Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Reports High-Grade Exploration Drill Results Near Pit Depth at Zgounder

Drill Results

Aya Gold & Silver Reports High-Grade Exploration

Drill Results Near Pit Depth at Zgounder

Montreal, Quebec, June 2, 2026 - Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) (“Aya” or the “Corporation”) is

pleased to announce high-grade silver drill results from its at-depth drill exploration program at the Zgounder Silver

Mine (“Zgounder”) in the Kingdom of Morocco.

Highlights (all intersections are in core lengths)

• Intersections in the Open-Pit Area:

• Hole ZG-RC-26-946 intercepted 1,867 grams per tonne (“g/t”) silver (“Ag”) over 6.0 metres (“m”), including

5,100 g/t Ag over 2.0m

• Hole ZG-RC-26-942 intercepted 739 g/t Ag over 10.0m, including 1,674 g/t Ag over 4.0m

• Hole ZG-RC-26-799 intercepted 1,160 g/t Ag over 6.0m, including 1,778 g/t Ag over 3.0m

• Hole ZG-RC-26-943 intercepted 886 g/t Ag over 5.0m

• Intersections Near the Western Fault contact:

• Hole YAK-26-502 intercepted 795 g/t Ag over 4.8m

• Hole T28-26-1152 intercepted 445 g/t Ag over 7.2m

• Intersections in the Central Area:

• Hole DZG-SF-26-740 intercepted 1,330 g/t Ag over 4.6m, including 3,680 g/t Ag over 1.2m

• Hole DZG-SF-26-741 intercepted 1,087 g/t Ag over 5.5m, including 3,347 g/t Ag over 1.5m

• Hole T28-26-1248 intercepted 2,176 g/t Ag over 8.4m, including 4,298 g/t Ag over 3.6m

• Hole T28-26-1177 intercepted 1,464 g/t Ag over 4.8m, including 5,480 g/t Ag over 1.2m

• 9,250m or 30.8% of the 2026 exploration program has been drilled year to date.

"Today’s high-grade results continue to confirm the strong continuity of silver mineralization both

around the open pit and within the central zone,” said Benoit La Salle, President & CEO. “Importantly, new

intersections near the Western Fault continue to support the significant exploration potential to the

west, where development of the exploration drift at the 1825-metre level is advancing ahead of planned

PRESS RELEASE

drilling west of the fault in the second half of the year. In parallel, drilling along the granite contact

continues to demonstrate encouraging high-grade continuity at depth."

This release contains results from 116 holes, which include 5 surface diamond drill holes (“DDH”), 28

underground DDH, 23 reverse circulation drill hole (“RC”), 33 T28 and 27 YAK holes (T28 and YAK:

percussion drilling using an air-compressed hammer). For a full summary of today’s results, refer to

Appendix 1.

Table 1 – Best Intercepts at Zgounder (core lengths)

Hole ID From To Ag Length* Ag x width

(g/t) (m)

Surface DDH

ZG-25-175 127.5 129 2,081 1.5 3,122

Underground DDH

DZG-SF-26-740 22.4 27 1,330 4.6 6,118

Including 24.8 26 3,680 1.2 4,416

DZG-SF-26-741 22.5 28 1,087 5.5 5,976

Including 25.5 27 3,347 1.5 5,020

DZG-SF-26-830 14.8 19 879 4.2 3,692

DZG-SF-26-877 33.7 38.5 505 4.8 2,422

DZG-SF-26-877 44.9 51 646 6.1 3,941

Surface RC

ZG-RC-26-799 6 12 1,160 6 6,962

Including 8 11 1,778 3 5,335

ZG-RC-26-942 129 139 739 10 7,388

Including 133 137 1,674 4 6,697

ZG-RC-26-942 148 150 1,409 2 2,818

ZG-RC-26-943 118 123 886 5 4,429

ZG-RC-26-946 96 102 1,867 6 11,200

Including 96 98 5,100 2 10,200

ZG-RC-26-955 94 103 288 9 2,593

ZG-RC-26-959 51 59 337 8 2,696

Underground T28

T28-26-1152 0 7.2 445 7.2 3,206

T28-26-1177 20.4 25.2 1,464 4.8 7,025

Including 21.6 22.8 5,480 1.2 6,576

T28-26-1181 14.4 20.4 500 6 2,998

Including 14.4 15.6 2,030 1.2 2,436

T28-26-1248 8.4 16.8 2,176 8.4 18,276

Including 8.4 12 4,298 3.6 15,474

T28-26-1249 16.8 26.4 542 9.6 5,201

T28-26-1250 0 4.8 519 4.8 2,491

Underground YAK

YAK-26-447 3.6 8.4 1,741 4.8 8,358

Including 3.6 6 3,365 2.4 8,076

YAK-26-454 40.8 45.6 835 4.8 4,006

YAK-26-463 0 4.8 939 4.8 4,508

YAK-26-502 4.8 9.6 795 4.8 3,815

True width remains undetermined; all values are uncut.

Figure 1: Location of Drill Results at Zgounder

Technical Information

For core drilling, all individual samples represent approximately one meter in length of core, which is

halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and

assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco or to ALS

Laboratory at the Zgounder Mine site. All samples are analyzed for silver, copper, iron, lead, and zinc using

Aqua regia and finished by atomic absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag

are reanalyzed by fire assay.

