Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

MAYA VALIDATES THAT HISTORICAL MINERALIZED PANELS ARE STILL IN PLACE AND EXTENDS MINERALIZATION AT DEPT H -­‐Discovers Germanium 497 g/t over 1.5m in core samples -­‐Finds Gold at surface 48g/t over 2m at Boumadine

Drill Results

PRESS  RELEASE    

MAYA  VALIDATES   THAT  HISTORICAL  MINERALIZED  PANELS  ARE  

STILL  IN  PLACE  AND   EXTENDS  MINERALIZATION  AT  DEPT H  

-­‐Discovers  Germanium   497  g/t  over  1.5m   in  core  samples    

-­‐Finds  Gold  at  surface   48g/t  over  2m   at  Boumadine  

_________________________ _____________________________________________  

Montreal,  Québec-­‐  February  25,  2019  –  Maya  Gold  &  Silver  Inc.  (“Maya”  or  the  “Corporation”)  

(TSX:  MYA)  is  pleased  to  announce  the  compilation  of  results  from  its  diamond  drilling  program,  

drilling  on  the  tailings  and  surface  sampling  at  Boumadine  property.  

Highlights:  

2017  successful  validation  of  mineralization  panels  are  still  in  place  

-­‐ 28  m  at  10.79  g/t  Gold  Equivalent  and  8.35  g/t  Gold  in  Hole  B_17-­‐04  from  153m  to  181m;  

-­‐ 11  m  at  8.77  g/t  Gold  Equivalent  and  3.83  g/t  Gold  in  Hole  B_17-­‐02  from  170.1m  to  181.1m;  

-­‐ 5  m  at  12.58  g/t  Gold  Equivalent  and  3.87  g/t  Gold  in  Hole  B_17-­‐05  from  94m  to  99m;  

-­‐ 5.5   m   at  8.33  g/t  Gold   Equivalent  and  1.93  g/t   Gold  in   Hole   B_17-­‐05bis   from   185m   to  

190.5m;  

-­‐ 5   m   at  7.08  g/t  Gold   Equivalent  and  2.77  g/t   Gold  in   Hole   B_17-­‐05bis   from   191.5m   to  

196.5m;  

-­‐ 6  m  at  14.88  g/t  Gold  Equivalent  and  1.8  g/t  Gold  in  Hole  B_17-­‐06bis  from  177m  to  183m;  

-­‐ 4.5  m  at  9.18  g/t  Gold  Equivalent  and  1.36  g/t  Gold  in  Hole  B_17-­‐06bis  from  211.5m  to  

216m;  

2018  successful  extension  at  depth  of  the  mineralized  zones  

-­‐ 2  m  at  5.14  g/t  Gold  Equivalent  and  3.1  g/t  Gold  in  Hole  B_18-­‐03  from  502m  to  504.8m;  

-­‐ 4.5   m   at  2.22  g/t  Gold   Equivalent  and  1.78  g/t   Gold  in   Hole   B_18-­‐03   from   558.2m   to  

562.7m;  

-­‐ 2.5  m  at  3.57  g/t  Gold  Equivalent  and  1.8  g/t  Gold  in  Hole  B_18-­‐01  from  359m  to  361.5m;  

-­‐ 1  m  at  6.05  g/t  Gold  Equivalent  and  1.7  g/t  Gold  in  Hole  B_18-­‐01  from  224.2m  to  225.2m;  

Germanium  discovery  

The   core   samples   were   assayed  for   multi-­‐element   and   important   grades   of   Germanium   were  

discovered  during  the  analysis.  It  appears  Germanium  is  not  evenly  distributed  in  all  sectors  and  it  

may  be  related  to  zoning  within  mineralized  zones  associated  to  sphalerite  (Zn)  and  other  sulfides.  

Additional   work  is   being   done  in   order  take   the   Germanium  values   into   account   in  the   mineral  

resources.  Assays  range  from  below  detection  limit  20  ppm  with  a  maximum  of  497ppm  Ge  in  1.5m  

sample.  

