.10 12.19 6.10 0.42 8.0 0.52
16.76 24.38 7.62 0.58 15.0 0.77
24.38 25.91 1.52 * * * Tunnel
Encountered *
25.91 39.62 10.67 0.99 24.3 1.30
39.62 42.67 3.05 * * * Tunnel
Encountered *
42.67 62.48 19.81 0.30 26.8 0.63
67.06 102.11 35.05 1.24 36.1 1.69
TR20-04, -90 18.29 82.30 54.86 0.54 25.9 0.85 Excluding Tunnel/
9.14m of Tunnel
0.00 6.10 6.10 0.43 3.3 0.47
18.29 38.10 19.81 0.84 24.2 1.15
38.10 47.24 9.14 * * * Tunnel
Encountered *
47.24 82.30 35.05 0.39 26.9 0.72
92.96 96.01 3.05 0.19 22.2 0.46
TR20-05 170
Az, -60
25.91 48.77 24.38 0.52 26.3 0.85 Excluding Tunnel/
1.52m of Tunnel
4.57 16.76 12.19 0.32 4.2 0.37
25.91 41.15 15.24 0.62 30.0 1.00
41.15 42.67 1.52 * * * Tunnel
Encountered *
42.67 48.77 6.10 0.26 17.1 0.47
59.44 62.48 3.05 0.29 7.5 0.38
77.72 82.30 4.57 0.42 8.3 0.53
1. AuEq is calculated using an 80:1 silver:gold ratio
2. True width of TR20 -02 estimated at 20% of apparent length. True width of TR20 -003 estimated at 50% of
apparent length. True width of TR20 -004 is estimated at 20% of apparent length. True width of TR20 -005
estimated at 40% of hole interval length.
Aztec is currently over half-way through the planned 2,900 metre, 20-hole Phase 1 reverse circulation (RC)
drilling program at the Tombstone Property. The company has completed 12 holes to-date, and samples
are being regularly shipped to and received by the Bureau Veritas Minerals laboratory in Hermosillo,
Mexico for geochemical analysis.
Aztec holds an option to acquire a 75% interest in the Tombstone property , which includes most of the
original patented mining claims in the district as well as some recently acquired properties . The main
target of the current RC drill program is to test for shallow, bulk tonnage, heap leachable, epithermal gold-
silver oxide mineralization adjacent and below the previously mined Contention pit.
Webinar
Aztec will host a webinar to discuss the company's recent results and current drill program. The webinar
will take place on Wednesday, Sept. 30, 2020, at 10 a.m. PT (1 p.m. ET). Management will be available to
answer questions following the presentation
Webinar Link: https://attendee.gotowebinar.com/register/8975648078966537484
Joey Wilkins, B.Sc., P.Geo., VP Exploration & Chief Geologist for Aztec, is the Qualified Person overseeing
the Tombstone exploration program. Drill cuttings are collected every 5 feet (1.52m) from all drill holes.
The samples were analyzed for gold with a 50 -gram sample size using the method FA450 followed by
AQ200. Over limits, when present, are analyzed by AR404 or FA550. All holes contain certified blanks,
standards, and duplicates as part of the quality control program. The QA/QC has delivered excellent
results to date good data integrity. Mr. Wilkins reviewed and approved the technical disclosures in this
news release.
“Simon Dyakowski”
Simon Dyakowski, Chief Executive Officer
Aztec Minerals Corp.
About Aztec Minerals – Aztec is a mineral exploration company focused on the discovery o f large
polymetallic mineral deposits in the Americas. Our core asset is the prospective Cervantes porphyry gold-
copper property in Sonora, Mexico. The historic, district -scale Tombstone properties host both bulk
tonnage epithermal gold-silver as well as C RD silver-lead-zinc mineralization in Cochise County, Arizona.
Aztec’s shares trade on the TSX-V stock exchange (symbol AZT) and on the OTCQB (symbol AZZTF).
Contact Information - For more information, please contact:
Simon Dyakowski, CEO or Bradford Cooke, Chairman
Tel: (604) 619-7469
Fax: (604) 685-9744
Email: [email protected]
Website: www.aztecminerals.com
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility
for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved
or disapproved the information contained herein.
Forward-Looking Statements:
Certain statements contained in this press release may constitute forward -looking statements under Canadian securities
legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as “expects”
or “it is expected”, or variations of such words and phrases or statements that certain actions, events or results “will” occur. These
forward-looking statements are subject to a number of risks and uncertainties. Actual results may differ materially from results
contemplated by the forward -looking statements. Factors that could cause actual results to differ materially from those in
forward-looking statements. Accordingly, the actual events may differ materially from those projected in the forward -looking
statements. When relying on forward -looking statements to make decisions, investors and others should carefully consider the
foregoing factors and other uncertainties and should not place undue reliance on such forward-looking statements. The Company
does not undertake to update any forward-looking statements, except as may be required by applicable securities laws.