Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AZR.V ·

Azarga Metals Commences Field Work at Its Unkur Copper-Silver Project, Eastern Russia

Exploration Programs

AZARGA METALS CORP.

UNIT 1 – 15782 MARINE DRIVE, WHITE ROCK, B.C. V4B 1E6, CANADA

www.azargametals.com

FOR IMMEDIATE RELEASE

AUGUST 6, 2019 TSX-V: AZR

AZARGA METALS COMMENCES FIELD WORK AT ITS UNKUR COPPER-SILVER

PROJECT, EASTERN RUSSIA

AZARGA METALS CORP. ("Azarga Metals" or the “ Company”) (TSX-V:AZR) reports that a

geophysical survey and other field work at the Unkur Copper-Silver Project in Eastern Russia

have commenced following a recent visit to the property earlier this month by Michael Hopley

(President and C.E.O.) and Dr. Alexander Yakubchuk (V.P. Exploration).

Michael Hopley, President and CEO of Azarga Metals comments: “The mineralization at Unkur

seen in the field visit with Dr. Yakubchuk is impressive both in outcrop and in drill core.

On the ground I was also pleased to see the amount of work achieved by the Soviet era

exploration programs in which multiple zones of mineralization were discovered in a

property-wide reconnaissance and trenching program”.

Mr. Hopley went on to say “ I was struck with the large-scale widespread nature of the

mineralization at Unkur and, based on Dr. Yakubchuk’s familiarities with the other deposits

in the area, with the many apparent geological similarities to the giant Udokan deposit

where the mine is currently being constructed by the owners Baikal Mining Company and

which is reported to contain 24 million tonnes of copper and is located just 30 km to the

south of Unkur”.

Magnetic survey data exists over the northwest part ( representing about 2 0%) of the Unkur

property – where all of the previous drilling and all of the current resources are located. There is

an obvious strong spatial correlation between zones of copper-silver mineralization at Unkur with

zones of contrast between magnetic highs and lows and this correlation was used successfully in

guiding the 2016/2017 drilling program (see details in June 26, 2019 AZR news release) which is

the basis of the current resources (see below for more detail). It is therefore important to have the

remaining part of the property covered with a magnetic survey in order to guide the upcoming

6,000 meter drilling program expected to start this autumn.

The geophysical survey will also include a 28 line-kilometers induced polarization survey that is

expected to define new zones of copper -silver mineralization and assist in designing the

upcoming drilling program.

The sub-contractor should finish the geophysical surveys by the end of September 2019, although

partial results will be made available to the Company periodically.

Other ongoing field operations currently underway at Unkur include detailed re-logging of the drill

core from the 2016 –2017 season for a more complete understanding of the controls of

mineralization and the relationship between the sedimentary rocks hosting the copper-silver

mineralization and the highly magnetic hematite-magnetite rich sedimentary units.

Page 2

AZARGA METALS CORP.

UNIT 1 – 15782 MARINE DRIVE, WHITE ROCK, B.C. V4B 1E6, CANADA

www.azargametals.com

About Azarga Metals Corp.

Azarga Metals is a mineral exploration and development company that owns 100% of the Unkur

Copper-Silver Project in the Zabaikalsky administrative region in eastern Russia. Unkur is a

copper-silver discovery of global significance. On completion of a first phase physical exploration

program in 2016-2018, the Company reported an NI43-101 Inferred Resource of 62 million tonnes

at 0.53% copper and 38.6g/t silver for the project (see news release 15 October 2018) . The

Resource remains open in both directions along strike and down-dip.

AZARGA METALS CORP.

"Michael Hopley"

Michael Hopley,

President and Chief Executive Officer

For further information please contact: Doris Meyer, at +1 604 536-2711 ext. 6, visit

www.azargametals.com, or follow us on Twitter @AzargaMetals. The address of the head

office of Azarga Metals is Unit 1 - 15782 Marine Drive, White Rock, BC V4B 1E6, British

Columbia, Canada.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Statement:

This news release contains forward -looking statements that are based on the Corporation's current

expectations and estimates. Forward -looking statements are frequently characterized by words such as

"plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar

words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements

involve known and unknown risks, uncertainties and other factors that could cause actual events or results

to differ materially from estimated or anticipated events or results implied or expressed in such forward -

looking statements. Such factors include, among others: the actual results of curren t planned exploration

activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be

refined; possible variations in ore grade or recovery rates; accidents, labor disputes and other risks of the

mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices .

There may be other factors that cause actions, events or results not to be as anticipated, estimated or

intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may

be required by applicable securities laws, the Corporation disclaims any intent or obligation to update any

forward-looking statement, whether as a result of new information, future events or results or otherwise .

Forward-looking statements are not guarantees of future performance and accordingly undue reliance

should not be put on such statements due to the inherent uncertainty therein.