Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AZM.V ·

Azimut Reports Continuous Progress on the Elmer Property

Corporate Updates

Azimut Reports Continuous Progress on the

Elmer Property

TSXV: AZM

OTCQX: AZMTF

LONGUEUIL, QC

,

Sept. 13, 2022

/CNW Telbec/ -

Azimut Exploration Inc.

("Azimut" or the

"Company") (TSXV: AZM) (OTCQX: AZMTF) is pleased to report significant exploration progress on

the Company's 100% owned

Elmer Gold Property

(the "Property") in the Eeyou Istchee James

Bay region of

Quebec

:

Delineation drilling program

on the Patwon Gold Zone completed down to 800 metres

Additional drill holes planned to expand and optimize the shape of a potential open pit resource

Exploration drilling program

currently testing nearby quality targets

Prospecting program

uncovering potential attractive zones along the 35-km-long Property

Delineation Drilling of the Patwon Gold Zone

(

see Figures 1 to 4, Tables 1 and 2, Photos 1 and 2

)

This release reports the results of 11 additional drill holes for 9,375.3 metres, including 2 holes

for which results are still partial (holes ELM22-160 and -167).

Highlights

Hole ELM22-161

2.02 g/t Au over

23.5 m

(from

861.0 m

to

884.5 m

) including

4.54 g/t Au over

2.50 m

14.74 g/t Au over

2.35 m

Hole ELM22-160

2.81 g/t Au over

9.2 m

(from 808.6 to

817.8 m

) including

26.8 g/t Au over

0.8 m

8.50 g/t Au over

1.7 m

(from

827.3 m

to

829.0 m

)

1.01 g/t Au over

11.0 m

(from

843.0 m

to

854.0 m

)

10.9 g/t Au over

1.0 m

(from

901.0 m

to

902.0 m

)

Hole ELM22-167

4.26 g/t Au over

5.22 m

(from

748.0 m

to

753.22 m

) including

7.74 g/t Au over

2.12 m

Hole ELM22-158C

1.89 g/t Au over

11.0 m

(from

912.0 m

to

923.0 m

) including

4.07 g/t Au over

4.25 m

4.30 g/t Au over

2.0 m

Hole ELM22-153

2.75 g/t Au over

6.2 m

(from

598.8 m

to

605.0 m

)

As of today, 44 holes for 29,883 metres have been drilled since the start of the current

delineation phase initiated in

October 2021

. The results of 33 holes for 20,226 metres of this

phase have now been reported (

see

press releases of

March 10

,

April 27

,

May 30, 2022

, and

this release

).

Patwon has to date been delineated down to 800 meters with 115 holes totalling 48,381 metres

since the original announcement of the discovery (

press release of

January 14, 2020

). A

complete updated drilling database is under review and will be made available when completed.

All indications are that the Patwon Zone remains open at depth and probably along strike.

Deepest drill hole results may indicate a slight change of the mineralized body axis which

appears shifted to the east.

Preliminary evaluation of the mineralized material from surface down to 400 metres, indicates

the potential to expand the size of an open pit resource. In addition, specific sets of veins need

to be further assessed by several in-fill holes. For these purposes, drilling of about ten (10)

additional holes for 3,000 metres will be undertaken this fall season.

Pending results will be reported once assay results are received and interpreted. Complete

results of this phase will be incorporated into a

maiden mineral resource estimate

supported

by a technical report compliant with National Instrument 43-101

.

Exploration Drilling Program

(

see Figure 5

)

As of today, 25 holes for 5,930,9 metres have been drilled since the start of the current

exploration phase initiated in

October 2021

.

This program, which will total a minimum 8,000 metres, is in progress to test twelve (12)

sectors located along strike and subparallel to Patwon (

see press release of

28 July 2022

).

These targets have been defined following the systematic collection of data including:

507 reverse circulation ("RC") holes for 6,681 metres of drilling;

Induced polarization and high resolution heliborne magnetic surveys;

Prospecting and till sampling; and

Complete geological and structural reinterpretation of the Property.

Drilling at three (3) of these targets will follow-up from previously disclosed results over multiple

kilometre-long

sectors:

Gabbro Prospect

,

881 Zone

and

Wolf Prospect

(

press releases of

November 11, 2021

,

April 6, 2022

,

and

July 28, 2022

).

Prospecting Program

(

see Figure 6

)

As of today, 177 rock grab samples have been collected from six target areas, for which assay

results are pending. At least three new mineralized prospects have been uncovered.