Surface  samples  gold  findings  

-­‐ 2  m  at  48  g/t  Gold  in  sample  number  TN19,  Structure  oriented  NNE;  

-­‐ 2.5m  at  9  g/t  Gold  in  sample  number  CS16,  shear  zone  oriented  NNE;  

-­‐ 1.5m   at   6.82   g/t  Gold  in   sample   number   IM39,   structure   filled   by   oxidized   sulfides  and  

quartz  cement,  oriented  N-­‐S;  

-­‐ 1.15m  at  6.76  g/t  Gold  in  sample  number  IM26,  breccia  oriented  NW-­‐SE;  

With   these   positive   results,   Maya  took   the   decision   to  postpone  the  publication  of   the   PEA   on  

Boumadine.   The  Corporation  started   an   additional   diamond   drilling   program   at   the   North   and  

Imariren  Zones.  An  additional  37  holes  were  drilled  totalling  1840  meters.  This  additional  drilling  

program  aims  to  better  understand  the  distribution  of  precious  metals  and  to  explore  the  vertical  

extensions   of   these   exposed   mineralized   structures.   Complete   drill   results   of   this   campaign   are  

pending  and  will   be   disclosed   once   received,   compiled   and  verified.  This   will   allow  Maya  to  

integrate  all  data  collected  and   produce   the   first   NI   43-­‐101  mineral  resources   estimate   on  

Boumadine  including  the  Imariren  and  North  zones.  

The  2017-­‐2018  First  Phase  Diamond  Drilling  Program  

The  2017/2018  first  phase  drilling  program  consisted  of  14  diamond  drill  holes  totaling  3,158.2m.  

Five  holes  were  drilled  at  the  zone  Centre  totaling  1,490.4m.  Four  holes  were  drilled  at  Zone  Tizi,  

totaling  530.2m.  Five  holes  were  drilled  at  zone  South  totaling  1,137.6m.  

This  drilling  program  ended  in  April  2018  and  the  main  objectives  were:  

- Validation  of  the  historical  panels  at  zone  Centre  and  zone  South;  

- Explore  the  vertical  extensions  of  the  mineralization  at  zone  Tizi,  Centre  and  South;  

The   holes  were  mainly   drilled   in   Ignimbrite,  Rhyodacite   and   Andesitic   rocks   with   many   massive  

pyrite   zones.   These   rocks   are   affected   by   shear   zones,   veins   and   veinlets   and   intruded   by  

hydrothermal  breccia.  Most  holes  intersected  the  mineralized  zones  with  massive  sulfides,  mainly  

pyrite,  sphalerite,  galena  and  more  or  less  chalcopyrite.  

Sulphide  mineralization  consisting  in  massive  pyrite  accompanied  by  pyrrhotite  and  more  or  less  

arsenopyrite.   The   mineralization  was  massive   and   reached  28  meters   of   drill   core.   Some   holes  

showed  principal   vein-­‐type   mineralization   with   sharp   layering   cross-­‐cut   by   several   networks   and  

stockworks  of  secondary  sulfide  mineralization.  Quartz  veins/veinlets  were  observed  in  many  drill  

holes   surrounding   the   principal   zones   with   massive   sulfides.   We   also   observed  the   presence  of  

voids  within  the  Ingnimbrite  filled  by  sulphides  cements  preferentially  at  the  upper  limit  with  the  

porphyry   contact.  In   addition,   the   results   from   the   diamond   drilling   program   showed  a   spatial  

relationship  between  the  mineralization  and  structural  interpretation  of  the  high  grade  intercepts  

from  all  the  historical  database  dipping  a  roughly  subvertical  and  NNW  trending.  

The  most  important  intervals  of  the  2017/2018  drilling  program  are  listed  below  in  Table  1.  

Table 1: The important intervals from the 2017/2018 drilling program.

