Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Reports High-Grade Silver Results at Zgounder

Drill Results

1

PRESS RELEASE

Aya Gold & Silver Reports High-Grade Silver Results at Zgounder

Montreal, Quebec, December 9, 2025 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”)

is pleased to announce additional high-grade silver drill results from its at-depth drill exploration program at the

Zgounder Silver Mine in the Kingdom of Morocco.

Highlights

(all intersections are in core lengths)

• Intersections in the open-pit area:

• Hole ZG-RC-25-478 intercepted 677 grams per tonne (“g/t”) silver (“Ag”) over 15.0 metres (“m”), including

2,138 g/t Ag over 3.0m

• Hole DZG-SF-25-715 intercepted 1,972 g/t Ag over 3.2m

• Hole ZG-RC-25-462 intercepted 502 g/t Ag over 11.0m

• Intersections at Depth Near the Western Fault contact:

• Hole ZG-SF-25-336 intercepted 2,718 g/t Ag over 1.3m

• Intersections in the Central Area:

• Hole T28-25-904 intercepted 1,631 g/t Ag over 7.2m, including 3,100 g/t Ag over 3.6m

• Hole T28-25-942 intercepted 1,947 g/t Ag over 6.0m, including 2,359 g/t Ag over 4.8m

• Hole T28-25-894 intercepted 1,339 g/t Ag over 6.0m

• Exploration Update:

• 21,314m or 85% of the 2025 exploration program has been drilled year to date.

“To d a y ’s h i g h-grade results once again confirm the strong continuity of silver mineralization both at depth and

around the open-pit area, ” said Benoit La Salle, President & CEO. “Moreover, the new intersection at depth near

the Western Fault contact in hole ZG -SF-25-336 extends mineralization further west, continuing to push the

limits of our current resource model. ”

This release contains results from 169 holes, which include 54 underground diamond drill holes (“DDH”), five surface

DDH, 48 reverse circulation drill hole (“RC”), 40 T28 and 22 YAK holes (T28 and YAK: percussion drilling using an air-

compressed hammer). For a full summary of today’s results, refer to Appendix 1.

2

Table 1 – Significant Intercepts from Drilling at Zgounder (Core Lengths)

Hole ID From To Ag Length Ag x width

(g/t) (m)

