ARIZONA GOLD & SILVER RECEIVES FURTHER DRILL RESULTS FROM SURFACE: to (142.5 feet) - 43.45m at 1.56 gpt gold AND FROM SURFACE: to (113.0 feet) - 34.45m at 1.32 gpt gold
NEWS RELEASE
ARIZONA GOLD & SILVER RECEIVES FURTHER DRILL RESULTS
FROM SURFACE: to (142.5 feet) - 43.45m at 1.56 gpt gold
AND
FROM SURFACE: to (113.0 feet) - 34.45m at 1.32 gpt gold
Vancouver, British Columbia, February 25, 2025 – Arizona Gold & Silver Inc. (TSXV: AZS)
(OTCQB: AZASF) is pleased to report additional continuous gold intercepts from core drilling along
strike from previously report drill holes on the Philadelphia Project in northwestern Arizona.
On the Rising Fawn target, drilling continues to return good gold grades over significant widths.
Two new holes, PC24-143 and PC24-144 have been completed. They are approximately 30
metres (“m”) (100 feet) north of drill holes PC24-141 and PC24-142 reported on February 12,
2025.
• PC24-143 (starting at surface): 142.5 ft (43.45m) at 1.56 gpt gold and 12.35 gpt silver
• PC24-144 (starting at surface): 113.0 ft (34.45m) at 1.32 gpt gold and 9.01 gpt silver
The Rising Fawn target is situated on patented mining claims within the main gold trend on the
Philadelphia Project.
New Rising Fawn Drill Results
Hole ID. From(m) To(m) Thickness(m) Gold (gpt) Silver (gpt)
PC24-143 surface 43.45 43.45 1.56 12.35
PC24-144 surface 34.45 34.45 1.32 9.01
Holes -- PC24-143 and PC24-144 start at surface and compare favorably to previously reported
drill holes PC24-140, PC24-141 and PC24-142.
Drilling on the Red Hills target to the south continued with hole PC24-133. Hole PC24-133 was
drilled down dip of reported previously hole PC24-132. Hole PC24-132 returned 13.23m of
1.216 gpt gold flanked by additional grade intervals grading between 0.267 gpt and 0.718 gpt
gold (an accumulated thickness and grade of 64.2m at 0.563 gpt gold.
Red Hills Drill Hole
Hole ID. From(m) To(m) Thickness(m) Gold (gpt) Silver (gpt)
PC24-133 172.96 182.07 9.11 0.29 --
193.26 216.04 22.78 0.25 --
233.23 241.04 7.81 0.36 --
262.44 266.31 3.87 0.41 --
No significant silver is present in hole PC24-133.
Mr. Greg Hahn, VP Exploration commented, “The width and grade of the Rising Fawn target
continues to be impressive. These results fall in line with my expectations based on the visual
logging of the drill cores. Drilling is continuing.”
To view cross-section of hole PC24-133 on the website click here.
Exploration Going Forward
Results from additional holes (including shallow sub-horizontal holes at Rising Fawn are pending
from Skyline Labs in Tucson. Current drilling is testing down dip of the Rising Fawn mineralized
intercepts reported above. Further drilling of the Red Hills target awaits assay results to guide the
siting of ongoing drilling in that area.
QA/QC Program
All assaying was conducted by ALS Global, an independent analytical laboratory. Core was
trucked to the ALS sample preparation facility in Tucson, Arizona, where the samples are
inventoried, dried, crushed and pulverized. Pulverized splits are sent to the ALS analytical
facility in Vancouver, British Columbia for analyses. All material handling is done under a strict
chain of custody protocol. Gold is determined by fire assay with an AA finish, and silver is
determined by ICP-MS methods within a 31-element suite.
The Company maintains its own program of inserting Standard Reference material in the form of
standards and blanks to the sampling stream, prior to being shipped to ALS's preparation facility
in Tucson, Arizona, in addition to the independent QA/QC protocols of ALS Global.
Qualified Person
Gregory Hahn, VP -Exploration and a Certified Professional Geologist ( #7122) is a Qualified
Person under National Instrument 43 -101 ("NI 43 -101") and has reviewed and approved the
technical information contained in this news release.
About Arizona Gold & Silver Inc.
Arizona Gold & Silver Inc. is a leading exploration company focused on uncovering precious
metal resources in Arizona and Nevada. With a commitment to sustainable practices and
innovative exploration techniques, the company aims to drive value for stakehol ders while
prioritizing environmental stewardship. The flagship asset is the Philadelphia gold-silver property,
where the Company is drilling off an epithermal gold -silver system ahead of an initial resource
calculation.
On behalf of the Board of Directors:
ARIZONA GOLD & SILVER INC.
Mike Stark, President and CEO, Director
Phone: (604) 833-4278
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS
This news release includes certain forward-looking statements or information. All statements other than statements of
historical fact included in this release are forward -looking statements that involve various risks and uncertainties.
Forward-looking statements in this news release include statements in relation to the timing, cost and other aspects of
the 2025 exploration program; the potential for development of mineral resources; the potential mineralization and
geological merits of the exploration prop erties; and other future plans, objectives or expectations of the Company.
There can be no assurance that such statements will prove to be accurate, and actual results and future events could
differ materially from those anticipated in such statements. Important factors that could cause actual results to differ
materially from the Company's plans or expectations include the risk that actual results of current and planned
exploration activities, including the results of the Company's 2025 drilling program(s) on its properties, will not be
consistent with the Company's expectations; the geology, grade and continuity of any mineral deposits and the risk of
unexpected variations in mineral resources, grade and/or recovery rates; fluctuating metals prices; possib ility of
accidents, equipment breakdowns and delays during exploration; exploration cost overruns or unanticipated costs and
expenses; uncertainties involved in the interpretation of drilling results and geological tests; availability of capital and
financing required to continue the Company's future exploration programs and preparation of geological reports and
studies; delays in the preparation of geological reports and studies; the metallurgical characteristics of mineralization
contained within the expl oration properties are yet to be fully determined; general economic, market or business
conditions; competition and loss of key employees; regulatory changes and restrictions including in relation to
required permits for exploration activities (including d rilling permits) and environmental liability; timeliness of
government or regulatory approvals; and other risks detailed herein and from time to time in the filings made by the
Company with securities regulators. In connection with the forward -looking info rmation contained in this news
release, the Company has made numerous assumptions, including that the Company's 2025 programs would proceed
as planned and within budget. The Company expressly disclaims any intention or obligation to update or revise any
forward-looking statements, whether as a result of new information, future events or otherwise, except as otherwise
required by applicable securities legislation.