Hole  Name  From   To   Length   Au  g/t   Ag  g/t   Zn  %   Pb  %   Au  Eq  g/t  Zone  

B-­‐17-­‐04   153,0   181,0   28,00   8,35   112,79   1,48   0,36   10,79   Central  

Including   156,0   160,0   4,00   5,75   207,00   3,53   1,06   10,94   Central  

Including   163,0   173,0   10,00   3,02   77,70   1,70   0,27   5,14   Central  

Including   175,0   181,0   6,00   29,53   226,83   0,46   0,15   32,60   Central  

and   177,0   179,0   2,00   77,50   314,00   0,30   0,17   81,52   Central  

B-­‐17-­‐02   170,1   181,1   11,00   3,83   93,73   5,75   0,58   8,77   Central  

Including   175,1   178,1   3,00   7,85   170,67   9,87   1,06   16,48   Central  

B-­‐17-­‐05   94,0   99,0   5,00   3,87   310,10   7,23   1,11   12,58   South  

Including   94,5   98,0   3,50   5,03   373,71   7,41   0,19   14,12   South  

B-­‐17-­‐05bis   185,0   190,5   5,50   1,93   166,09   6,72   0,61   8,33   South  

Including   187,5   190,0   2,50   3,36   338,40   12,92   0,88   15,75   South  

B-­‐17-­‐05bis   191,5   196,5   5,00   2,77   73,40   4,89   0,83   7,08   South  

Including   192,5   195,5   3,00   3,36   47,33   4,18   0,11   6,54   South  

B-­‐17-­‐06C   108,5   111,0   2,50   1,95   76,40   6,24   1,69   7,58    South  

B-­‐17-­‐06bis   177,0   183,0   6,00   1,80   598,33   6,94   3,16   14,88   South  

Including   177,0   178,5   1,50   1,73   162,00   3,64   1,03   6,44   South  

including   181,0   182,5   1,50   4,07  1904,67   20,89   6,74   43,19   South  

B-­‐17-­‐06bis   211,5   216,0   4,50   1,36   202,22   5,68   3,60   9,18   South  

including   213,0   214,5   1,50   2,62   317,00   9,59   4,80   14,83   South  

B-­‐17-­‐10   90,0   92,5   2,50   6,27   51,40   0,63   0,60   7,59   Tizi  

B-­‐17-­‐07   58,0   63,0   5,00   2,72   303,80   5,54   4,26   12,02   Tizi  

including   58,5   59,0   0,50   14,32   834,00   6,62   4,15   30,55   Tizi  

B-­‐17-­‐06   91,0   95,0   4,00   1,07   80,50   2,95   0,66   4,18   South  

including   93,0   94,5   1,50   1,90   48,00   1,80   0,65   3,92   South  

B-­‐17-­‐01bis   156,5   159,0   2,50   2,41   43,20   2,13   0,69   4,59   Central  

including   157,0   158,0   1,00   5,33   45,00   2,39   0,89   7,80   Central  

B-­‐17-­‐01bis   228,5   230,5   2,00   1,41   4,25   0,03   0,04   1,49   Central  

B-­‐17-­‐01bis   234,5   236,5   2,00   1,84   16,25   0,05   0,12   2,13   Central  

B-­‐17-­‐01bis   254,0   255,0   1,00   2,87   52,50   0,11   0,68   3,93   Central  

B-­‐17-­‐01bis   255,5   257,5   2,00   4,02   270,75   1,27   0,32   8,20   Central  

B-­‐17-­‐01bis   264,0   265,5   1,50   0,94   24,00   1,46   0,57   2,43   Central  

B-­‐17-­‐01   53,0   60,0   7,00   0,76   22,29   2,62   1,01   3,17   Central  

B-­‐17-­‐01   224,0   227,0   3,00   2,30   81,67   1,10   0,19   4,05   Central  

B-­‐17-­‐03   193,5   195,5   2,00   0,60   26,25   2,06   0,42   2,39   Central  

B-­‐17-­‐03   235,0   236,0   1,00   1,73   55,50   1,34   0,71   3,59   Central  

B-­‐17-­‐05bis   175,6   180,0   4,40   0,27   23,52   1,71   1,17   2,22   South  

