Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Reports High-Grade Silver Exploration Results Near Pit and at Depth at Zgounder

Drill Results

Aya Gold & Silver Reports High-Grade Silver Exploration

Results Near Pit and at Depth at Zgounder

Montreal, Quebec, September 16, 2026 - Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) (“Aya” or the

“Company”) is pleased to announce high-grade silver drill results from its at-depth drill exploration

program at the Zgounder Silver Mine (“Zgounder”) in the Kingdom of Morocco.

Highlights (all intersections are in core lengths)

• Intersections in the Open-Pit Area:

• Hole ZG-RC-24-155 intercepted 783 grams per tonne (“g/t”) silver (“Ag”) over 13.0 metres (“m”)

• Hole ZG-RC-24-354 intercepted 501 g/t Ag over 11.0m, including 4,000 g/t over 1.0m

• Hole ZG-SF-25-702 intercepted 1,553 g/t Ag over 1.4m

• Intersections in the Central Area:

• Hole DZG-SF-26-945 intercepted 3,501 g/t Ag over 3.5m, including 7,717 g/t Ag over 1.5m

• Hole T28-26-1334 intercepted 4,770 g/t Ag over 2.4m

• Hole T28-26-1333 intercepted 1,362 g/t Ag over 8.4m, including 2,873 g/t Ag over 3.6m

• Hole T28-26-1404 intercepted 762 g/t Ag over 12.0m

• 16,217m or 54.1% of the 2026 exploration program has been drilled year to date.

"Today’s high-grade results, highlighted by DZG-SF-26-945, continue to reinforce the strength and

continuity of silver mineralization both around the open pit and across the central zone,” said Benoit La

Salle, President & CEO. “At the same time, development of the exploration drift at the 1,825-metre level

is progressing well, setting the stage for drilling west of the fault to begin in Q4 and providing an

important new opportunity to expand the mineralized footprint.”

This release contains results from 97 holes, which include one surface diamond drill holes (“DDH”), 31

underground DDH, seven reverse circulation drill hole (“RC”), 45 T28 and 13 YAK holes (T28 and YAK:

percussion drilling using an air-compressed hammer). For a full summary of today’s results, refer to

Appendix 1 and 2.

PRESS RELEASE

Table 1 – Best Intercepts at Zgounder (core lengths)

Hole ID From To Ag Length* Ag x width

(g/t) (m)

Underground DDH

DZG-SF-25-702 58.3 59.7 1,553 1.4 2,174

DZG-SF-25-789 18.5 21.0 760 2.5 1,901

DZG-SF-26-885 124.0 125.0 1,503 1.0 1,503

DZG-SF-26-898 109.5 111.0 1,208 1.5 1,812

DZG-SF-26-943 34.5 36.0 874 1.5 1,311

DZG-SF-26-945 16.0 19.5 3,501 3.5 12,254

Including 16.5 18.0 7,717 1.5 11,575

Surface RC

ZG-RC-24-155 0.0 13.0 783 13.0 10,180

ZG-RC-24-354 2.0 13.0 501 11.0 5,512

Including 6.0 7.0 4,000 1.0 4,000

Underground T28

T28-26-1325 0.0 9.6 302 9.6 2,903

T28-26-1333 9.6 18.0 1,362 8.4 11,437

Including 9.6 13.2 2,873 3.6 10,344

T28-26-1334 24.0 26.4 4,770 2.4 11,448

T28-26-1335 13.2 15.6 1,603 2.4 3,846

T28-26-1358 16.8 24.0 450 7.2 3,242

T28-26-1401 7.2 15.6 258 8.4 2,164

T28-26-1404 7.2 19.2 762 12.0 9,149

T28-26-1420 3.6 26.4 297 22.8 6,775

Including 3.6 14.4 382 10.8 4,128

T28-26-1441 18.0 25.2 403 7.2 2,898

Including 21.6 25.2 695 3.6 2,501

T28-26-1443 14.4 25.2 468 10.8 5,050

Including 14.4 16.8 1,168 2.4 2,802

T28-26-1447 7.2 18.0 232 10.8 2,506

T28-26-1448 19.2 24.0 450 4.8 2,158

Underground YAK

YAK-26-554 12.0 15.6 1,670 3.6 6,012

YAK-26-571 9.6 13.2 606 3.6 2,182

YAK-26-575 33.6 36.0 1,715 2.4 4,116

Figure 1: Location of Drill Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one meter in length of core, which is

halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and

assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco or to ALS

Laboratory at the Zgounder Mine site. All samples are analyzed for silver, copper, iron, lead, and zinc using

Aqua regia and finished by atomic absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag

are reanalyzed by fire assay.

