Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AZM.V ·

Azimut and SOQUEM Uncover a Spodumene-Bearing Pegmatite Boulder Field at Galinée, James Bay Region, Quebec

Corporate Updates

For immediate release

September 06, 2023

TSXV: AZM

OTCQX: AZMTF

Press Release

Azimut and SOQUEM Uncover a Spodumene-Bearing Pegmatite

Boulder Field at Galinée, James Bay Region, Quebec

Longueuil, Quebec – Azimut Exploration Inc. (“Azimut” or the “Company”) ( TSXV: AZM) (OTCQX: AZMTF) is

pleased to report that a spodumene-bearing pegmatite boulder field containing at least 12 mineralized boulders

has been identified on the Galinée Property (the “Property”) in the Eeyou Istchee James Bay region of Quebec.

These encouraging preliminary field results obtained by Azimut and its partner SOQUEM Inc. (“SOQUEM”)

confirm the strong prospectivity of the Property and support the upcoming maiden drilling program targeting the

area immediately south of t he Adina lithium discovery (Winsome Resources). The minimum 1,600-metre core

drilling program will be initiated shortly.

In addition to Galinée, substantial concurrent exploration programs are already underway or will soon commence

following a lengthy period of access restrictions related to widespread forest fires. This includes work on projects

for gold and copper-gold (Elmer and Kukamas) and lithium (Pikwa, Pontois, Dalmas, Corvet, Kaanaayaa, Wapatik

and JBL) (see press releases of August 21 and August 28, 2023).

HIGHLIGHTS (see Figures 1 to 6 and Photos 1 to 4)

• The boulder field in the northern part of the Property is characterized by the following features:

o At least 12 spodumene- bearing pegmatite boulders in a 650- by 350-metre area, not fully delineated at

this stage . The area has extensive glacial sediment cover and only one outcrop ( amphibolite). The

dominant glacial direction is NE to SW.

o Most boulders are angular to sub- angular, generally indicative of short transport distances from the

bedrock source ( a few metres to several hundred met res). It is possible that some of the spodumene-

bearing boulders originated from the non-outcropping target area where the bedrock will be drill-tested by

the upcoming drilling program.

o Boulder sizes range from 0.5 x 0.5 metre to 1.5 x 1.5 m etre, with spodumene constituting 5% to 20% of

the pegmatite.

o Spodumene crystals range from a few centimetres to 20-25 centimetres long, with whitish and grey to pink

colours. A portable LIBS analyzer (Laser Induced Breakdown Spectroscopy) was used to confirm the

presence of lithium.

o Other associated minerals are quartz, potassium feldspar, white mica, apatite and tourmaline.

• These preliminary findings underscore the strong discovery potential for spodumene-bearing pegmatites on

Galinée in the immediate vicinity of mineralized bodies on the adjacent Adina project belonging to Winsome

Resources. Drilling on Adina has traced two east-west subparallel spodumene- bearing pegmatite zones ,

including the Main Zone over a strike length of 1,000 metres . Public data suggests both zones have shallow

dips toward Galinée.

• At Galinée, the aim of the drilling program is two-fold: 1) intersect the down-dip extensions of Winsome’s zones,

and 2) investigate the strong potential for additional subparallel spodumene -bearing pegmatites starting at

shallow depth on Galinée, immediately south of but geometrically above Adina’s Main Zone (see press release

of June 13, 2023).

• On a larger scale, the Galinée Property displays well -defined targets, including a 20-kilometre-long lithium-

cesium-gallium-tin anomaly in lake sediment s in the northwestern part of the Property. Outcrops in this area

are rare, but its strong geochemical footprint underscores significant exploration potential roughly coincident

with a NE-SW-trending sheared greenstone belt (see Figures 2 to 4).

• To date, 107 grab rock samples have been collected from target areas on the Property and assay results are

pending.

The Galinée Property

The Galinée Property (649 claims, 335 km2) is a 50/50 joint venture between Azimut and SOQUEM, operated

by Azimut. The 36-kilometre-long project is located about 50 kilometres north-northwest of the Renard diamond

mine (Stornoway) and 60 kilometres south of the Trans-Taiga Road, a regional highway.

Qualified Person

Dr. Jean-Marc Lulin (P.Geo.) prepared this press release as Azimut’s qualified person within the meaning of

National Instrument 43-101. Rock Lefrançois (P.Geo.), Vice President of Exploration, and François Bissonnette

(P.Geo.), Operations Manager, also reviewed the contents of this press release.

About SOQUEM

SOQUEM, a subsidiary of Investissement Québec, is dedicated to promoting the exploration, discovery and

development of mining properties in Quebec. SOQUEM also contributes to maintaining strong local economies. A

proud partner and ambassador for the development of Quebec’s mineral wealth, SOQUEM relies on innovation,

research, and strategic minerals to be well-positioned for the future.

About Azimut

Azimut is a leading mineral exploration company with a solid reputation for target generation and partnersh ip

development. The Company holds the largest mineral exploration portfolio in Quebec. Its wholly owned flagship,

the Elmer Gold Project, is advancing to the initial resource stage in the James Bay region. Azimut also controls

a strategic land position for copper-gold, nickel and lithium.

Azimut uses a pioneering approach to big data analytics (the proprietary AZtechMine™ expert system) enhanced

by extensive exploration know-how. The Company’s competitive edge is based on systematic regional-scale data

analysis and concurrently active projects. The Company maintains rigorous financial discipline and a strong

balance sheet, with 79.9 million shares issued and outstanding.

Contact and Information

Jean-Marc Lulin, President and CEO

Tel.: (450) 646-3015

Jonathan Rosset, Vice President Corporate Development

Tel: (604) 202-7531

[email protected] www.azimut-exploration.com

Cautionary note regarding forward-looking statements

This press release contains forward-looking statements, which reflect the Company’s current expectations regarding future events related to the drilling results

from the Galinée Property. To the extent that any statements in this press release contain information that is not historical, the statements are essentially

forward-looking and are often identified by words such as “consider”, “anticipate”, “expect”, “estimate”, “intend”, “project”, “plan” , “potential”, “suggest” and

“believe”. The forward-looking statements involve risks, uncertainties, and other factors that could cause actual results to differ materially from those expressed

or implied by such forward-looking statements. Many factors could cause such differences, particularly volatility and sensitivity to market metal prices, the impact

of changes in foreign currency exchange rates and interest rates, imprecision in reserve estimates, recoveries of gold and other metals, environmental risks

including increased regulatory burdens, unexpected geological conditions, adverse mining conditions, community and non-governmental organization actions,

changes in government regulations and policies, including laws and policies, global outbreaks of infectious diseases, including COVID-19, and failure to obtain

necessary permits and approvals from government authorities, as well as other development and operating risks. Although the Company believes that the

assumptions inherent in the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the

date of this document. The Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new

information, future events or otherwise, other than as required to do so by applicable securities laws. The reader is directed to carefully review the detailed risk

discussion in our most recent Annual Report filed on SEDAR for a fuller understanding of the risks and uncertainties that affect the Company’s business.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.