Underground DDH

ZG-SF-25-336 389.0 390.3 2,718 1.3 3,533

DZG-SF-25-715 3.8 7.0 1,972 3.2 6,311

DZG-SF-25-792 4.0 6.5 1,449 2.5 3,622

Surface RC

ZG-RC-25-462 11.0 22.0 502 11.0 5,527

ZG-RC-25-478 3.0 18.0 677 15.0 10,155

Including 3.0 6.0 2,138 3.0 6,415

ZG-RC-25-813 48.0 51.0 1,500 3.0 4,499

ZG-RC-25-816 20.0 25.0 925 5.0 4,627

Including 20.0 22.0 2,188 2.0 4,375

ZG-RC-25-827 5.0 8.0 1,386 3.0 4,158

ZG-RC-25-831 6.0 9.0 1,537 3.0 4,610

ZG-RC-25-866 29.0 45.0 277 16.0 4,428

ZG-RC-25-867 9.0 23.0 340 14.0 4,766

Underground T28

T28-25-846 13.2 14.4 3,870 1.2 4,644

T28-25-871 0.0 3.6 1,010 3.6 3,637

T28-25-894 7.2 13.2 1,339 6.0 8,035

T28-25-899 8.4 14.4 885 6.0 5,312

Including 12.0 14.4 1,848 2.4 4,434

T28-25-904 8.4 15.6 1,631 7.2 11,744

Including 8.4 12.0 3,100 3.6 11,160

T28-25-942 20.4 26.4 1,947 6.0 11,682

Including 21.6 26.4 2,359 4.8 11,324

T28-25-946 12.0 21.6 561 9.6 5,383

Including 12.0 14.4 1,650 2.4 3,960

T28-25-961 9.6 12.0 2,465 2.4 5,916

Underground YAK

YAK-25-384 10.8 24.0 400 13.2 5,275

Including 10.8 13.2 1,473 2.4 3,534

YAK-25-385 21.6 28.8 885 7.2 6,372

Including 21.6 24.0 1,693 2.4 4,062

YAK-25-386 9.6 15.6 2,021 6.0 12,127

Including 13.2 15.6 4,880 2.4 11,712

YAK-25-392 10.8 16.8 738 6.0 4,428

YAK-25-393 20.4 30.0 458 9.6 4,398

* True width remains undetermined at this stage; all values are uncut.

3

Figure 1: Location of Drill Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one meter in length of core, which is halved. Half of

the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory

for Mining and Environment (“Afrilab”) in Marrakech, Morocco or to ALS Laboratory at the Zgounder Mine site. All

samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by atomic absorption

spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed by fire assay.

For definition drilling using RC, all individual samples represent 1.0m in length and for T28 drilling equipment, all

individual samples represent 1.2m in length. Samples are assayed at either the ALS Mine laboratory or at Afrilab. All

samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading

above 200 g/t Ag are reanalyzed by fire assay. Rigorous quality controls (QaQc) are applied at both locations.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David Lalonde, B. Sc,

P. G e o , V i c e-President Exploration, Qualified Person, for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom of Morocco.

4

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and is exploring its

properties along the prospective Anti-Atlas Fault, several of which have hosted past -producing mines and historical

resources.

Aya’s management team has been focused on maximizing shareholder value by anchoring sustainability at the heart

of its operations, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCP A, MBA

President & CEO

[email protected]

Alex Ball

VP , Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the meaning

of applicable securities laws (“forward-looking statements”), which reflects management’s expectations

regarding Aya’s future growth and business prospects (including the timing and development of new deposits and the

success of exploration activities) and other opportunities. Wherever possible, words such as “potential”, “plan”,

“additional”, “grow”, “significant”, and similar expressions or statements that certain actions, events or results “may”,

“could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such

forward-looking information. Specific forward-looking statements in this press release include, but are not limited to,

statements and information with respect to the continuity of the mineralization and its grade, the potential to

meaningfully grow near-mine resources, to follow up aggressively with additional drilling , to execute on planned

drilling in the area through the remainder of 2025, the potential to significantly increase high-grade ounces within and

near the open pit area, expanding open-pit operations in the near term, enhancing the resource and better

understanding the deposit as well as exploration results in the open-pit and underground areas. Although the forward-

looking information contained in this press release reflect management’s current beliefs based upon information

currently available to management and based upon what management believes to be reasonable assumptions, Aya

cannot be certain that actual results will be consistent with such forward-looking information. Such forward-looking

statements are based upon assumptions, opinions and analysis made by management in light of its experience,

current conditions, and its expectations of future developments that management believe to be reasonable and

relevant but that may prove to be incorrect. These assumptions include, among other things, the ability to obtain any

requisite governmental approvals, obtaining regulatory permits for on-site work, importing goods and machinery and

employment permits, the accuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited to,

ore tonnage and ore grade estimates), the price of silver, the price of gold, exchange rates, fuel and energy costs,

future economic conditions, anticipated future estimates of free cash flow, and courses of action. Aya cautions you

not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks

involved in exploration and development of mineral properties, including government approvals and permitting,

changes in economic conditions, changes in the worldwide price of silver gold and other key inputs, changes in mine

plans (including, but not limited to, throughput and recoveries being affected by metallurgical characteristics) and

other factors, such as project execution delays, many of which are beyond the control of Aya, as well as other risks

and uncertainties which are more fully described in Aya’s 2024 Annual Information Form dated March 31, 2025, and

5

in other filings of Aya with securities and regulatory authorities which are available on SEDAR+ at www.sedarplus.ca.

