Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Reports High-Grade Silver Results at Zgounder Extends Mineralization Near Western Fault

Drill Results

1

PRESS RELEASE

Aya Gold & Silver Reports High-Grade Silver Results at Zgounder

Extends Mineralization Near Western Fault

Montreal, Quebec, February 18, 2026 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”)

is pleased to announce high-grade silver drill results from its at-depth drill exploration program at the Zgounder Silver

Mine in the Kingdom of Morocco.

Highlights (all intersections are in core lengths)

• Intersections in the Open-Pit Area:

• Hole ZG-RC-25-853 intercepted 781 grams per tonne (“g/t”) silver (“Ag”) over 9.0 metres (“m”), including

1,295 g/t Ag over 5.0m

• Hole ZG-RC-25-855 intercepted 1,454 g/t Ag over 3.0m

• Intersections at Depth Near the Western Fault contact:

• Hole ZG-SF-25-340 intercepted 336 g/t Ag over 5.5m

• Hole ZG-SF-25-350 intercepted 2,198 g/t Ag over 1.0m

• Intersections in the Central Area:

• Hole ZG-SF-25-347 intercepted 3,581 g/t Ag over 4.5m, including 5,893 g/t Ag over 2.5m

• Hole ZG-SF-25-347 intercepted 1,729 g/t Ag over 4.1m, including 4,480 g/t Ag over 1.5m

• Hole T28-26-1072 intercepted 6,223 g/t Ag over 3.6m

• Hole T28-26-1104 intercepted 4,489 g/t Ag over 6.0m

• 3,117m or 10.3% of the 2026 exploration program has been drilled year to date.

“Today’s high-grade results once again confirm the strong continuity of silver mineralization both at depth and

around the open-pit area,” said Benoit La Salle, President & CEO. “Moreover, the new intersection at depth near the

Western Fault contact in hole ZG-SF-25-340 extends mineralization further west, continuing to push the boundary

of our current resource model.”

This release contains results from 256 holes, which include 13 surface diamond drill holes (“DDH”), 69 underground

DDH, 41 reverse circulation drill hole (“RC”), 101 T28 and 32 YAK holes (T28 and YAK: percussion drilling using an air-

compressed hammer). For a full summary of today’s results, refer to Appendix 1.

2

Table 1 – Best Intercepts at Zgounder in 2025 (core lengths)

Hole ID From To Ag Length* Ag x width

(g/t) (m)