B-­‐17-­‐06bis   221,5   229,5   8,00   0,99   172,00   5,46   2,16   7,54   South  

B-­‐17-­‐06bis   235,5   236,5   1,00   0,48   21,00   2,86   0,75   2,87   South  

B-­‐17-­‐06C   122,5   125,0   2,50   0,15   71,20   2,20   1,64   3,23   South  

B-­‐17-­‐06C   155,0   159,0   4,00   0,88   196,50   8,18   1,84   9,21   South  

B-­‐17-­‐08   15,7   17,4   1,70   1,05   41,06   0,76   0,27   2,15   Tizi  

B-­‐17-­‐08   131,6   135,1   3,50   0,86   85,29   1,42   0,90   3,23   Tizi  

The  assay  results  for  a  minimum  interval  of  1  meter.  The  core  lengths  reported  are  between  60%  and  75%  of  

true   widths.  The   grades   herein   are   reported   as   uncapped   values.   Gold   equivalent   in   this   release   are  

calculated  using  Au  Oz  1250  USD,  Ag  Oz  at  15  USD,  Zn  2450  USD  per  tonne  and  Pb  2168  USD  per  tonne.  

A  total  of  482.2m  core  samples  (totaling  617  core  samples)  were  submitted  to  the  independent  

laboratory  ‘Analyse  Development  Minier  S.A.R.L.’  (ADM)  based  in  Marrakech  (Morocco)  for  

preparation  and  assaying.  

Based  on  the  positive  results  cited  above  Maya  Gold  and  Silver  decided  to  add  four  diamond  drill  

holes  (totaling  2671.1m;  251  core  samples)  to  intersect  the  extension  at  depth  of  the  mineralized  

sections  in  the  three  zones  (Center,  South  and  Tizi).  The  table  below  (Table  2)  show  the  highlights.  

Table 2: The important intervals from 2018 drilling program.

Hole  Name  From   To   Length   Au  g/t   Ag  g/t   Zn  %   Pb  %   Au  Eq   Zone  

B-­‐18-­‐03   502,80   504,80   2,00   3,10   76,67   1,72   1,40   5,14  South  

Including   502,80   503,80   1,00   4,57   85,00   0,12   0,15   5,15  South  

B-­‐18-­‐03   558,20   562,70   4,50   1,78   23,33   0,04   0,24   2,22  South  

B-­‐18-­‐01   224,20   225,20   1,00   1,70   42,00   4,52   2,04   6,05  Central  

B-­‐18-­‐01   335,00   338,00   3,00   0,83   49,33   0,27   0,42   1,81  Central  

B-­‐18-­‐01   359,00   361,50   2,50   1,80   38,20   1,83   0,37   3,57  Central  

Including   360,00   361,00   1,00   3,01   54,00   2,46   0,53   5,44  Central  

The  assay  results  for  a  minimum  interval  of  1  meter.  The  core  lengths  reported  are  between  60%  and  75%  of  

true   widths.   The   grades   herein   are   reported   as   uncapped   values.   Gold   equivalent   in   this   release   was  

calculated  using  Au  Oz  1250  USD,  Ag  Oz  at  15  USD,  Zn  2450  USD  per  tonne  and  Pb  2168  USD  per  tonne.  

