Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Reports Zgounder At-Depth High-Grade Drill Results

Drill Results

PRESS RELEASE

Aya Gold & Silver Reports Zgounder At-Depth High-Grade

Drill Results

Montreal, Quebec, September 4, 2024 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or

the “Corporation”) is pleased to report additional high-grade silver drill results from its at-depth drill

exploration program at the Zgounder Silver Mine in the Kingdom of Morocco.

Highlights (all intersections are in core lengths)

• In the Central Zone from the 1,950m level:

• hole DZG-SF-24-081 intercepted 1,339 grams per tonne (“g/t”) silver (“Ag”) over

9.5 meters (“m”), including 2,984 g/t Ag over 4.0m

• hole DZG-SF-24-089 intercepted 2,522 g/t Ag over 3.0m, including 7,052 g/t

Ag over 1.0m

• hole DZG-SF-24-134 intercepted 448 g/t Ag over 10.5m

• In the Western Zone from the 2,000m level:

• hole ZG-SF-24-141 intercepted 626 g/t Ag over 6.0m

• hole ZG-SF-24-163 intercepted 536 g/t Ag over 7.0m

• In the Eastern Zone from the 2,000m level:

• hole DZG-SF-24-111 intercepted 2,372 g/t Ag over 6.5m; and 1,042 g/t Ag over

4.5m

• hole DZG-SF-24-098 intercepted 1,244 g/t Ag over 4.0m, including 2,242 g/t

Ag over 2.0m

• hole DZG-SF-24-108 intercepted 747 g/t Ag over 6.0m

• Exploration holes near the granite contact:

• Hole ZG-SF-24-183 intercepted 376 g/t Ag over 9.3m

• hole DZG-SF-24-164 intercepted 657 g/t Ag over 10.5m, including 1,037 g/t Ag

over 4.5m

• 21,190m of the 2024 exploration program drilled year to date

“Today’s high-grade drill results including hole DZG-SF-24-111continue to confirm high-grade

continuity of silver mineralization at Zgounder,” said Benoit La Salle, President & CEO. “In addition, the

silver-rich intercepts in the western and eastern extremities continue to increase the resource

expansion potential. We currently have four underground rigs turning that will deliver additional results

in the coming months.”

Included in this release are results for 217 holes, which include 80 underground DDH, 104 T28 and 33

YAK holes (T28 and YAK: percussion drilling using an air-compressed hammer). For a full summary

of today’s results, refer to Appendix 1.

Table 1 – Significant Intercepts from Drilling at Zgounder (core lengths)

Hole ID From To Ag Length (m)* Ag x width

(g/t)

Underground DDH

ZG-SF-24-141 129.5 135.5 626 6.0 3,756

ZG-SF-24-163 116.0 123.0 536 7.0 3,750

ZG-SF-24-164 136.0 146.5 657 10.5 6,894

Including 142.0 146.5 1,037 4.5 4,668

ZG-SF-24-183 87.2 96.5 376 9.3 3,500

DZG-SF-24-081 35.5 45.0 1,339 9.5 12,722

Including 35.5 39.5 2,984 4.0 11,934

DZG-SF-24-089 126.5 129.5 2,522 3.0 7,567

Including 128.0 129.0 7,052 1.0 7,052

DZG-SF-24-098 31.0 35.0 1,244 4.0 4,976

Including 31.0 33.0 2,242 2.0 4,484

DZG-SF-24-103 20.0 28.0 377 8.0 3,014

DZG-SF-24-105 107.0 108.5 2,485 1.5 3,728

DZG-SF-24-107 10.5 16.0 575 5.5 3,164

DZG-SF-24-108 30.0 36.0 747 6.0 4,482

DZG-SF-24-111 4.5 11.0 2,372 6.5 15,420

Including 7.0 9.5 5,674 2.5 14,184

DZG-SF-24-111 20.0 24.5 1,042 4.5 4,690

DZG-SF-24-113 4.5 11.5 583 7.0 4,078

DZG-SF-24-134 34.0 44.5 448 10.5 4,700

Underground T28

TD28-24-1975-266 18.0 25.2 605 7.2 4,354

TD28-24-1975-294 21.6 26.4 909 4.8 4,363

Including 22.8 25.2 1,702 2.4 4,085

Underground YAK

YAKD-24-1950-076 1.2 6.0 697 4.8 3346

YAKD-24-1950-079 9.6 12.0 1,480 2.4 3552

YAKD-24-1950-083 12.0 40.8 674 28.8 19,402

Including 18.0 21.6 1,320 3.6 4,752

Including 27.6 31.2 1,241 3.6 4,469

YAKD-24-1950-085 25.2 44.4 212 19.2 4,066

1 Holes were drilled at various angles; true widths are unknown at this time.

2 All assay results are above the cut-off grade of 75 g/t Ag

Figure 1: Location of Drill Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one meter in length of core, which is

halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and

assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. All

samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by atomic

absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire

assaying.

For definition drilling using T28 drilling equipment, all individual samples represent 1.2m in length.

Samples are assayed at either the Zgounder Mine laboratory or at Afrilab. At Afrilab, all samples are

analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading

above 200 g/t Ag are reanalyzed using fire assaying. At ZMSM, all samples are analyzed for silver

only using Aqua regia and finished by AAS. Rigorous quality controls (QaQc) are applied at both

locations.

David Lalonde, B.Sc. P. Geo, Vice-President Exploration, is Aya Gold & Silver’s Qualified Person and

has reviewed this press release for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the

Kingdom of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine

and is exploring its properties along the prospective South-Atlas Fault, several of which have hosted

past-producing mines and historical resources. Aya’s Moroccan mining assets are complemented by

its Tijirit Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team has been focused on maximising shareholder value by anchoring

sustainability at the heart of its operations, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the

meaning of applicable securities laws (“forward-looking statements”), which reflects management’s

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and other opportunities.

Wherever possible, words such as “planned”, “in-line”, “on-track”, “deliver”, “to plan”, “expected”,

“meaningful”, “yield” ,and similar expressions or statements that certain actions, events or results

“may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used

to identify such forward-looking information. Specific forward-looking statements in this press

release include, but are not limited to, statements and information with respect to advancement of

the commissioning work according to Aya’s plan. Although the forward-looking information contained

in this press release reflect management’s current beliefs based upon information currently available

to management and based upon what management believes to be reasonable assumptions, Aya

cannot be certain that actual results will be consistent with such forward-looking information. Such

forward-looking statements are based upon assumptions, opinions and analysis made by

management in light of its experience, current conditions, and its expectations of future

developments that management believe to be reasonable and relevant but that may prove to be

incorrect. These assumptions include, among other things, the ability to increase the resource at

Zgounder, the ability of these results to translate into an increase of resource, the ability to obtain any

requisite governmental approvals, obtaining regulatory permits for on-site work, importing goods and

machinery and employment permits, the accuracy of Mineral Reserve and Mineral Resource

Estimates (including, but not limited to, ore tonnage and ore grade estimates), the price of silver, the

price of gold, exchange rates, fuel and energy costs, future economic conditions, anticipated future

estimates of free cash flow, and courses of action. Aya cautions you not to place undue reliance upon

any such forward-looking statements.

The risks and uncertainties that may affect forward-looking statements include, among others: the

inherent risks involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver

gold and other key inputs, changes in mine plans (including, but not limited to, throughput and

recoveries being affected by metallurgical characteristics) and other factors, such as project

execution delays, many of which are beyond the control of Aya, as well as other risks and uncertainties

which are more fully described in Aya’s 2023 Annual Information Form dated March 28, 2024, and in

other filings of Aya with securities and regulatory authorities which are available on SEDAR+ at

www.sedarplus.ca. Aya does not undertake any obligation to update forward-looking statements

should assumptions related to these plans, estimates, projections, beliefs, and opinions change.