Underground DDH

ZG-SF-25-339 251.5 253.0 1 733 1.5 2 600

ZG-SF-25-340 254.4 259.9 336 5.5 1 848

ZG-SF-25-341 341.0 345.0 1 075 4.0 4 300

Including 342.0 344.0 1 928 2.0 3 856

ZG-SF-25-342 282.5 286.0 652 3.5 2 282

ZG-SF-25-343 284.5 289.0 3 581 4.5 16 116

Including 284.5 287.0 5 893 2.5 14 732

ZG-SF-25-347 40.4 44.5 1 729 4.1 7 089

Including 43.0 44.5 4 480 1.5 6 720

ZG-SF-25-347 65.0 66.5 1 535 1.5 2 302

ZG-SF-25-347 127.0 128.5 1 228 1.5 1 842

ZG-SF-26-348 63.5 65.0 2 025 1.5 3 038

ZG-SF-26-348 129.0 133.5 1 366 4.5 6 149

ZG-SF-26-350 257.5 258.5 2 198 1.0 2 198

DZG-SF-25-776 43.0 48.5 1 138 5.5 6 260

Including 45.0 47.0 2 766 2.0 5 532

DZG-SF-25-777 53.5 58.0 844 4.5 3 798

Including 53.5 55.5 1 597 2.0 3 194

Surface RC

ZG-RC-25-853 103.0 112.0 781 9.0 7 029

Including 106.0 111.0 1 295 5.0 6 474

ZG-RC-25-854 114.0 116.0 895 2.0 1 789

ZG-RC-25-855 85.0 88.0 1 454 3.0 4 362

Underground T28

T28-25-1047 0.0 12.0 155 12.0 1 865

T28-25-1049 2.4 8.4 476 6.0 2 858

T28-25-1059 22.8 26.4 6 223 3.6 22 404

T28-26-1072 9.6 14.4 961 4.8 4 612

Including 9.6 12.0 1 790 2.4 4 296

T28-26-1075 0.0 4.8 2 934 4.8 14 083

Including 0.0 2.4 5 725 2.4 13 740

T28-26-1103 24.0 26.4 988 2.4 2 371

T28-26-1104 19.2 25.2 4 489 6.0 26 933

T28-26-1119 8.4 13.2 285 4.8 1 368

T28-26-1127 19.2 25.2 273 6.0 1 637

T28-26-1130 7.2 12.0 373 4.8 1 790

Underground YAK

YAK-25-408 3.6 4.8 6 060 1.2 7 272

* True widths are undetermined; all values are uncut.

3

Figure 1: Location of Drill Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one meter in length of core, which is halved. Half of

the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for

Mining and Environment (“Afrilab”) in Marrakech, Morocco or to ALS Laboratory at the Zgounder Mine site. All samples

are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by atomic absorption spectroscopy

(“AAS”). Samples grading above 200 g/t Ag are reanalyzed by fire assay.

For definition drilling using RC, all individual samples represent 1.0m in length and for T28 drilling equipment, all

individual samples represent 1.2m in length. Samples are assayed at either the ALS Mine laboratory or at Afrilab. All

samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading

above 200 g/t Ag are reanalyzed by fire assay. Rigorous quality controls (QaQc) are applied at both locations.

David Lalonde, B.Sc. P. Geo, Vice-President Exploration, is Aya Gold & Silver’s Qualified Person and has reviewed this

press release for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

4

Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full

mining value chain. The Corporation has established an exploration track record through a systematic, technology-led,

data-driven approach and is focused on expanding its resource base and land package along the Anti-Atlas Fault —

one of Africa’s most geologically rich, underexplored and mining-friendly regions.

Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its newly expanded processing facility. Aya’s

growth pipeline includes the Boumadine polymetallic project, where feasibility study work is underway. The project

hosts a substantial mineral resource, an extensive mineralized footprint, and significant potential for further discovery.

Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is committed to

delivering sustainable value for shareholders, employees and host communities.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCP A, MBA

President & CEO

[email protected]

Alex Ball

VP , Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the meaning of

applicable securities laws (“forward-looking statements”), which reflects management’s expectations regarding Aya’s

future growth and business prospects (including the timing and development of new deposits and the success of

exploration activities) and other opportunities. Wherever possible, words such as “aim”, “anticipate”, “assume”,

“believe”, “estimate”, “expect”, “goal”, “intend”, “objectiv e”, “plan”, “potential”, “strategy”, “target”, and similar

expressions or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely”

to be taken, occur or be achieved, have been used to identify such forwa rd-looking information. Specific forward-

looking statements in this press release include, but are not limited to, statements and information with respect to the

potential to confirm continuity of mineralization and extent mineralization to the west and other assumptions and

factors generally associated with the mining industry..

Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could

cause the actual results, performance or achievements of the Corporation to be materially different from future results,

performance or achievements expressed or implied by such information or statements. There can be no assurance

that such information or statements will prove to be accurate. Key assumptions upon which the Corporation’s forward-

looking information is based include without limitat ion, the Corporation’s ability to timely receive any requisite

approvals, permits or licences; the Corporation’s ability to import goods and machinery; the Corporation’s ability to

engage and retain all necessary personnel in order to operate its business properly and without interruption; the

accuracy and reliability of estimates, projections, forecasts, studies and assessments, including the Mineral Reserve

and Mineral Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates); the Corporation’s

ability to meet or achieve estimates, projections and forecasts; assumptions regarding development and exploration

activities; the timing, extent, duration and economic viability of such explorations activities; the price of silver; the price

of gold; exchange rates; taxation levels; fuel and energy costs; future economic conditions; the Corporation’s ability to

meet current and future obligations; the Corporation’s ability to obtain timely financing on reasonable terms when

required; anticipated future estimates of free cash flow; estimate future production; the current and future social,

