Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AZS.V ·

Arizona GOLD & Silver Announces Exploraton Plan FOR Silverton GOLD- Antimony Project, Nye County, Nevada

Corporate Updates

NEWS RELEASE

ARIZONA GOLD & SILVER ANNOUNCES EXPLORATON PLAN FOR SILVERTON GOLD-

ANTIMONY PROJECT, NYE COUNTY, NEVADA

Vancouver, British Columbia, September 24, 2025 – Arizona Gold & Silver Inc.  (TSXV: AZS) 

(OTCQB:AZASF) is pleased to announce its plan to advance the Silverton gold-antimony project located in

Nye County, Nevada, immediately north of US Highway 6 roughly halfway between Tonopah and Ely.

Why Antimony?

Antimony is currently trading at US$57.50/lb. and has been designated a critical mineral by the US government

for defense purposes. The current pricing environment and government support for development of antimony

resources has prompted the company to re-assess the antimony occurrences on the Silverton property, which

have been known for some time, but which previously have been considered a trace metal signature only to a

deeper and blind primary gold occurrence.

Antimony at the Silverton Project

The Silverton property database contains multi-element geochemistry from over 2000 rock samples collected

primarily by previous companies, mostly by Newcrest Resources Inc., between 2002-2004. The database has

over 25 surface samples that contain greater than 1% antimony (Sb), for which they did not assay the over -

limits, 95 surface samples greater than 1000 ppm Sb, and 217 surface samples greater than 200 ppm. Samples

with anomalous antimony values also contain 0.1 to +1.0 grams per tonne gold values .(Figure 1).

Newcrest Resources Inc. had all surface samples prepared and analyzed at ALS Labs in Sparks, NV. Gold

was determined by Au -AA23 method which is a 30 -gram fire assay analysis with AA finish. Trace metals,

including antimony, were determined by the ME -ICP41 method, which is a four -acid digestion using ICP

analyses to report 41 elements. Overlimits >10,000 ppm were not determined. Samples consisted of both rock

chip and channel samples of unknown weight or length. Drill hole samples were analyzed by Chemex Labs,

in Reno, NV. Chemex has since been incorporated into ALS Labs. Coarse bladed stibnite is visible in all

samples containing high antimony values.

Figure 1. Rock Sample Locations Containing High Antimony Values

Newcrest Resources drilled 15 RC (reverse circulation) percussion holes that all contained anomalous

antimony values, including one hole (S-18) which intersected 20 feet at +1% Sb (they did not assay the over-

limits) between 100-120 feet (30-5-36.6 meters) depth. Historic geologic mapping on the property identified

numerous discrete quartz-stibnite veins and stringers , but the economics of antimony were not encouraging

enough to target these vein swarms specifically with drilling. The Company has re-assessed the quartz-stibnite

vein occurrences and has identified a zone roughly + 900 meters by 400 meters which shows up on satellite

imagery as highly clay-altered and contains the preponderance of quartz-stibnite veins and stockworks (Figure

2).

Figure 2: Alteration area with stibnite-quartz veins and historic drill holes with anomalous antimony

The potential is high for a near-surface deposit of antimony, composed of high-grade veins such as what was

hit in historic hole S-18 and surrounding stockwork of antimony veinlets. This is an easy target to test with

shallow drill holes.

Drilling Program Permitted

The Company submitted a Notice of Intent (NOI) to the US Bureau of land Management to drill 27 reverse

circulation drill holes from 17 drill pads and build associated access road (Figure 3). Approval of the NOI was

received on September 18, 2025 subject to posting of the appropriate financial guarantee for site reclamation

(bond). The bond was posted on September 23, 2025, and f ormal approval to proceed with roadwork and

drilling is pending. Twenty-four (24) of the proposed holes will test the quartz-antimony veins and three holes

will test the nearby MT anomaly that was detected and quantified by a helicopter MT survey over the property

in May-June 2023. See website at https://Arizonagoldsilver.com/Silverton/ for more details on the MT survey.

Figure 3. Proposed Drilling Program Recently Permitted

Plan is to Joint Venture the Property

The current plan is to entertain joint venture proposals to test the antimony -gold and MT targets in order for

the Company to focus on the advancement of its high-grade Philadelphia gold project in Arizona.

Qualified Person

Gregory Hahn, VP -Exploration and a Certified Professional Geologist (#7122) is a Qualified Person under

National Instrument 43-101 ("NI 43-101") and has reviewed and approved the technical information contained

in this news release.

About Arizona Gold & Silver Inc.

Arizona Gold & Silver Inc. is a leading exploration company focused on uncovering precious metal resources

in Arizona and Nevada. With a commitment to sustainable practices and innovative exploration techniques,

the company aims to drive value for stakehol ders while prioritizing environmental stewardship. The flagship

asset is the Philadelphia gold -silver property where the Company is drilling off an epithermal gold -silver

system ahead of an initial resource calculation.

On behalf of the Board of Directors:

ARIZONA GOLD & SILVER INC.

Mike Stark, President and CEO, Director

Phone: (604) 833-4278

MT Anomaly

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CAUTION CONCERNING FORWARD-LOOKING STATEMENTS

This news release includes certain forward -looking statements or information. All statements other than statements of

historical fact included in this release are forward -looking statements that involve various risks and uncertainties.

Forward-looking statements in this news release include statements in relation to the timing, cost and other aspects of the

2024 exploration program; the potential for development of the mineral resources; the potential mineralization and

geological merits of the exploration properties; and other future plans, objectives or expectations of the Company. There

can be no assurance that such statements will prove to be accurate and actual results and future events could differ

materially from those anticipated in such statements. Important factors that could cause actual results to differ materially

from the Company's plans or expectations include the risk that actual results of current and planned exploration activities,

including the results of the Company's 202 5 drilling program (s) on its properties, will not be consistent with the

Company's expectations; the geology, grade and continuity of any mineral deposits and the risk of unexpected variations

in mineral resources, grade and/or recovery rates; fluctuating metals prices; pos sibility of accidents, equipment

breakdowns and delays during exploration; exploration cost overruns or unanticipated costs and expenses; uncertainties

involved in the interpretation of drilling results and geological tests; availability of capital and fin ancing required to

continue the Company's future exploration programs and preparation of geological reports and studies; delays in the

preparation of geological reports and studies; the metallurgical characteristics of mineralization contained within the

exploration properties are yet to be fully determined; general economic, market or business conditions; competition and

loss of key employees; regulatory changes and restrictions including in relation to required permits for exploration

activities (including drilling permits) and environmental liability; timeliness of government or regulatory approvals; and

other risks detailed herein and from time to time in the filings made by the Company with securities regulators. In

connection with the forward -looking i nformation contained in this news release, the Company has made numerous

assumptions, including that the Company's 2025 programs would proceed as planned and within budget. The Company

expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of

new information, future events or otherwise, except as otherwise required by applicable securities legislation.