Table 3: Drill hole information

Hole  Name   Easting   Northing   Elevation  (m)  Azimuth  (°)  Dip  (°)  Length  

(m)  

B-­‐17-­‐01   317226.80  3476877.30   1152.15   245   -­‐45   315.2  

B-­‐17-­‐01bis   317249.11  3476888.11   1148.20   245   -­‐55   323.8  

B-­‐17-­‐02   317283.00  3476655.09   1140.30   234   -­‐45   236  

B-­‐17-­‐03   317344.28  3476673.52   1140.14   234   -­‐47   415.4  

B-­‐17-­‐04   317119.46  3476965.56   1158.07   224   -­‐47   200  

B-­‐17-­‐05   317093.38  3474794.12   1215.36   91   -­‐50   175.2  

B-­‐17-­‐05bis   317025.99  3474794.60   1204.12   85   -­‐46   268  

B-­‐17-­‐06   317106.98  3474744.00   1220.62   83   -­‐47   215  

B-­‐17-­‐06bis   317055.09  3474737.44   1211.58   94   -­‐45   278  

B-­‐17-­‐06C   317100.65  3474696.84   1219.85   84   -­‐46   201.4  

B-­‐17-­‐07   315413.68  3476958.11   1205.49   286   -­‐46   100  

B-­‐17-­‐08   315461.95  3476944.67   1202.34   286   -­‐55   180.2  

B-­‐17-­‐09   315425.67  3476899.31   1200.36   225   -­‐45   110  

B-­‐17-­‐10   315450.79  3476924.10   1196.60   225   -­‐54   140  

B-­‐18-­‐04   315648.00  3476987.00   1207.93   264   -­‐55   466.1  

B-­‐18-­‐01   317413.83  3476954.62   1141.03   235   -­‐55   686.0  

B-­‐18-­‐02   317582.41  3476787.34   1140.11   241   -­‐49   911  

B-­‐18-­‐03   316889.00  3474515.00   1209.34   49   -­‐45   608  

B-­‐18-­‐11   315756.00  3477776.00   1142.34   128   -­‐45   45.3  

B-­‐18-­‐11bis   315756.22  3477776.07   1142.00*   128   -­‐65   86  

B-­‐18-­‐10bis   315756.22  3477776.07   1142.00   90   -­‐75   62  

B-­‐18-­‐10   315756.22  3477776.07   1142.00   90   -­‐45   32  

B-­‐18-­‐09   315756.22  3477776.07   1142.00   60   -­‐45   35  

B-­‐18-­‐09bis   315756.22  3477776.07   1142.00   60   -­‐65   56  

B-­‐18-­‐08   315776.70  3477825.09   1142.00   135   -­‐45   30.4  

B-­‐18-­‐08bis   315776.70  3477825.09   1142.00   135   -­‐65   56  

B-­‐18-­‐07   315776.70  3477825.09   1142.00   90   -­‐45   30  

B-­‐18-­‐07bis   315776.70  3477825.09   1142.00   90   -­‐70   64.4  

B-­‐18-­‐06   315776.70  3477825.09   1142.00   45   -­‐45   35  

B-­‐18-­‐06bis   315776.70  3477825.09   1142.00   45   -­‐65   56  

B-­‐18-­‐05bis   315782.65  3477862.46   1142.00   140   -­‐70   56  

B-­‐18-­‐05   315782.65  3477862.46   1142.00   140   -­‐45   30.1  