Aya does not undertake any obligation to update forward-looking statements should assumptions related to these

plans, estimates, projections, beliefs, and opinions change. Nothing in this document should be construed as either

an offer to sell or a solicitation to buy or sell Aya securities. All references to Aya include its subsidiaries unless the

context requires otherwise.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

Hole ID From To Ag Length (m)* Ag x width

(g/t)

Surface DDH

ZG-25-159 300.5 301.0 84 0.5 42

ZG-25-161 275.5 277.0 100 1.5 150

ZG-25-162 235.7 236.7 95 1.0 95

ZG-25-165 223.0 224.5 221 1.5 332

ZG-25-167 373.8 374.5 608 0.7 426

Underground DDH

ZG-SF-24-199 129.5 131.5 395 2.0 790

ZG-SF-25-321 224.5 226.0 931 1.5 1,397

ZG-SF-25-321 277.0 278.5 432 1.5 648

ZG-SF-25-321 307.3 309.7 219 2.4 526

ZG-SF-25-321 319.0 320.5 799 1.5 1,199

ZG-SF-25-321 330.5 331.5 542 1.0 542

ZG-SF-25-321 344.2 345.2 443 1.0 443

ZG-SF-25-321 388.6 392.3 199 3.7 736

ZG-SF-25-324 226.4 227.5 210 1.1 231

ZG-SF-25-324 268.0 270.3 1,350 2.3 3,106

ZG-SF-25-324 326.0 328.2 118 2.2 260

ZG-SF-25-324 350.0 350.5 269 0.5 135

ZG-SF-25-324 355.3 359.2 206 3.9 802

ZG-SF-25-325 272.0 273.5 77 1.5 116

ZG-SF-25-325 276.0 280.1 358 4.1 1,469

ZG-SF-25-325 295.0 296.0 110 1.0 110

ZG-SF-25-325 302.0 306.0 127 4.0 508

ZG-SF-25-325 335.0 336.5 86 1.5 129

ZG-SF-25-328 121.0 122.0 1,235 1.0 1,235

ZG-SF-25-330 82.8 84.0 183 1.2 220

ZG-SF-25-330 125.0 126.0 166 1.0 166

ZG-SF-25-335 122.0 122.5 306 0.5 153

ZG-SF-25-335 122.0 123.0 285 1.0 285

ZG-SF-25-335 218.5 220.0 922 1.5 1,383

ZG-SF-25-335 281.5 282.5 89 1.0 89

ZG-SF-25-336 333.0 334.0 181 1.0 181

ZG-SF-25-336 382.5 383.5 230 1.0 230

ZG-SF-25-336 389.0 390.3 2,718 1.3 3,533

6

ZG-SF-25-337 321.7 323.7 98 2.0 196

ZG-SF-25-338 260.1 261.2 92 1.1 101

ZG-SF-25-338 265.5 267.0 92 1.5 138

ZG-SF-25-339 250.5 253.0 988 2.5 2,470

ZG-SF-25-339 261.0 264.0 168 3.0 504

ZG-SF-25-339 282.0 286.5 200 4.5 900

ZG-SF-25-339 305.0 305.5 1,536 0.5 768

DZG-SF-25-634 37.5 39.0 174 1.5 261

DZG-SF-25-636 24.5 25.2 126 0.7 88

DZG-SF-25-636 55.0 55.5 170 0.5 85

DZG-SF-25-636 56.5 59.0 334 2.5 835

DZG-SF-25-668 36.4 37.5 94 1.1 103