5

economic and political conditions and environment in which the Corporation operates; and other assumptions and

factors generally associated with the mining industry.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been

used. Forward-looking statements are also subject to risks and uncertainties facing the Corporation’s business, any

of which could have a material adverse effect on the Corporation’s business, financial condition, results of operations

and growth prospects. Some of the risks the Corporation faces and the uncertainties that could cause actual results

to differ materially from those expressed in the forward-looking statements include, among others: the inherent risks

involved in exploration and development of mineral properties, including (1) there being no significant disruptions

affecting the operations of the Corporation whether due to artisanal miners, access to water, extreme weather events

and other or related natural disasters, labour disruptions, supply disruptions, power disruptions, damage to equipment

or otherwise; (2) permitting, development, operations and production from the Project b eing consistent with the

Corporation’s expectations; (3) political and legal developments in the Kingdom of Morocco being consistent with its

current expectations; (4) the exchange rate between the U.S. dollar and the Moroccan Dirham being approximately

consistent with current levels; (5) certain price assumptions for gold and silver; (6) prices for diesel, process reagents,

fuel oil, electricity and other key supplies being approximately consistent with current levels; (7) production and cost

of sales forecasts meeting expectations; (8) the accuracy of the current mineral resource estimates of the Corporation;

(9) labour and materials costs increasing on a basis consistent with the Corporation’s current expectations; and (10)

asset impairment (or reversal) potential, being consistent with the Corporation’s current expectations.

In addition, readers are directed to carefully review the detailed risk discussion in the Corporation’s Annual Information

Form and Management’s Discussion & Analysis for the year ended December 31, 2024, filed on SEDAR+, which

discussions are incorporated by reference in this presentation, for a fuller understanding of the risks and uncertainties

that affect the Corporation’s business and operations.

Although the Corporation believes its expectations are based upon reasonable assumptions and has attempted to

identify important factors that could cause actual actions, events or results to differ materially from those described

in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated,

estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual

results and future events could differ materially from those anticipated in such information. As such, these risks are

not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual

results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks,

uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue reliance on

forward-looking statements.

Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding

the Corporation’s business plans, financial performance and condition and may not be appropriate for other purposes.

The forward-looking statements contained herein are made only as of the date hereof. The Corporation disclaims any

intention or obligation to update or revise any forward-looking statements, whether as a result of new information,

future events or otherwise, except to the extent required by applicable law. The Corporation qualifies all of its forward-

looking statements by these cautionary statements.

Nothing in this document should be construed as either an offer to sell or a solicitation to buy or sell Aya securities.

All references to Aya include its subsidiaries unless the context requires otherwise.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

6

Hole ID From To Ag

(g/t)