B-­‐18-­‐04bis   315782.65  3477862.46   1142.00   90   -­‐75   56.3  

B-­‐18-­‐44   315782.65  3477862.46   1200.00   90   -­‐45   30.7  

B-­‐18-­‐03bis   315782.65  3477862.46   1142.00   60   -­‐70   56.5  

B-­‐18-­‐33   315782.65  3477862.46   1200.00   60   -­‐45   32  

B-­‐18-­‐14bis   315951.38  3477862.50   1142.00   90   -­‐65   80  

B-­‐18-­‐13bis   315951.38  3477862.50   1142.00   50   -­‐70   56.4  

B-­‐18-­‐12bis   315951.38  3477862.50   1142.00   5   -­‐70   65.5  

B-­‐18-­‐17bis   315774.00  3477936.00   1142.00   145   -­‐70   71  

B-­‐18-­‐17   315774.00  3477936.00   1142.00   145   -­‐45   46.7  

B-­‐18-­‐16   315774.00  3477936.00   1142.00   90   -­‐45   38  

B-­‐18-­‐16bis   315774.00  3477936.00   1142.00   90   -­‐75   56.5  

B-­‐18-­‐15   315774.00  3477936.00   1142.00   48   -­‐45   35  

B-­‐18-­‐15bis   315774.00  3477936.00   1142.00   48   -­‐75   56.5  

B-­‐18-­‐20   316098.42  3477790.39   1142.00   45   -­‐45   47  

B-­‐18-­‐20bis   316098.42  3477790.39   1142.00   90   -­‐65   65.5  

B-­‐18-­‐19   316098.42  3477790.39   1142.00   45   -­‐45   35  

B-­‐18-­‐18   316098.42  3477790.39   1142.00   0   -­‐45   35  

B-­‐18-­‐18bis   316098.42  3477790.39   1142.00   0   -­‐70   65.5  

B-­‐18-­‐19bis   316098.42  3477790.39   1142.00   45   -­‐70   56.5  

B-­‐18-­‐21   316231.09  3477696.81   1142.00   5   -­‐45   35  

B-­‐18-­‐21bis   316231.09  3477696.81   1142.00   5   -­‐70   56.5  

B-­‐18-­‐22   316231.09  3477696.81   1142.00   65   -­‐45   35  

B-­‐18-­‐22bis   316231.09  3477696.81   1142.00   65   -­‐70   56.5  

*Note:  The  latest  holes  of  the  2018  program  are  not  surveyed  with  a  DGPS  yet,  it  is  why  they  have  the  fixed  

1142mZ  elevation  in  the  table,  also  note  that  several  were  drilled  from  the  same  set-­‐up,  the  precise  location  

will  be  disclosed  once  received  and  validated.  

Drilling  on  the  tailings  

A  total  of  49  holes  were  drilled  on  the  Boumâadine  tailings  using  the  AMS  soil  core  sampler.  A  

total  of  34  holes  were  drilled  on  tailing  TG1  totaling  70.53m  and  15  holes  were  drilled  on  tailing  

TG2  totaling  116.10m.  The  main  objective  of  the  drilling  program  was  the  mineral  resource  

estimation  of  the  tailings.  The  table  below  shows  the  highlights.  