DZG-SF-25-669 35.1 37.5 440 2.4 1,055

DZG-SF-25-670 15.0 17.0 1,400 2.0 2,800

DZG-SF-25-670 21.5 27.0 368 5.5 2,022

DZG-SF-25-671 39.0 40.0 142 1.0 142

DZG-SF-25-674 13.5 16.0 656 2.5 1,641

DZG-SF-25-674 19.0 20.5 85 1.5 128

DZG-SF-25-675 12.0 15.0 442 3.0 1,326

DZG-SF-25-675 22.0 22.5 160 0.5 80

DZG-SF-25-676 27.0 30.0 212 3.0 635

DZG-SF-25-676 38.0 39.0 223 1.0 223

DZG-SF-25-678 8.9 19.8 125 10.9 1,362

DZG-SF-25-681 59.2 60.6 80 1.4 112

DZG-SF-25-682 28.5 29.5 147 1.0 147

DZG-SF-25-682 37.0 37.7 116 0.7 81

DZG-SF-25-683 4.7 5.4 110 0.7 77

DZG-SF-25-683 8.0 10.0 519 2.0 1,038

DZG-SF-25-684 40.0 41.0 608 1.0 608

DZG-SF-25-684 45.0 47.0 152 2.0 304

DZG-SF-25-688 14.0 15.0 1,830 1.0 1,830

DZG-SF-25-688 18.0 19.5 151 1.5 227

DZG-SF-25-710 8.2 9.0 180 0.8 144

DZG-SF-25-710 36.0 37.5 150 1.5 225

DZG-SF-25-711 6.6 7.2 152 0.6 91

DZG-SF-25-711 13.9 14.5 84 0.6 50

DZG-SF-25-712 4.3 5.5 183 1.2 220

DZG-SF-25-713 13.5 19.2 159 5.7 906

DZG-SF-25-713 30.2 30.4 150 0.2 30

DZG-SF-25-714 16.7 19.0 257 2.3 592

DZG-SF-25-715 3.8 7.0 1,972 3.2 6,311

DZG-SF-25-715 21.0 22.0 90 1.0 90

DZG-SF-25-729 5.2 6.5 152 1.3 198

DZG-SF-25-729 43.0 44.1 252 1.1 277

DZG-SF-25-730 38.1 39.0 415 0.9 373

7

DZG-SF-25-730 42.5 43.0 108 0.5 54

DZG-SF-25-730 58.0 59.4 102 1.4 143

DZG-SF-25-732 14.5 15.6 148 1.1 163

DZG-SF-25-752 38.3 39.0 115 0.7 81

DZG-SF-25-752 40.4 41.8 76 1.4 106

DZG-SF-25-754 24.8 29.4 159 4.6 731

DZG-SF-25-755 24.0 25.0 402 1.0 402

DZG-SF-25-755 26.1 26.6 164 0.5 82

DZG-SF-25-755 53.5 56.0 202 2.5 506

DZG-SF-25-758 68.0 69.0 126 1.0 126

DZG-SF-25-759 48.0 48.8 114 0.8 91

DZG-SF-25-761 14.5 15.5 81 1.0 81

DZG-SF-25-762 10.5 12.0 203 1.5 305

DZG-SF-25-762 38.0 41.0 496 3.0 1,488

DZG-SF-25-765 44.0 45.0 1,550 1.0 1,550

DZG-SF-25-782 30.0 31.5 94 1.5 141

DZG-SF-25-783 6.0 7.5 148 1.5 222

DZG-SF-25-786 64.0 67.2 935 3.2 2,993

DZG-SF-25-787 25.5 27.0 88 1.5 132

DZG-SF-25-790 8.5 10.0 776 1.5 1,164

DZG-SF-25-790 31.1 31.6 144 0.5 72

DZG-SF-25-790 59.5 62.0 163 2.5 408

DZG-SF-25-790 83.5 86.5 122 3.0 366

DZG-SF-25-791 7.5 8.0 131 0.5 66

DZG-SF-25-791 90.0 91.0 532 1.0 532

DZG-SF-25-792 4.0 6.5 1,449 2.5 3,622

DZG-SF-25-793 4.5 6.0 112 1.5 168

