Positive Initial Metallurgical Results from Azarga Metals’ Unkur Copper-Silver Project

Metallurgy & Processing

AZARGA METALS CORP.

UNIT 1 – 15782 MARINE DRIVE, WHITE ROCK, B.C. V4B 1E6, CANADA

www.azargametals.com

FOR IMMEDIATE RELEASE

JUNE 9, 2020 TSX-V: AZR

POSITIVE INITIAL METALLURGICAL RESULTS FROM AZARGA METALS’ UNKUR

COPPER-SILVER PROJECT

• Recoveries up to 92% copper and 88% silver in sulphide material using

conventional flotation methods

• Commercially standard ~30% copper concentrate achievable with sulphide

material

• Recoveries up to 96.4% copper and 96.7% silver in oxide material

AZARGA METALS CORP. ("Azarga Metals" or the “Company”) (TSX-V:AZR) reports

initial results have been received from the metallurgical test work on samples taken from

the recently completed drilling program on the Unkur Copper -Silver Project in Eastern

Russia. Previous metallurgical tests from Unkur used only oxidized material taken from a

surface outcrop and it was therefore important to have metallurgical tests on more

representative material – both oxidized and sulphide material taken from deeper parts of

the Unkur mineralization.

Michael Hopley, President and CEO said: “These initial results from the lab are very

encouraging; the recoveries of both copper and silver in the sulphide using standard

flotation tests are better than one usually expected in preliminary test work, 92% and 88%

respectively. The potential of being abl e to achieve a 30% copper concentrate– a very

saleable product – is also very encouraging. Additionally, the positive results of the leach

tests on oxide material – 96% copper in an acid leach and over 96% silver in a cyanide

leach raise the possibility of being able to use heap leaching as a means of copper and

silver recovery for that material.”

The consultant laboratory charged with completing these tests “The Eastern Mining and

Metallurgical Research Institute for Non- Ferrous Metals ” (VNIITsvetMet) based in

Kazakhstan reports that the chemical analysis of the drill core samples sent for

metallurgical tests are as follows:

Metal Oxide Sulphide

Copper % 0.56 0.56

Silver g/t 30.8 38.0

Gold g/t 0.07 <0.05

Page 2

AZARGA METALS CORP.

UNIT 1 – 15782 MARINE DRIVE, WHITE ROCK, B.C. V4B 1E6, CANADA

www.azargametals.com

The above results are considered positive because they represent close to the anticipated

average grade of the Unkur deposit and no elevated values of harmful components, such

as arsenic, were identified in mineralized material.

Metallurgical Recovery Tests – Sulphide

Using standard flotation methods, the mineral recovery tests revealed optimum flotation

recovery for copper minerals can be achieved for ±80% - 0.071 mm in sulphide material.

Open cycle tests with two cleanings of raw concentrate showed between 87.2 to 92%

recovery of copper and a possibility of producing a 30% copper concentrate. Maximum

recoveries for silver were achieved at a ±90% material ground to - 0.071 mm. Summary

table;

Flotation Tests Percent Recovery

Copper 87.2 – 92.0

Silver* 82.1 – 88.0

*Preliminary results

Metallurgical Recovery Tests – Oxide

Sulphuric acid leach tests showed 73.6 to 96.4% recoveries of copper depending on

fraction size at -20 mm, - 10 mm, and -0.071 mm; the best recoveries were achieved by

using -0.071 mm fraction size. Using the -0.071 mm fraction size, a cyanide leach over a

2 day period showed a 56.2% recovery for copper and a 96.7% for silver.

Leach Tests Sulphuric Acid Cyanide Leach

Copper recovery 73.6 – 96.4% 56.2%

Silver recovery Not applicable 96.7%

The laboratory work also included a phase analysis of copper minerals identified in the

oxide and unoxidized phase of mineralization, which confirms observations of the drill

core, summarized as follows:

Copper Minerals Oxide % Sulphide%

Chalcanthite 12.5 3.4

Malachite, azurite,

chrysocolla, cuprite,

tenorite

83.9 0.2

Bornite, chalcocite,

covellite

1.8 42.8

Chalcopyrite 1.8 53.6

Totals 100.0 100.0

Page 3

AZARGA METALS CORP.

UNIT 1 – 15782 MARINE DRIVE, WHITE ROCK, B.C. V4B 1E6, CANADA

www.azargametals.com

The proportion of acid soluble copper in the oxide material is 96.4%. The proportion of

copper sulphides in the sulphide sample is 96.4%. Phase analysis for silver is in progress.

However, silver was microscopically recorded.

Qualified Person

Azarga Metals’ President and CEO Michael Hopley, a Qualified Person as defined by NI

43-101, verifies the data disclosed and has reviewed and approved the disclosure

contained in this Press Release.

About Azarga Metals Corp.

Azarga Metals is a mineral exploration and development company that owns 100% of the

Unkur Copper-Silver Project in the Zabaikalsky administrative region in eastern Russia.

On completion of a first phase physical exploration program in 2016-2018, the Company

estimated an Inferred Resource of 62 million tonnes at 0.53% copper and 38.6g/t silver

for the project in the report entitled “Technical Report and Preliminary Economic

Assessment for the Unkur Copper -Silver Project, Kodar -Udokan, Russian Federation”

dated effective 30, August 2018 authored by Tetra Tech Mining & Minerals. The Resource

remains open in both directions along strike and down-dip.

AZARGA METALS CORP.

"Michael Hopley"

Michael Hopley,

President and Chief Executive Officer

For further information please contact: Doris Meyer, at +1 604 536- 2711 ext. 6, visit

www.azargametals.com or follow us on Twitter @AzargaMetals. The address of the head

office of Azarga Metals is Unit 1 - 15782 Marine Drive, White Rock, BC V4B 1E6, British

Columbia, Canada.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

Cautionary Statement:

This news release contains forward- looking statements that are based on the Corporation's current

expectations and estimates. Forward- looking statements are frequently characterized by words such as

"plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar

words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements

involve known and unknown risks, uncertainties and other factors that could cause actual events or results

to differ materially from estimated or anticipated events or results implied or expressed in such forward-

looking statements. Such factors include, among others: the actual results of current planned exploration

Page 4

AZARGA METALS CORP.

UNIT 1 – 15782 MARINE DRIVE, WHITE ROCK, B.C. V4B 1E6, CANADA

www.azargametals.com

activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be

refined; possible variations in mineralization grade or recovery rates; accidents, labor disputes and other

risks of the mining industry; delays in obtaining governmental appr ovals or financing; and fluctuations in

metal prices. There may be other factors that cause actions, events or results not to be as anticipated,

estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and,

except as may be required by applicable securities laws, the Company disclaims any intent or obligation to

update any forward-looking statement, whether as a result of new information, future events or results or

otherwise. Forward-looking statements are not a guarantee of future performance and accordingly undue

reliance should not be put on such statements due to the inherent uncertainty therein.