The current program is planned to conduct initial assessments and follow-ups on 20 distinct

targets located over the 35-km-long Elmer Property.

Azimut's management considers the Property as clearly underexplored with a significant

additional discovery potential supported by surface work. New targets have been identified and

ranked through the advanced geochemical processing of the bedrock database acquired from

prospecting, core drilling and RC drilling phases. A distinctive silver-bismuth-tellurium-tungsten

"Patwon-style" footprint is recognized, well correlated with the gold content.

The Elmer Property comprises 515 claims (271.3 km

2

) over a 35-kilometre strike length. The

Property lies 285 kilometres north of the town of

Matagami

, 60 kilometres east of the village of

Eastmain

, and 5 kilometres west of the paved Billy-Diamond Highway, a major all-season

highway. The region benefits from excellent infrastructure, including significant road access, a

hydroelectric power grid, and airports.

Drilling Contracts and Analytical Protocols

RJLL Drilling Inc. of

Rouyn-Noranda, Quebec

was the contractor for the delineation phase at

Patwon. The core diameter is NQ. Chibougamau Drilling Ltd of

Chibougamau, Quebec

, is carrying

out the exploration drilling operations with a core diameter of BTW.

Samples are sent to ALS Laboratories in

Val d'Or

, Québec, where gold is analyzed by fire assay,

with atomic absorption and gravimetric finishes for grades above 3.0 g/t Au. Samples are also

analyzed for a 48-element suite using ICP. Azimut applies industry-standard QA/QC procedures to

its drilling programs. All batches sent for analysis include certified reference materials, blanks, and

field duplicates.

Dr.

Jean-Marc Lulin

, P.Geo., prepared this press release as Azimut's Qualified Person under

National Instrument 43-101.

Brigitte Dejou

, P.Eng., Project Manager, and François Bissonnette,

P.Geo. Operations Manager, have also reviewed the content of this press release.

About Azimut

Azimut is a leading mineral exploration company with a solid reputation for target generation and

partnership development. The Company holds the largest mineral exploration portfolio in

Quebec

.

Azimut is actively advancing its wholly-owned flagship

Elmer Gold Project

to the initial resource

stage in the

James Bay

region.

The Company uses a pioneering approach to big data analytics (the proprietary

AZtechMine

TM

expert system), enhanced by extensive exploration know-how. Azimut's competitive

edge is based on systematic regional-scale data analysis and concurrently active projects. Azimut

maintains rigorous financial discipline and a strong balance sheet, with 79.3 million shares issued and

outstanding.

www.azimut-exploration.com

Cautionary note regarding forward-looking statements

This press release contains forward-looking statements, which reflect the Company's current

expectations regarding future events related to the drilling results at the Elmer Property. To the

extent that any statements in this press release contain information that is not historical, the

statements are essentially forward-looking and are often identified by words such as "consider",

"anticipate", "expect", "estimate", "intend", "project", "plan", "potential", "suggest" and "believe". The

forward-looking statements involve risks, uncertainties, and other factors that could cause actual

results to differ materially from those expressed or implied by such forward-looking statements.

There are many factors that could cause such differences, particularly volatility and sensitivity to

market metal prices, impact of change in foreign currency exchange rates and interest rates,

imprecision in reserve estimates, recoveries of gold and other metals, environmental risks

including increased regulatory burdens, unexpected geological conditions, adverse mining

conditions, community and non-governmental organization actions, changes in government

regulations and policies, including laws and policies, global outbreaks of infectious diseases,

including COVID-19, and failure to obtain necessary permits and approvals from government

authorities, as well as other development and operating risks. Although the Company believes that

the assumptions inherent in the forward-looking statements are reasonable, undue reliance should

not be placed on these statements, which only apply as of the date of this document. The

Company disclaims any intention or obligation to update or revise any forward-looking statement,

whether as a result of new information, future events or otherwise, other than as required to do so

by applicable securities laws. The reader is directed to carefully review the detailed risk discussion

in our most recent Annual Report filed on SEDAR for a fuller understanding of the risks and

uncertainties that affect the Company's business.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release

.

SOURCE

Azimut Exploration Inc.

View original content:

http://www.newswire.ca/en/releases/archive/September2022/13/c6481.html

%SEDAR: 00003284E

For further information:

Jean-Marc Lulin, President and CEO, Tel.: (450) 646-3015, Fax: (450)

646-3045; Jonathan Rosset, Vice President Corporate Development, Tel: (604) 202-7531,

[email protected]

CO: Azimut Exploration Inc.

CNW 06:30e 13-SEP-22