Nothing in this document should be construed as either an offer to sell or a solicitation to buy or sell

Aya securities. All references to Aya include its subsidiaries unless the context requires otherwise.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

Hole ID From To Ag Length (m)* Ag x width

(g/t)

Underground DDH

ZG-SF-24-123 235.0 236.5 88 1.5 132

ZG-SF-24-141 129.5 135.5 626 6.0 3,756

ZG-SF-24-144 182.5 183.5 944 1.0 944

ZG-SF-24-144 196.5 197.5 128 1.0 128

ZG-SF-24-150 18.5 20.0 88 1.5 132

ZG-SF-24-152 55.0 57.0 122 2.0 244

ZG-SF-24-154 84.0 85.0 104 1.0 104

ZG-SF-24-154 91.0 94.0 349 3.0 1,046

ZG-SF-24-155 1.5 6.0 167 4.5 750

ZG-SF-24-155 59.0 63.5 135 4.5 606

ZG-SF-24-156 143.0 145.0 221 2.0 442

ZG-SF-24-159 66.0 67.5 84 1.5 126

ZG-SF-24-160 149.0 150.0 1,856 1.0 1,856

ZG-SF-24-160 153.0 154.0 1,040 1.0 1,040

ZG-SF-24-160 160.0 167.0 419 7.0 2,934

Including 164.0 166.0 915 2.0 1,830

ZG-SF-24-161 113.0 113.5 108 0.5 54

ZG-SF-24-161 114.5 116.0 100 1.5 150

ZG-SF-24-163 116.0 123.0 536 7.0 3,750

ZG-SF-24-164 48.0 49.5 84 1.5 126

ZG-SF-24-164 97.0 109.0 130 12.0 1,558

ZG-SF-24-164 136.0 146.5 657 10.5 6,894

Including 142.0 146.5 1,037 4.5 4,668

ZG-SF-24-164 157.0 158.5 96 1.5 144

ZG-SF-24-180 98.5 107.0 155 8.5 1,315

ZG-SF-24-182 88.5 90.0 112 1.5 168

ZG-SF-24-182 96.0 97.5 376 1.5 564

ZG-SF-24-182 99.0 101.4 103 2.4 247

ZG-SF-24-182 107.4 108.4 88 1.0 88

ZG-SF-24-182 108.9 110.4 356 1.5 534

ZG-SF-24-183 87.2 96.5 376 9.3 3,500

Including 87.2 88.5 1,960 1.3 2,548

DZG-SF-24-078 58.0 59.5 92 1.5 138

DZG-SF-24-081 35.5 45.0 1,339 9.5 12,722

Including 35.5 39.5 2,984 4.0 11,934

DZG-SF-24-087 1.5 3.0 1,356 1.5 2,034

DZG-SF-24-087 27.0 28.5 828 1.5 1,242

DZG-SF-24-089 37.5 42.0 102 4.5 459

DZG-SF-24-089 126.5 129.5 2,522 3.0 7,567

Including 128.0 129.0 7,052 1.0 7,052

DZG-SF-24-093 7.0 8.0 192 1.0 192

DZG-SF-24-097 116.5 122.0 148 5.5 814

DZG-SF-24-098 31.0 35.0 1,244 4.0 4,976

Including 31.0 33.0 2,242 2.0 4,484

DZG-SF-24-101 20.0 21.5 88 1.5 132

DZG-SF-24-103 20.0 22.5 238 2.5 596

DZG-SF-24-103 20.0 28.0 377 8.0 3,014

Including 21.5 23.5 554 2.0 1,108

DZG-SF-24-105 27.0 28.5 80 1.5 120

DZG-SF-24-105 98.0 99.5 192 1.5 288

DZG-SF-24-105 102.5 104.0 124 1.5 186

DZG-SF-24-105 107.0 108.5 2,485 1.5 3,728

DZG-SF-24-107 10.5 16.0 575 5.5 3,164

DZG-SF-24-108 30.0 36.0 747 6.0 4,482

DZG-SF-24-111 4.5 11.0 2,372 6.5 15,420

Including 7.0 9.5 5,674 2.5 14,184

DZG-SF-24-111 20.0 24.5 1,042 4.5 4,690

DZG-SF-24-113 4.5 11.5 583 7.0 4,078

DZG-SF-24-115 6.0 10.5 224 4.5 1,008

DZG-SF-24-117 18.0 19.5 136 1.5 204

DZG-SF-24-118 30.0 32.0 758 2.0 1,516