For definition drilling using RC, all individual samples represent 1.0m in length and for T28 drilling

equipment, all individual samples represent 1.2m in length. Samples are assayed at either the ALS Mine

laboratory or at Afrilab. All samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia

and finished by AAS. Samples grading above 200 g/t Ag are reanalyzed by fire assay. Rigorous quality

controls (QaQc) are applied at both locations.

Qualified Person

The scientific and technical information contained in this press release has been reviewed, verified and

approved by David Lalonde, B. Sc, P. Geo, Executive Vice-President, Exploration, Qualified Person, for

accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across

the full mining value chain. The Company has established an exploration track record through a

systematic, technology-led, data-driven approach and is focused on expanding its resource base and land

package along the Anti-Atlas fault — one of Africa’s most geologically rich, underexplored and mining-

friendly regions.

Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility.

Aya’s growth pipeline includes the Boumadine polymetallic project, where feasibility study work is

underway, and which hosts a sizable mineralized footprint, and potential for further discovery.

Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is

committed to delivering sustainable value for shareholders, employees and host communities.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

Executive Vice-President, Capital Markets

[email protected]

Forward-Looking Statement

This press release contains “forward-looking statements” or “forward-looking information” within the

meaning of applicable securities laws and other statements that are not historical facts. Forward-looking

statements are included to provide information about management’s current expectations, estimates and

projections regarding Aya’s future growth and business prospects (including the timing and development

of deposits and the success of exploration activities) and other opportunities as of the date of this press

release.

All statements, other than statements of historical fact included in this press release, regarding the

Company’s strategy, future operations, technical assessments, prospects, plans and objectives of

management are forward-looking statements that involve risks and uncertainties. Wherever possible,

words such as "aim", "anticipate", "assume", "believe", "estimate", "expect", "goal", "guidance", "intend",

"objective", "plan", "potential", "strategy", "target", and similar expressions or statements that certain

actions, events or results "may", "could", "would", "might", "will", or are "likely" to be taken, occur or be

achieved, have been used to identify such forward-looking information. Forward-looking statements in

this press release include, but are not limited to, statements with respect to : the 2026 exploration

program; the timing and commencement of drilling west of the fault at Zgounder; and the potential

expansion of the mineralized footprint at Zgounder.

Forward-looking information is based upon certain assumptions and other important factors that, if

untrue, could cause the actual results, performance or achievements of the Company to be materially

different from future results, performance or achievements expressed or implied by such information or

statements. There can be no assurance that such information or statements will prove to be accurate.

Key assumptions upon which the Company’s forward-looking information is based include without

limitation, assumptions regarding development and exploration activities; the Company’s ability to

execute its business plans and objectives; the ability to commence and successfully execute planned

drilling and exploration activities; the accuracy of the Company’s geological interpretations and the

continuity of mineralization in areas targeted for exploration; the continued validity and good standing of

the mining titles necessary to conduct the planned exploration activities; the timely receipt of necessary

approvals or permits; the ability to obtain timely financing on reasonable terms when required; future

social, economic and political conditions remaining consistent with those currently prevailing; the

availability of qualified contractors, consultants, suppliers, equipment, materials and labour on

commercially reasonable terms; and the cooperation of government authorities, municipalities and other

stakeholders.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may

have been used. Forward-looking statements are also subject to risks and uncertainties facing the

Company’s business, any of which could have a material adverse effect on the Company’s business,

financial condition, results of operations and growth prospects. Some of the risks the Company faces and

the uncertainties that could cause actual results to differ materially from those expressed in the forward-

looking statements include, among others: Aya’s ability to execute on its plans relating to the Zgounder

Project, including the timing thereof; delays in the development of the exploration drift or in accessing

areas targeted for drilling; delays in the commencement or completion of planned drilling and exploration

activities; the risk that exploration results may not be indicative of future results; risks and hazards

associated with the business of mineral exploration, development and mining, including environmental

hazards, potential unintended releases of contaminants, industrial accidents, unusual or unexpected

geological or structural formations, pressures, cave-ins, and flooding; risks related to Aya’s operations in

Morocco; the speculative nature of mineral exploration and development; inadequate or unreliable

infrastructure (such as roads, bridges, power sources and water supplies); fluctuations in forward

markets for silver and other commodities (such as natural gas, fuel, oil and electricity); availability of gas,

fuel and oil; restrictions on mining in the jurisdictions in which Aya operates; changes in laws and

regulations governing our operations, exploration, and development activities, including international laws

and legal norms; the potential impact of future pandemics or epidemics on the Company’s operations,

and assumptions related thereto; Aya’s ability to attract and retain qualified employees and contractors;

Aya’s ability to obtain and renew necessary permits and licences; Aya’s ability to obtain and maintain

insurance; occupational health and safety risks; adverse publicity risks; third-party risks; disruptions to

Aya’s business operations; Aya’s reliance on technology and information systems; unforeseen expenses;

public health crises; climate change; weather disruptions; general economic conditions; force majeure; the

inherent risks involved in exploration and development of mineral properties; and other risks described in

the Company’s documents filed with Canadian and U.S. securities regulatory authorities.

