Azimut Expands its Flagship Elmer Project with the Acquisition of the K2 Property Longueuil, Quebec – Azimut Exploration Inc. (“Azimut” or the “Company”) (TSXV: AZM) (OTCQX: AZMTF) is pleased to announce that it has entered into a binding purchase and sale agreement (the “Agreement”) with
For immediate release
July 3, 2025
TSXV: AZM
OTCQX: AZMTF
Press Release
Azimut Expands its Flagship Elmer Project with the
Acquisition of the K2 Property
Longueuil, Quebec – Azimut Exploration Inc. (“Azimut” or the “Company”) (TSXV: AZM) (OTCQX: AZMTF)
is pleased to announce that it has entered into a binding purchase and sale agreement (the “Agreement”) with
Dios Exploration Inc. (“Dios”) to acquire their K2 Property adjacent to the Elmer Property (the “Property”) in the
Eeyou Istchee James Bay (“James Bay”) region of Quebec, Canada (see Figures 1 to 3).
Under the Agreement, Azimut will acquire 100% interest in 103 claims covering 54.3 km2 forming the K2
Property (the “K2 claims” or “K2 block”) for a cash payment of C$120,000 and the issuance of 200,000 common
shares of Azimut. Dios will retain a 2.0% NSR royalty on the K2 claims, subject to a buydown of 1.0% NSR for
C$3,000,000. The parties were dealing at arm’s length. The Agreement is subject to approval by the TSX
Venture.
Strengthening the Elmer Project
The acquisition of the K2 claims enables Azimut to consolidate its strategic position along the Lower Eastmain
Archean greenstone belt, where the Company has defined an initial gold resource on the Patwon Zone (NI 43-
101 Report; see link below). The K2 block includes 25 gold and copper-gold-silver prospects and extends the
Elmer Property by an additional seven (7) kilometres of strike length. The following mineralized settings have
been identified on the K2 claims:
• Gold and copper-gold-silver veins, stockworks, and fracture fillings within porphyritic felsic intrusions;
• Gold or copper-silver mineralization within sheared felsic volcanic rocks;
• Potential volcanogenic polymetallic mineralization (Cu-Ag-Au-Zn) hosted in felsic volcanic units.
The prospects of the K 2 block further highlight the mineral endowment recognized at the scale of the Elm er
Property. A scoping study is currently underway to reassess the various growth opportunities at Elm er (see
press release dated March 31, 2025). The Patwon gold deposit remains open along strike and at depth, with
several drill-ready targets nearby that could expand the resource base. The newly acquired K2 block prospects
will also be reassessed, which will contribute to expanding the 2025 work program.
About the Elmer Property
The Elmer Property now comprises 658 claims (346.6 km2) in one block over a 42.8-kilometre strike length.
This includes the 103 claims acquired from Dios as well as 32 additional claims recently acquired by Azimut
through map designation. The Property lies 285 kilometres north of the town of Matagami, 60 kilometres east
of the village of Eastmain, and 5 kilometres west of the paved Billy-Diamond Highway, a major all-season road.
The region benefits from excellent infrastructure, including significant ro ad access, a hydroelectric power grid
and airports.
Qualified Person
Dr. Jean-Marc Lulin (P.Geo.), Azimut’s President and CEO, prepared this press release and approved the
scientific and technical information disclosed herein , including the previously reported results presented by
Azimut in the figures supporting this press release. He is acting as the Company’s qualified person within the
meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.
About Azimut
Azimut is a leading mineral exploration company with a solid reputation for target generation and partnership
development. The Company holds the largest mineral exploration portfolio in Quebec, controlling strategic land
positions for gold, copper, nickel and lithium.
The Company’s wholly owned flagship project, the Elmer Gold Project, is at the resource stage ( 311,200 oz
Indicated and 513,900 oz Inferred using a gold price of US$1,800 per ounce*) and has a strong exploration
upside. Significant exploration activities are planned in 2025 on the Wabamisk (antimony-gold, lithium) and
Kukamas (nickel-copper-PGE) projects. Azimut also holds a significant position in an emerging district with its
Galinée lithium discovery in joint venture with SOQUEM Inc.
Azimut uses a pioneering approach to big data analytics (the proprietary AZtechMine™ expert system)
enhanced by extensive exploration know -how. The Company’s competitive edge is based on systematic
regional-scale data analysis. Azimut maintains rigorous financial discipline and a strong balance sheet.
Contact and Information
Jean-Marc Lulin, President and CEO
Tel.: (450) 646-3015 – Fax: (450) 646-3045
Jonathan Rosset, Vice President Corporate Development
Tel: (604) 202-7531
[email protected] www.azimut-exploration.com
(*) Technical Report and Initial Mineral Resource Estimate for the Patwon Deposit, Elmer Property, Quebec, Canada, dated
January 4, 2024, and prepared by Martin Perron, P.Eng., Chafana Hamed Sako, P.Geo., Vincent Nadeau-Benoit, P.Geo.,
and Simon Boudreau, P.Eng., of InnovExplo Inc.
The results of Azimut’s work since it acquired the Elmer Property in 2018, including those reported in this press release,
have been disclosed in 51 press releases available on the Company’s website or through SEDAR ( www.sedarplus.ca).
Related technical reports have been filed with the Ministère des Ressources naturelles et des Forêts du Québec and are
available through SIG ÉOM. References to exploration reports relevant to the Property prior to Azimut’s acquisition are
listed in the NI 43-101 report noted above. Mineralized results pertaining to the K2 claim block, including the 25 identified
prospects, are duly referenced in the SIGÉOM database and are publicly available. Please note that grab samples are
selective by nature and unlikely to represent average grades.
Cautionary note regarding forward-looking statements
This press release contains forward -looking statements, which reflect the Company’s current expectations regarding future events
related to the Elmer Property. To the extent that any statements in this press release contain information that is not historical , the
statements are essentially forward -looking and are often identified by words such as “consider” , “anticipate”, “expect”, “estimate”,
“intend”, “project”, “plan”, “potential”, “suggest” and “believe”. The forward -looking statements involve risks, uncertainties, and other
factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. Many
factors could cause such differences , particularly volatility and sensitivity to market metal prices , the impact of changes in foreign
currency exchange rates and interest rates, imprecision in reserve estimates, recoveries of gold and other metals, environmental risks
including increased regulatory burdens , unexpected geological conditions , adverse mining conditions , community and non -
governmental organization actions, changes in government regulations and policies, including laws and policies, global outbreaks of
infectious diseases, including COVID-19, and failure to obtain necessary permits and approvals from government authorities, as well
as other development and operating risks. Although the Company believes that the assumptions inherent in the forward -looking
statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this document.
The Company disclaims any intention or obligation to update or revise any forward -looking statement, whether as a result of new
information, future events or otherwise, other than as required to do so by applicable securities laws. The reader is directed to carefully
review the detailed risk discussion in our most recent Annual Report filed on SEDAR+ for a fuller understanding of the risks and
uncertainties that affect the Company’s business.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.