Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AZM.V ·

Azimut Confirms the Patwon Zone Extends to a Depth of at least 600 metres and Remains Completely Open 3.94 g/t Au over 12.4 m and 2.09 g/t Au over 20.6 m (Hole ELM21-129) 3.31 g/t Au over 21.0 m (Hole ELM21-128) 2.80 g/t Au over

Drill Results

Azimut Confirms the Patwon Zone Extends to

a Depth of at least 600 metres and Remains

Completely Open

3.94 g/t Au over

12.4 m

and 2.09 g/t Au over

20.6 m

(Hole ELM21-129)

3.31 g/t Au over

21.0 m

(Hole ELM21-128)

2.80 g/t Au over

35.05 m

(Hole ELM22-134)

1.74 g/t Au over

56.75 m

(Hole ELM21-127)

LONGUEUIL, QC

,

March 10, 2022

/CNW Telbec/ -

Azimut Exploration Inc.

("Azimut" or the

"Company") (TSXV: AZM) is pleased to report the results of six (6) more holes drilled on the Patwon

Gold Zone, part of the ongoing 20,000-metre program to expand Patwon and assess additional

targets on the Company's 100% owned Elmer Property (the "Property") in the

James Bay

region of

Quebec

.

The Company aims to define the Patwon Zone down to at least 800 metres. The results of the

current program will be incorporated into a

maiden mineral resource estimate

supported by a

technical report compliant with National Instrument 43-101 (

see press releases of

October 18

and

November 4, 2021

, and

January 27, 2022

). To date, the Company has drilled twenty-three (23)

holes for 9,516 metres during the program, including eighteen (18) on Patwon (

8,487 m

) and five (5)

on surrounding targets (

1,029 m

).

In addition, Azimut is concurrently defining highly prospective targets near Patwon with an extensive

reverse circulation drilling ("RC") program. To date, 214 RC holes have been drilled through the

glacial sediment cover to collect bedrock samples over a structural corridor containing strong gold

anomalies in till. A diamond drilling phase will follow up on these results.

HIGHLIGHTS

(

see Figures 1 to 7, Tables 1 to 4, Photo 1

)

Hole ELM21-129

3.94 g/t Au over

12.4 m

(from

263.05 m

to

275.45 m

), including

13.85 g/t Au over

2.5 m

2.09 g/t Au over

20.6 m

(from 300.7

m

to 321.3

m

), including

7.50 g/t Au over

4.0 m

Hole ELM21-128

3.31 g/t Au over

21.01 m

(from

211.82 m

to

232.84 m

), including

5.37 g/t Au over

5.83 m

6.63 g/t Au over

4.98 m

Hole ELM22-134

2.80 g/t Au over

35.05 m

(from

536.75 m

to

571.8 m

), including

16.71 g/t Au over

2.9 m

24.5 g/t Au over

0.9 m

Hole ELM21-127

1.74 g/t Au over

56.75 m

(from

189.25 m

to

246 m

), including

12.2 g/t Au over

1.2 m

7.25 g/t Au over

3.5 m

Hole ELM21-126A

0.91 g/t Au over

47.5 m

(from

576.0 m

to

622.5 m

)

1.07 g/t Au over

9.8 m

(from

655.9 m

to

665.7 m

)

One hole, ELM21-125, was drilled at a low angle through the mineralized envelope to provide

additional information about its geometry and continuity (see Figure 3). Core length intervals for

this hole, provided below, are reported as mineralized down-hole lengths; true widths have not

been estimated for this hole.

Hole ELM21-125

1.08 g/t Au over

286.9 m

(from

27.6 m

to

314.15 m

), including

4.43 g/t Au over

40.0 m

(from

274.5 m

to

314.5 m

), including

10.54 g/t Au over

5.9 m

and

8.14 g/t Au over

10.7 m

1.35 g/t Au over

75.0 m

(from

390.7 m

to

465.7 m

), including:

6.54 g/t Au over

7.7 m

The Patwon Zone has been outlined along a

580-metre strike length

and now extends from

450 metres

to 600 metres

, with an average

estimated true width of 35 metres

.