In addition, readers are directed to carefully review the detailed risk discussion in the Company’s Annual

Information Form and Management’s Discussion & Analysis for the year ended December 31, 2025, filed

on SEDAR+ and on EDGAR, which discussions are incorporated by reference in this press release, for a

fuller understanding of the risks and uncertainties that affect the Company’s business and operations.

Although the Company believes its expectations are based upon reasonable assumptions and has

attempted to identify important factors that could cause actual actions, events or results to differ

materially from those described in forward-looking statements, there may be other factors that cause

actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that

forward-looking information will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such information. As such, these risks are not exhaustive; however,

they should be considered carefully. If any of these risks or uncertainties materialize, actual results may

vary materially from those anticipated in the forward-looking statements found herein. Due to the risks,

uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue

reliance on forward-looking statements.

Forward-looking statements contained herein are presented for the purpose of assisting investors in

understanding the Company’s business plans, financial performance and condition and may not be

appropriate for other purposes.

The forward-looking statements contained herein are made only as of the date hereof. The Company

disclaims any intention or obligation to update or revise any forward-looking statements, whether as a

result of new information, future events or otherwise, except to the extent required by applicable law. The

Company qualifies all of its forward-looking statements by these cautionary statements.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

Hole ID From To Ag Length* Ag x width

(g/t) (m)

