Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AZR.V ·

Azarga Metals Files Unkur Preliminary Economic Assessment Technical Report

Resource Estimates Technical Reports (NI 43-101) Economic Studies

AZARGA METALS CORP.

UNIT 1 – 15782 MARINE DRIVE, WHITE ROCK, B.C. V4B 1E6, CANADA

www.azargametals.com

FOR IMMEDIATE RELEASE

15 October 2018 TSX-V: AZR

AZARGA METALS FILES UNKUR

PRELIMINARY ECONOMIC ASSESSMENT TECHNICAL REPORT

HIGHLIGHTS:

• Positive PEA result achieved based only on 2018 Mineral Resource as an ‘initial

option’ with significant growth potential

• Open-pit mine with annual production rate of 2 million tonnes of mill feed per

year and conventional processing circuit to produce a very high-grade copper

and silver concentrate

• Average of 13,217 tonnes of copper and 3. 70 million ounces of silve r metal

contained in concentrate production per year over 8-year life of mine

• Pre-tax net present value of US$20 3.6 million (post -tax US$147. 5 million) and

internal rate of return of 28.9%

• Updated ‘follow -on’ PEA to be prepared following completion of exploration

works to grow the Mineral Resource at Unkur

AZARGA METALS CORP. ("Azarga Metals" or the “ Company”) (TSX-V:AZR) has filed a

technical report titled “Technical Report and Preliminary Economic Assessment for the Unkur

Copper-Silver Project, Kodar-Udokan, Russian Federation” dated effective 30 August 2018 (the

“Unkur PEA”) for its Unkur Copper-Silver Project in Russia to support the Preliminary Economic

Assessment announced on 30 and 31 August, 2018.

The Unkur PEA Report was prepared in accordance with National Instrument 43 -101 (NI 43 -

101) and is filed on the Company’s profile on www.sedar.com and is also available on the

Company’s web site.

The Unkur PEA is based on the current Inferred Mineral Resource estima te for Unkur of 62

million tonnes at 0.53% copper and 38.6g/t silver, containing 328,600 tonnes (724 million

pounds) of copper and 76.8 million troy ounces of silver, as announced by the Company on 27

March 2018 (“2018 Mineral Resource”).

The Unkur PEA is preliminary in nature and is based on Inferred Mineral Resources that are

currently considered too speculative geologically to have the economic considerations applied

to them that would enable them to be categorized as mineral reserves, and there is no certainty

Page 2

that the Unkur PEA will be realized. There is no certainty that the Inferred Resources will be

converted to the Indicated or Measured categories, or that the potential Indicated or Measured

Resources would be converted to the Proven or Probable Min eral Reserve categories. Mineral

Resources that are not Mineral Reserves do not have demonstrated economic viability.

Qualified Person

The results of the 2018 Mineral Re sources and Unkur PEA prepared by Tetra Tech have been

reviewed by the Company’s tec hnical staff, including Dorian (Dusty) Nicol B.Sc. Geo, MA Geo

the Company’s President and Chief Executive Officer and, a Qualified Person as defined by NI

43-101. Mr. Nicol is also the person responsible for preparation of the technical information

contained in this news release.

The following Qualified Persons have participated in the Unkur PEA or are responsible for

specific inputs into the Unkur PEA:

Qualified Person Company

Joseph Hirst BSc (Hons), MSc, CGeol,

EurGeol, FGS

Tetra Tech

Robin Simpson MAIG SRK Consulting (Russia) Ltd.

Euring Andrew Carter CEng, BSc, MIMMM,

MSAIMM, SME

Tetra Tech

Matthew M. Randall BSc (Hons), PhD, CEng,

MIMMM

Director, Axe Valley Mining

Consultants Ltd.

About Azarga Metals Corp.

Azarga Metals is a mineral exploration and development company that owns 100% of the Unkur

Copper-Silver Project in the Zabaikalsky administrative region in eastern Russia.

AZARGA METALS CORP.

"Dusty Nicol"

Dorian L. (Dusty) Nicol, President and CEO

For further information please contact: Doris Meyer, at +1 604 536-2711 ext 6, visit

www.azargametals.com, or follow us on Twitter @AzargaMetals.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this release.

Page 3

Cautionary Statement:

This news release contains forward -looking statements that are based on the Corporation's current

expectations and esti mates. Forward-looking statements are frequently characterized by words such as

"plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other

similar words or statements that certain events or conditions "may" or "will" occur. Such forward -looking

statements involve known and unknown risks, uncertainties and other factors that could cause actual

events or results to differ materially from estimated or anticipated events or results implied or expressed

in such fo rward-looking statements. Such factors include, among others: the actual results of current

planned exploration activities; conclusions of economic evaluations; changes in project parameters as

plans to continue to be refined; possible variations in ore gr ade or recovery rates; accidents, labor

disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing;

and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be

as anticipated, estimated or intended. Any forward -looking statement speaks only as of the date on which

it is made and, except as may be required by applicable securities laws, the Corporation disclaims any

intent or obligation to update any forward -looking statement, whether as a result of new information,

future events or results or otherwise. Forward -looking statements are not guarantees of future

performance and accordingly undue reliance should not be put on such statements due to the inherent

uncertainty therein.