DZG-SF-24-123 15.5 18.5 791 3.0 2,372

Including 15.5 17.5 1,088 2.0 2,176

DZG-SF-24-124 19.5 21.0 76 1.5 114

DZG-SF-24-125 59.5 60.5 77 1.0 77

DZG-SF-24-125 61.5 62.5 78 1.0 78

DZG-SF-24-125 85.0 88.0 241 3.0 723

DZG-SF-24-129 40.5 41.5 176 1.0 176

DZG-SF-24-129 43.5 44.5 224 1.0 224

DZG-SF-24-129 55.0 56.0 96 1.0 96

DZG-SF-24-129 57.0 57.5 208 0.5 104

DZG-SF-24-129 61.5 73.0 108 11.5 1,244

DZG-SF-24-129 80.5 84.5 173 4.0 690

DZG-SF-24-129 90.5 92.0 264 1.5 396

DZG-SF-24-129 98.0 102.5 196 4.5 884

DZG-SF-24-132 53.0 67.0 190 14.0 2,658

DZG-SF-24-133 28.0 29.0 316 1.0 316

DZG-SF-24-133 46.0 47.0 100 1.0 100

DZG-SF-24-133 48.5 50.0 108 1.5 162

DZG-SF-24-134 34.0 44.5 448 10.5 4,700

Including 43.0 44.5 1,240 1.5 1,860

DZG-SF-24-135 38.5 39.5 144 1.0 144

DZG-SF-24-135 42.5 44.0 168 1.5 252

DZG-SF-24-135 63.5 68.0 89 4.5 402

DZG-SF-24-135 69.5 72.5 354 3.0 1,062

DZG-SF-24-136 13.5 15.0 124 1.5 186

DZG-SF-24-148 15.0 18.0 143 3.0 429

DZG-SF-24-148 32.5 34.0 1,556 1.5 2,334

DZG-SF-24-148 50.5 55.0 176 4.5 794

DZG-SF-24-173 9.0 10.5 104 1.5 156

DZG-SF-24-173 13.5 16.5 269 3.0 808

DZG-SF-24-173 20.5 23.0 434 2.5 1,084

DZG-SF-24-173 37.5 40.5 397 3.0 1,192

Underground T28

TD28-24-1975-211 10.8 12.0 92 1.2 110

TD28-24-1975-211 13.2 16.8 88 3.6 317

TD28-24-1975-216 2.4 4.8 131 2.4 314

TD28-24-1975-221 14.4 18.0 92 3.6 331

TD28-24-1975-224 4.8 6.0 100 1.2 120

TD28-24-1975-224 13.2 14.4 92 1.2 110

TD28-24-1975-227 10.8 12.0 1,328 1.2 1,594

TD28-24-1975-227 13.2 14.4 76 1.2 91

TD28-24-1975-229 6.0 12.0 385 6.0 2,309

Including 6.0 7.2 1,428 1.2 1,714

TD28-24-1975-229 24.0 25.2 76 1.2 91

TD28-24-1975-241 15.6 16.8 108 1.2 130

TD28-24-1975-242 1.2 2.4 84 1.2 101

TD28-24-1975-243 9.6 10.8 140 1.2 168

TD28-24-1975-243 12.0 13.2 88 1.2 106

TD28-24-1975-244 0.0 4.8 183 4.8 878

TD28-24-1975-244 9.6 10.8 100 1.2 120

TD28-24-1975-244 13.2 14.4 84 1.2 101

TD28-24-1975-244 19.2 21.6 80 2.4 192

TD28-24-1975-245 3.6 4.8 108 1.2 130

TD28-24-1975-245 13.2 14.4 92 1.2 110

TD28-24-1975-246 4.8 12.0 131 7.2 943

TD28-24-1975-250 1.2 2.4 160 1.2 192

TD28-24-1975-252 20.4 21.6 76 1.2 91

TD28-24-1975-255 9.6 15.6 283 6.0 1,699

TD28-24-1975-256 19.2 24.0 99 4.8 475

TD28-24-1975-261 12.0 13.2 1,030 1.2 1,236

TD28-24-1975-261 22.8 25.2 574 2.4 1,378

TD28-24-1975-263 15.6 18.0 123 2.4 295

TD28-24-1975-263 20.4 24.0 95 3.6 341

TD28-24-1975-264 3.6 14.4 146 10.8 1,579

TD28-24-1975-265 7.2 8.4 84 1.2 101

TD28-24-1975-265 14.4 20.4 219 6.0 1,315

TD28-24-1975-266 8.4 9.6 220 1.2 264

TD28-24-1975-266 18.0 25.2 605 7.2 4,354

Including 22.8 24.0 2,400 1.2 2,880