DZG-SF-25-799 51.0 54.0 118 3.0 354

DZG-SF-25-819 26.8 29.3 280 2.5 700

DZG-SF-25-838 11.0 13.0 278 2.0 555

Surface RC

ZG-RC-25-458 3.0 4.0 133 1.0 133

ZG-RC-25-458 37.0 38.0 95 1.0 95

ZG-RC-25-460 25.0 26.0 118 1.0 118

ZG-RC-25-462 1.0 5.0 546 4.0 2,185

ZG-RC-25-462 11.0 22.0 502 11.0 5,527

Including 14.0 16.0 1,105 2.0 2,210

ZG-RC-25-462 48.0 49.0 113 1.0 113

ZG-RC-25-462 63.0 69.0 322 6.0 1,930

ZG-RC-25-474 47.0 57.0 190 10.0 1,902

ZG-RC-25-478 3.0 18.0 677 15.0 10,155

Including 3.0 6.0 2,138 3.0 6,415

ZG-RC-25-478 51.0 54.0 402 3.0 1,205

ZG-RC-25-492 0.0 1.0 89 1.0 89

ZG-RC-25-492 5.0 7.0 141 2.0 282

8

ZG-RC-25-492 20.0 21.0 103 1.0 103

ZG-RC-25-492 40.0 42.0 146 2.0 291

ZG-RC-25-506 10.0 11.0 79 1.0 79

ZG-RC-25-506 12.0 14.0 107 2.0 214

ZG-RC-25-506 20.0 21.0 81 1.0 81

ZG-RC-25-506 23.0 24.0 94 1.0 94

ZG-RC-25-517 15.0 16.0 89 1.0 89

ZG-RC-25-517 18.0 23.0 271 5.0 1,357

ZG-RC-25-558 0.0 3.0 167 3.0 501

ZG-RC-25-558 13.0 14.0 256 1.0 256

ZG-RC-25-714 4.0 5.0 185 1.0 185

ZG-RC-25-726 0.0 2.0 126 2.0 252

ZG-RC-25-745 1.0 4.0 308 3.0 924

ZG-RC-25-746 5.0 6.0 397 1.0 397

ZG-RC-25-746 47.0 48.0 133 1.0 133

ZG-RC-25-757 3.0 4.0 198 1.0 198

ZG-RC-25-757 16.0 17.0 362 1.0 362

ZG-RC-25-758 2.0 5.0 97 3.0 290

ZG-RC-25-758 24.0 26.0 1,339 2.0 2,678

ZG-RC-25-759 0.0 1.0 101 1.0 101

ZG-RC-25-759 3.0 4.0 142 1.0 142

ZG-RC-25-759 29.0 31.0 358 2.0 715

ZG-RC-25-759 39.0 40.0 77 1.0 77

ZG-RC-25-759 46.0 47.0 156 1.0 156

ZG-RC-25-759 56.0 59.0 257 3.0 772

ZG-RC-25-760 11.0 12.0 289 1.0 289

ZG-RC-25-760 23.0 24.0 84 1.0 84

ZG-RC-25-772 1.0 2.0 381 1.0 381

ZG-RC-25-801 4.0 6.0 566 2.0 1,132

ZG-RC-25-807 14.0 15.0 334 1.0 334

ZG-RC-25-807 33.0 34.0 127 1.0 127

ZG-RC-25-807 40.0 42.0 167 2.0 334

ZG-RC-25-808 5.0 6.0 391 1.0 391

ZG-RC-25-809 0.0 1.0 112 1.0 112

ZG-RC-25-809 8.0 11.0 678 3.0 2,035

ZG-RC-25-813 42.0 43.0 779 1.0 779

ZG-RC-25-813 48.0 51.0 1,500 3.0 4,499

ZG-RC-25-814 5.0 6.0 1,595 1.0 1,595

ZG-RC-25-814 22.0 24.0 259 2.0 517

ZG-RC-25-814 31.0 33.0 116 2.0 231

ZG-RC-25-815 52.0 53.0 90 1.0 90

ZG-RC-25-816 3.0 4.0 99 1.0 99

ZG-RC-25-816 20.0 25.0 925 5.0 4,627

Including 20.0 22.0 2,188 2.0 4,375

ZG-RC-25-816 48.0 50.0 564 2.0 1,128