Surface DDH

ZG-26-211 537.0 538.0 645 1.0 645

Underground DDH

ZG-26-211 537.0 538.0 645 1.0 645

ZG-SF-26-361 135.0 136.0 358 1.0 358

ZG-SF-26-361 155.0 157.0 147 2.0 294

ZG-SF-26-361 170.0 174.0 268 4.0 1,071

ZG-SF-TS-26-008A 31.0 31.5 220 0.5 110

ZG-SF-TS-26-008A 50.5 52.0 172 1.5 258

DZG-SF-25-702 58.3 59.7 1,553 1.4 2,174

DZG-SF-25-708 46.9 48.0 356 1.1 392

DZG-SF-25-727 0.0 1.7 108 1.7 183

DZG-SF-25-771 30.5 32.0 240 1.5 360

DZG-SF-25-773 26.0 27.5 388 1.5 582

DZG-SF-25-789 2.5 3.5 561 1.0 561

DZG-SF-25-789 18.5 21.0 760 2.5 1,901

DZG-SF-26-829 6.5 8.0 136 1.5 204

DZG-SF-26-871 72.0 73.5 288 1.5 432

DZG-SF-26-879 56.0 57.0 104 1.0 104

DZG-SF-26-884 81.0 82.1 212 1.1 233

DZG-SF-26-885 124.0 125.0 1,503 1.0 1,503

DZG-SF-26-886 45.5 46.0 364 0.5 182

DZG-SF-26-891 42.0 43.5 83 1.5 125

DZG-SF-26-895 56.5 57.5 206 1.0 206

DZG-SF-26-898 109.5 111.0 1,208 1.5 1,812

DZG-SF-26-899 31.0 32.0 384 1.0 384

DZG-SF-26-900 30.5 31.5 1,147 1.0 1,147

DZG-SF-26-904 30.0 33.0 111 3.0 333

DZG-SF-26-910 33.0 34.5 121 1.5 182

DZG-SF-26-912 95.0 96.5 291 1.5 436

DZG-SF-26-916 116.0 119.5 252 3.5 881

DZG-SF-26-916 138.0 139.0 79 1.0 79

DZG-SF-26-922 32.0 33.0 77 1.0 77

DZG-SF-26-922 37.0 42.0 229 5.0 1,144

DZG-SF-26-928 3.8 5.3 212 1.5 318

DZG-SF-26-933 75.0 76.0 759 1.0 759

DZG-SF-26-933 91.0 92.0 651 1.0 651

DZG-SF-26-943 1.0 1.8 93 0.8 74

DZG-SF-26-943 4.5 6.0 107 1.5 161

DZG-SF-26-943 7.5 9.0 106 1.5 159

DZG-SF-26-943 29.5 30.0 94 0.5 47

DZG-SF-26-943 34.5 36.0 874 1.5 1,311

DZG-SF-26-944 12.5 13.5 82 1.0 82

DZG-SF-26-944 42.3 43.5 141 1.2 169

DZG-SF-26-945 10.1 11.5 506 1.4 708

DZG-SF-26-945 16.0 19.5 3,501 3.5 12,254

Including 16.5 18.0 7,717 1.5 11,575

DZG-SF-26-945 21.0 22.5 101 1.5 152

DZG-SF-26-946 4.5 6.0 89 1.5 134

DZG-SF-26-946 81.5 83.0 290 1.5 435

DZG-SJ-CD-26-028 49.0 50.0 99 1.0 99

DZG-SJ-CD-26-028 51.0 52.0 123 1.0 123

Surface RC

ZG-RC-24-155 0.0 13.0 783 13.0 10,180

ZG-RC-24-250 72.0 73.0 680 1.0 680

ZG-RC-24-354 2.0 13.0 501 11.0 5,512

Including 6.0 7.0 4,000 1.0 4,000

ZG-RC-24-421 0.0 3.0 143 3.0 428

ZG-RC-25-412 50.0 51.0 824 1.0 824

ZG-RC-26-1046 17.0 19.0 102 2.0 203

ZG-RC-26-1054 24.0 25.0 150 1.0 150

Underground T28

T28-26-1310 14.4 16.8 682 2.4 1,636

T28-26-1311 7.2 9.6 100 2.4 239

T28-26-1312 21.6 24.0 97 2.4 233

T28-26-1324 0.0 3.6 174 3.6 628

T28-26-1325 0.0 9.6 302 9.6 2,903

T28-26-1332 10.8 13.2 537 2.4 1,289

T28-26-1332 16.8 18.0 116 1.2 139

T28-26-1333 9.6 18.0 1,362 8.4 11,437

Including 9.6 13.2 2,873 3.6 10,344

T28-26-1334 9.6 16.8 260 7.2 1,872

T28-26-1334 24.0 26.4 4,770 2.4 11,448

T28-26-1335 13.2 15.6 1,603 2.4 3,846

T28-26-1357 18.0 19.2 77 1.2 92

T28-26-1358 16.8 24.0 450 7.2 3,242

T28-26-1361 21.6 24.0 151 2.4 362

T28-26-1382 0.0 1.2 151 1.2 181

T28-26-1389 9.6 13.2 88 3.6 318

T28-26-1392 0.0 4.8 267 4.8 1,282

T28-26-1401 7.2 15.6 258 8.4 2,164

Including 7.2 10.8 483 3.6 1,739

T28-26-1402 2.4 4.8 111 2.4 265

T28-26-1403 7.2 10.8 109 3.6 391

T28-26-1404 7.2 19.2 762 12.0 9,149

T28-26-1405 19.2 21.6 87 2.4 208

T28-26-1406 10.8 13.2 193 2.4 462

T28-26-1407 9.6 12.0 193 2.4 463

T28-26-1410 4.8 6.0 80 1.2 96

T28-26-1411 7.2 9.6 252 2.4 605

T28-26-1411 10.8 12.0 90 1.2 108

T28-26-1412 3.6 9.6 168 6.0 1,008

T28-26-1413 9.6 10.8 85 1.2 102

T28-26-1414 0.0 4.8 295 4.8 1,414

T28-26-1415 0.0 3.6 133 3.6 479

T28-26-1415 9.6 10.8 116 1.2 139

T28-26-1415 14.4 16.8 314 2.4 754

T28-26-1418 18.0 19.2 155 1.2 186

T28-26-1419 4.8 6.0 77 1.2 92

T28-26-1419 8.4 9.6 117 1.2 140

T28-26-1419 13.2 14.4 132 1.2 158

T28-26-1419 15.6 20.4 159 4.8 763

T28-26-1419 25.2 26.4 216 1.2 259

T28-26-1420 3.6 26.4 297 22.8 6,775

Including 3.6 14.4 382 10.8 4,128

T28-26-1422 10.8 12.0 95 1.2 114

T28-26-1425 19.2 21.6 114 2.4 272

T28-26-1441 18.0 25.2 403 7.2 2,898

Including 21.6 25.2 695 3.6 2,501

T28-26-1442 0.0 1.2 553 1.2 664

T28-26-1442 21.6 24.0 163 2.4 390