Length (m)* Ag x width

Surface DDH

ZG-25-167 520.2 521.2 212 1.0 212

ZG-25-170 212.0 212.5 92 0.5 46

ZG-25-170 216.0 216.5 128 0.5 64

ZG-25-170 220.5 221.0 84 0.5 42

ZG-25-172 181.0 182.5 177 1.5 266

ZG-25-172 202.0 203.0 76 1.0 76

ZG-25-173 23.5 29.5 101 6.0 606

ZG-25-173 34.0 35.5 320 1.5 480

ZG-25-178 229.5 230.2 86 0.7 60

ZG-26-180 209.5 211.0 240 1.5 359

Underground DDH

ZG-SF-25-339 251.5 253.0 1 733 1.5 2 600

ZG-SF-25-339 261.0 264.0 164 3.0 492

ZG-SF-25-340 254.4 259.9 336 5.5 1 848

ZG-SF-25-340 262.9 264.9 264 2.0 528

ZG-SF-25-341 286.0 287.0 372 1.0 372

ZG-SF-25-341 341.0 345.0 1 075 4.0 4 300

Including 342.0 344.0 1 928 2.0 3 856

ZG-SF-25-342 260.0 262.0 133 2.0 267

ZG-SF-25-342 282.5 286.0 652 3.5 2 282

ZG-SF-25-342 360.5 362.0 76 1.5 114

ZG-SF-25-342 366.0 370.0 77 4.0 308

ZG-SF-25-342 381.0 382.5 92 1.5 138

ZG-SF-25-342 391.0 392.5 156 1.5 234

ZG-SF-25-343 284.5 289.0 3 581 4.5 16 116

Including 284.5 287.0 5 893 2.5 14 732

ZG-SF-25-344 302.5 303.4 916 0.9 824

ZG-SF-25-344 313.5 315.0 216 1.5 324

ZG-SF-25-344 318.0 319.5 104 1.5 156

ZG-SF-25-346 276.5 279.5 384 3.0 1 152

ZG-SF-25-347 40.4 44.5 1 729 4.1 7 089

Including 43.0 44.5 4 480 1.5 6 720

ZG-SF-25-347 65.0 66.5 1 535 1.5 2 302

ZG-SF-25-347 119.5 121.0 152 1.5 228

ZG-SF-25-347 127.0 128.5 1 228 1.5 1 842

ZG-SF-26-348 63.5 65.0 2 025 1.5 3 038

ZG-SF-26-348 129.0 133.5 1 366 4.5 6 149

ZG-SF-26-349 143.0 144.0 89 1.0 89

ZG-SF-26-349 157.0 158.0 76 1.0 76

ZG-SF-26-349 186.0 188.5 215 2.5 538

ZG-SF-26-350 257.5 258.5 2 198 1.0 2 198

ZG-SF-26-350 308.2 309.2 88 1.0 88

DZG-SF-25-747 85.0 85.6 272 0.6 163

7

DZG-SF-25-772 12.5 14.0 240 1.5 360

DZG-SF-25-772 51.5 52.0 2 000 0.5 1 000

DZG-SF-25-776 43.0 48.5 1 138 5.5 6 260

Including 45.0 47.0 2 766 2.0 5 532

DZG-SF-25-777 48.0 50.0 163 2.0 326

DZG-SF-25-777 53.5 58.0 844 4.5 3 798

Including 53.5 55.5 1 597 2.0 3 194

DZG-SF-25-778 7.5 11.3 310 3.8 1 178

DZG-SF-25-780 48.0 49.0 175 1.0 175

DZG-SF-25-780 59.0 60.5 82 1.5 123

DZG-SF-25-828 3.7 5.7 92 2.0 184

DZG-SF-25-840 32.0 35.5 143 3.5 499

DZG-SF-25-844 12.0 13.5 76 1.5 114

DZG-SF-26-832 18.9 20.5 146 1.6 234

DZG-SF-26-833 13.0 15.0 112 2.0 224

DZG-SF-26-858 102.0 103.5 155 1.5 232

DZG-SF-26-858 134.5 136.0 96 1.5 144

Surface RC

ZG-RC-25-849 104.0 105.0 503 1.0 503

ZG-RC-25-850 113.0 114.0 87 1.0 87

ZG-RC-25-852 98.0 99.0 95 1.0 95

ZG-RC-25-853 92.0 95.0 332 3.0 995

