Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AZM.V ·

Azimut expands Drilling Program on the Elmer Gold Discovery Symbol: AZM.TSX Venture

Exploration Programs

Azimut expands Drilling Program on the Elmer

Gold Discovery

Symbol: AZM.TSX Venture

LONGUEUIL, QC

,

June 29, 2020

/CNW Telbec/ -

Azimut Exploration Inc.

("Azimut" or the

"Company") (

TSXV: AZM

) is pleased to provide an update on the diamond drilling program on its

wholly owned

Elmer Property

in the Eeyou Istchee James Bay region of

Quebec

(

see Figures 1 and 2

). A total of 6,399 metres (32 holes) has been drilled since late

May 2020

.

Based on initial core examination, Azimut's management has decided to expand the ongoing program

to 10,000 metres, from the 6,000 metres initially planned, to further assess the main target (ELM-1)

and other previously identified targets (see press releases of

January 14

and March 18, 2020).

Assay results are pending.

Two rigs have drilled the following thus far:

5,610 metres (26 holes) to test the lateral and depth continuity of the Patwon Gold Discovery

255 metres (2 holes) to test other parts of the ELM-1 target

534 metres (4 holes) to test the ELM-2 and ELM-3 targets.

Drill hole locations are shown on

Figures 3 and 4

, and the coordinates are provided in

Table 1

.

Samples from eleven (11) of the holes have been sent to the ALS Minerals laboratory in

Val-d'Or,

Quebec

.

Visual observations from several holes support the expanded drilling program:

Significant quartz veining and pyrite (finely to coarsely disseminated pyrite, semi-massive to

massive pyrite stringers)

Significant associated alteration (pervasive silica, sericite, chlorite, tourmaline and carbonates)

Presence of native gold grains.

Five main target areas (ELM-1 to ELM-5) are located within a highly prospective corridor 2.5

kilometres long by 1.0 kilometre wide, open at both ends. The target areas are mostly defined by

induced polarization anomalies along several subparallel axes, for a cumulative length of at least

7 kilometres. As a first phase, the current program aims to assess the gold potential from surface to

a vertical depth of 200 metres. To date, drilling has concentrated on ELM-1.

This press release was prepared by Dr.

Jean-Marc Lulin

, P.Geo., acting as Azimut's qualified

person under National Instrument 43-101.

About Azimut Exploration

Azimut is a mineral exploration company whose core business is centred on target generation and

partnership development. The Company uses a pioneering approach to big data analytics (the

proprietary

AZtechMine

TM

expert system) enhanced by extensive exploration know-how. Azimut

maintains rigorous financial discipline and has 65.7 million shares outstanding. Azimut's competitive

edge against exploration risk is founded on systematic regional-scale data analysis and multiple

concurrently active projects.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SOURCE

Azimut Exploration Inc.

View original content:

http://www.newswire.ca/en/releases/archive/June2020/29/c8748.html

%SEDAR: 00003284E

For further information:

Jean-Marc Lulin, President and CEO, Tel.: (450) 646-3015 - Fax: (450)

646-3045, [email protected], www.azimut-exploration.com

CO: Azimut Exploration Inc.

CNW 07:00e 29-JUN-20