Patwon remains open at depth with a robust and consistent

core zone

with

grade x thickness

("GT") factors higher than 50

based on

true estimated widths

(see Figure 7). At Patwon,

visible gold generally appears to be a reliable predictor for GT factors close to or higher than

50.

For the 18 delineation holes drilled so far during this program, nine (9) display

visible gold

grains

(ELM21-125, -127, -128, -129 and ELM22-132, -134, -136, -142, -143).

The current delineation drilling program is structured on a systematic spacing of 50-metre

centres from the surface down to 500 metres and a systematic spacing of 50-metre by 75-

metre centres down to 800 metres. Patwon may likely be open along strike, and additional

holes will test this.

The Elmer Property comprises 515 claims covering 271.3 km

2

over a 35-kilometre strike length. The

Property is 285 kilometres north of the town of

Matagami

, 60 kilometres east of the village of

Eastmain

, and 5 kilometres west of the paved Billy-Diamond Highway, a major all-season highway.

The region benefits from excellent infrastructure, including significant road access, a hydroelectric

power grid and airports.

Drilling Contract and Analytical Protocols

The drilling contract was awarded to RJLL Drilling Inc. of

Rouyn-Noranda, Quebec

. The core

diameter is NQ. The core samples were sent to ALS Laboratories in

Val d'Or

, Québec, where gold

was analyzed by fire assay, with atomic absorption and gravimetric finish for grades above 3.0 g/t

Au. Samples were also analyzed for a 48-element suite using ICP. Azimut applies industry-standard

QA/QC procedures to its drilling programs. Certified reference materials, blanks and field duplicates

are included in all batches sent for analysis.

Dr.

Jean-Marc Lulin

, P.Geo., prepared this press release as Azimut's qualified person under

National Instrument 43-101.

About Azimut

Azimut is a leading mineral exploration company with a solid reputation for target generation and

partnership development. The Company is actively advancing its wholly-owned flagship Elmer Gold

Project in the

James Bay

region to the initial resource stage.

The Company uses a pioneering approach to big data analytics (the proprietary

AZtechMine

TM

expert system), enhanced by extensive exploration know-how. Azimut's competitive

edge is based on systematic regional-scale data analysis and concurrently active projects. Azimut

maintains rigorous financial discipline and a strong balance sheet, with 81.8 million shares issued and

outstanding.

Cautionary note regarding forward-looking statements

This press release contains forward-looking statements, which reflect the Company's current

expectations regarding future events related to the drilling results at the Elmer Property. To the

extent that any statements in this press release contain information that is not historical, the

statements are essentially forward-looking and are often identified by words such as "consider",

"anticipate", "expect", "estimate", "intend", "project", "plan", "potential", "suggest" and "believe". The

forward-looking statements involve risks, uncertainties, and other factors that could cause actual

results to differ materially from those expressed or implied by such forward-looking statements.

There are many factors that could cause such differences, particularly volatility and sensitivity to

market metal prices, impact of change in foreign currency exchange rates and interest rates,

imprecision in reserve estimates, recoveries of gold and other metals, environmental risks

including increased regulatory burdens, unexpected geological conditions, adverse mining

conditions, community and non-governmental organization actions, changes in government

regulations and policies, including laws and policies, global outbreaks of infectious diseases,

including COVID-19, and failure to obtain necessary permits and approvals from government

authorities, as well as other development and operating risks. Although the Company believes that

the assumptions inherent in the forward-looking statements are reasonable, undue reliance should

not be placed on these statements, which only apply as of the date of this document. The

Company disclaims any intention or obligation to update or revise any forward-looking statement,

whether as a result of new information, future events or otherwise, other than as required to do so

by applicable securities laws. The reader is directed to carefully review the detailed risk discussion

in our most recent Annual Report filed on SEDAR for a fuller understanding of the risks and

uncertainties that affect the Company's business.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release

.

SOURCE

Azimut Exploration Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2022/10/c2778.html

%SEDAR: 00003284E

For further information:

Jean-Marc Lulin, President and CEO, Tel.: (450) 646-3015, Fax: (450)

646-3045, [email protected], www.azimut-exploration.com

CO: Azimut Exploration Inc.

CNW 06:30e 10-MAR-22