Hole  

Name   From  To   Length  Au  ppm  

Hole  

Name   From   To   Length   Au  

TG1-­‐18-­‐03   1  1,34   0,34   4,03  TG2-­‐18-­‐03   6   7   1   2,67  

TG1-­‐18-­‐06   0   1   1   4,6  TG2-­‐18-­‐04   6   7   1   2,54  

TG1-­‐18-­‐12   0   1,1   1,1   3,02  TG2-­‐18-­‐04   7   7,4   0,4   3,04  

TG1-­‐18-­‐13   2   3   1   3,32  TG2-­‐18-­‐05   5   6   1   2,63  

TG1-­‐18-­‐13   3   3,6   0,6   3,12  TG2-­‐18-­‐05   6   7   1   2,87  

TG1-­‐18-­‐14   1   2   1   3,24  TG2-­‐18-­‐05   7   8   1   2,72  

TG1-­‐18-­‐14   2   2,7   0,7   3,18  TG2-­‐18-­‐06   6   7   1   2,46  

TG1-­‐18-­‐15   0   1   1   3,26  TG2-­‐18-­‐12   4   5   1   2,51  

TG1-­‐18-­‐15   1   1,7   0,7   3,54  TG2-­‐18-­‐12   5   6   1   2,44  

TG1-­‐18-­‐16   0   1   1   3,26  TG2-­‐18-­‐12   6   7   1   2,68  

TG1-­‐18-­‐16   1   1,7   0,7   3,7  TG2-­‐18-­‐12   7   7,56   0,56   2,62  

TG1-­‐18-­‐17   1   2   1   4,04  TG2-­‐18-­‐15   2   3   1   2,82  

TG1-­‐18-­‐17   2  2,27   0,27   3,6  TG2-­‐18-­‐15   3   4   1   2,94  

TG1-­‐18-­‐18   0   1   1   3,4  TG2-­‐18-­‐15   4   5   1   2,72  

TG1-­‐18-­‐19   1   1,6   0,6   3,08  TG2-­‐18-­‐15   5   6   1   3,54  

TG2-­‐18-­‐01   4   5   1   2,45  TG2-­‐18-­‐15   6   6,76   0,76   2,92  

TG2-­‐18-­‐01   5   6   1   2,35  TG2-­‐18-­‐15   6,76   7,19   0,43   2,64  

Surface  sampling  

Maya’s  geologists   started   the   first   surface   sampling   program   at  Boumadine  in   April   2018.   The  

sampling  program  was  discussed  during  the  site  visit  from  GoldMinds  Geoservices  and  covered  a  

portion  of  Imariren  and  zone  Nord.  

The   sampling   program   consisted  of  channel   sampling  (with   saw)   cross-­‐cutting   the   exposed  

mineralized   structures   oriented   E-­‐W,   NNE-­‐SSW  and   NE-­‐SW   filled   by   quartz   cements,  barite   and  

traces  of  lead  and  copper.  Sample  length  represented  the  thickness  of  the  mineralized  veins  and  

their  location  was  determined  using  a  hand  held  GPS.  

The  main  objectives  of  this  sampling  program  were:  

-­‐ Complete  historical  works  to  cover  areas  with  less  geochemical  information;  

-­‐ Prospecting  new  areas  following  the  mineralized  structures  trend;  

-­‐ Identified  new  target  with  high-­‐grade  potential  for  the  diamond  drill  program  in  progress  

at  Boumâadine.  

The   table   below  (Table  4)  shows  the   surface  grab  &   Channel  samples  highlights  and   their  

localisation  are  shown  in  Figure  1.  

Table 4: The highlights from the surface sampling results.

Hole  Name   Au  ppm   Ag  ppm  Zn  ppm   Pb  ppm   Cu  ppm  

TN19   48   216   200   0,574   160  

CS16   9   162   652   1,16   160  

IM39   6,82   124   44   0,83   28  

IM26   6,76   34   3264   0,37   109  

ZS19   6,6   234   242   1,04   181  

IM17   5,82   14   1063   0,14   213  

IM18   5,8   80   3236   0,37   283  

ZS18   5,72   144   749   0,2   314  

ZC3   5,54   177   1700   2,47   40  

TN14   5,02   66   100   1,31   40  

IM23   4,64   80   3280   1,19   309  

IM34   4,24   52   1087   5,29   1431  

IM07   4,02   12   153   0,45   15  

CS12   4,02   18   1174   1,23   178  

IM38   2,98   136   200   1,63   115  

IM27   2,8   64   3665   0,61   67  

CS11   2,7   16   650   1,13   126  

ZS12   2,6   90   155   2,57   46  

ZC5   2,46   70   900   2,85   46  

IM24   2,4   56   1196   1,49   489  

ZS17   2,4   66   1669   2,5   410  

ZS20   2,34   80   264   1,76   138  

CS13   2,08   255   480   1,46   91  

ZC6   1,82   145   1200   5,24   259  

TN5   1,8   86   12000   1,92   37700  

CS15   1,7   147   119   3,69   81  

ZS6   1,58   148   565   3,09   83  

TN26   1,54   69   600   2,21   50  

The  geochemical  survey  covered  the  main  mineralized  zone  at  the  Northern  part  of  the  property.  

The   geochemical   survey   appears   to   be   a   very   effective   method   and   give s  us   a   better  

understanding   of   the   polymetallic   deposit   (related   structures,  the   geological   control  and   target  

identification  for  drilling  to  explore  vertical  extension).  

The  figure  below  shows  the  surface  sample  locations  with  Au  value  in  g/t  taken  from  the  exposed  

structures.