ZG-RC-25-853 101.0 102.0 124 1.0 124

ZG-RC-25-853 103.0 112.0 781 9.0 7 029

Including 106.0 111.0 1 295 5.0 6 474

ZG-RC-25-853 134.0 135.0 83 1.0 83

ZG-RC-25-853 137.0 138.0 93 1.0 93

ZG-RC-25-854 9.0 10.0 110 1.0 110

ZG-RC-25-854 17.0 18.0 119 1.0 119

ZG-RC-25-854 114.0 116.0 895 2.0 1 789

ZG-RC-25-855 10.0 11.0 167 1.0 167

ZG-RC-25-855 77.0 78.0 86 1.0 86

ZG-RC-25-855 85.0 88.0 1 454 3.0 4 362

ZG-RC-25-855 97.0 100.0 139 3.0 416

ZG-RC-25-855 102.0 103.0 86 1.0 86

ZG-RC-25-857 49.0 51.0 184 2.0 367

ZG-RC-25-857 77.0 78.0 89 1.0 89

ZG-RC-25-857 91.0 92.0 159 1.0 159

ZG-RC-26-753 54.0 55.0 79 1.0 79

ZG-RC-26-806 10.0 11.0 85 1.0 85

ZG-RC-26-841 42.0 43.0 180 1.0 180

ZG-RC-26-841 70.0 71.0 192 1.0 192

ZG-RC-26-841 92.0 93.0 102 1.0 102

ZG-RC-26-920 57.0 58.0 80 1.0 80

Underground T28

T28-25-965 9.6 10.8 556 1.2 667

8

T28-25-970 9.6 12.0 99 2.4 238

T28-25-970 18.0 19.2 119 1.2 143

T28-25-971 3.6 6.0 390 2.4 935

T28-25-973 6.0 9.6 146 3.6 526

T28-25-977 3.6 6.0 114 2.4 272

T28-25-985 16.8 18.0 201 1.2 241

T28-25-987 22.8 26.4 132 3.6 474

T28-25-991 24.0 26.4 142 2.4 341

T28-25-998 2.4 3.6 93 1.2 112

T28-25-1000 16.8 18.0 188 1.2 226

T28-25-1001 2.4 3.6 94 1.2 113

T28-25-1040 9.6 12.0 192 2.4 461

T28-25-1046 10.8 12.0 82 1.2 98

T28-25-1047 0.0 12.0 155 12.0 1 865

T28-25-1047 14.4 15.6 113 1.2 136

T28-25-1048 0.0 2.4 118 2.4 283

T28-25-1048 7.2 8.4 91 1.2 109

T28-25-1048 9.6 10.8 101 1.2 121

T28-25-1049 2.4 8.4 476 6.0 2 858

T28-25-1049 18.0 19.2 76 1.2 91

T28-25-1050 20.4 22.8 211 2.4 505

T28-25-1055 14.4 15.6 113 1.2 136

T28-25-1057 10.8 12.0 216 1.2 259

T28-25-1057 14.4 18.0 180 3.6 647

T28-25-1059 22.8 26.4 6 223 3.6 22 404

T28-25-1062 24.0 25.2 91 1.2 109

T28-26-1066 3.6 4.8 203 1.2 244

T28-26-1070 7.2 8.4 94 1.2 113

T28-26-1072 9.6 14.4 961 4.8 4 612

Including 9.6 12.0 1 790 2.4 4 296

T28-26-1074 0.0 2.4 108 2.4 259

T28-26-1075 0.0 4.8 2 934 4.8 14 083

Including 0.0 2.4 5 725 2.4 13 740

T28-26-1101 2.4 6.0 105 3.6 379

T28-26-1103 24.0 26.4 988 2.4 2371

T28-26-1104 19.2 25.2 4 489 6.0 26 933

T28-26-1119 8.4 13.2 285 4.8 1 368

T28-26-1127 19.2 25.2 273 6.0 1 637

T28-26-1128 15.6 19.2 128 3.6 461

T28-26-1130 7.2 12.0 373 4.8 1 790

T28-26-1131 10.8 15.6 100 4.8 480

Underground YAK

YAK-25-408 3.6 4.8 6 060 1.2 7 272

YAK-25-408 27.6 28.8 146 1.2 175

YAK-25-414 20.4 21.6 448 1.2 538

YAK-25-414 36.0 37.2 488 1.2 586