For definition drilling using RC, all individual samples represent 1.0m in length and for T28 drilling

equipment, all individual samples represent 1.2m in length. Samples are assayed at either the ALS Mine

laboratory or at Afrilab. All samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia

and finished by AAS. Samples grading above 200 g/t Ag are reanalyzed by fire assay. Rigorous quality

controls (QaQc) are applied at both locations.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David

Lalonde, B. Sc, P. Geo, Vice-President, Exploration, Qualified Person, for accuracy and compliance with

National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across

the full mining value chain. The Corporation has established an exploration track record through a

systematic, technology-led, data-driven approach and is focused on expanding its resource base and land

package along the Anti-Atlas fault — one of Africa’s most geologically rich, underexplored and mining-

friendly regions.

Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility.

Aya’s growth pipeline includes the Boumadine polymetallic project, where feasibility study work is

underway. The project hosts a sizable mineralized footprint, and potential for further discovery.

Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is

committed to delivering sustainable value for shareholders, employees and host communities.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press This press release contains “forward-looking statements” or “forward looking information”

within the meaning of applicable securities laws and other statements that are not historical facts.

Forward-looking statements are included to provide information about management’s current

expectations, estimates and projections regarding Aya’s future growth and business prospects (including

the timing and development of deposits and the success of exploration activities) and other opportunities

as of the date of this press release.

All statements, other than statements of historical fact included in this press release, regarding the

Corporation’s strategy, future operations, technical assessments, prospects, plans and objectives of

management are forward-looking statements that involve risks and uncertainties. Wherever possible,

words such as “continue”, “confirm”, “potential”, and similar expressions or statements that certain

actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be

achieved, have been used to identify such forward-looking information. Forward-looking statements in

this press release include, but are not limited to, statements with respect to: the Corporation's mining

assets development and expansion potential and objectives.

Forward-looking information is based upon certain assumptions and other important factors that, if

untrue, could cause the actual results, performance or achievements of the Corporation to be materially

different from future results, performance or achievements expressed or implied by such information or

statements. There can be no assurance that such information or statements will prove to be accurate.

Key assumptions upon which the Corporation’s forward-looking information is based include without

limitation, assumptions regarding development and exploration activities; the timing, extent, duration and

economic viability of such operations, including any mineral resources or reserves identified thereby; the

accuracy and reliability of estimates, projections, forecasts, studies and assessments; the timing for

completion of the updated Boumadine PEA and feasibility study; the Corporation’s ability to meet or

achieve estimates, projections and forecasts; the availability and cost of inputs; the price and market for

outputs; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits; the

ability to meet current and future obligations; the ability to obtain timely financing on reasonable terms

when required; the current and future social, economic and political conditions; and other assumptions

and factors generally associated with the mining industry.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may

have been used. Forward-looking statements are also subject to risks and uncertainties facing the

Corporation’s business, any of which could have a material adverse effect on the Corporation’s business,

financial condition, results of operations and growth prospects. Some of the risks the Corporation faces

and the uncertainties that could cause actual results to differ materially from those expressed in the

forward-looking statements include, among others: Aya’s ability to execute plans relating to its Zgounder

Project and Boumadine Project, including the timing thereof; risks and hazards associated with the

business of mineral exploration, development, and mining, including environmental hazards, potential

unintended releases of contaminants, industrial accidents, unusual or unexpected geological or structural

formations, pressures, cave-ins, and flooding; risks related to Aya’s operations in Morocco; the

speculative nature of mineral exploration and development; diminishing quantities or grades of mineral

reserves as properties are mined; the inability to determine, with certainty, the production of metals and

cost estimates, or the prices to be received before mineral reserves or mineral resources are actually

mined; inadequate or unreliable infrastructure (such as roads, bridges, power sources and water

supplies); fluctuations in forward markets for silver and other commodities (such as natural gas, fuel, oil

and electricity); availability of gas, fuel, and oil; restrictions on mining in the jurisdictions in which Aya

operates; change of laws and regulations governing our operation, exploration, and development

activities, including international laws and legal norms, such as those relating to Indigenous peoples and

human rights; the Corporation’s ability to mitigate the risks pertaining to fund repatriation; expectations

with respect to any future pandemics on our operations, and assumptions related thereto; Aya’s ability to

attract and retain qualified employees and contractors; Aya’s ability to obtain and renew necessary

permits and licenses; inherent risks associated with tailings facilities and heap leach operations, including

failure or leakages; Aya’s growth strategy; Aya’s ability to obtain and maintain insurance; occupational

health and safety risks; adverse publicity risks; third party risks; disruptions to Aya’s business operations;

Aya’s reliance on technology and information systems; litigation risks; interest and exchange rates risks;

tax risks; unforeseen expenses; public health crises; climate change; weather disruptions; general

economic conditions; commodity prices and exchange rate risks; gold and silver demand; volatility of

share price; public company obligations; competition risk; policies and legislation; force majeure; climate

risks; the effectiveness of our internal control over financial reporting; risks related to competition in the

mining industry; changes in technology; asset impairment (or reversal) potential, being consistent with the

Corporation’s current expectations; the inherent risks involved in exploration and development of mineral

properties; and other risks described in the Corporation’s documents filed with Canadian and U.S.

securities regulatory authorities.

In addition, readers are directed to carefully review the detailed risk discussion in the Corporation’s

Annual Information Form and Management’s Discussion & Analysis for the year ended December 31,

2025, filed on SEDAR+ and on EDGAR, which discussions are incorporated by reference in this press

release, for a fuller understanding of the risks and uncertainties that affect the Corporation’s business and

operations.

Although the Corporation believes its expectations are based upon reasonable assumptions and has

attempted to identify important factors that could cause actual actions, events or results to differ

materially from those described in forward-looking statements, there may be other factors that cause

actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that

forward-looking information will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such information. As such, these risks are not exhaustive; however,

they should be considered carefully. If any of these risks or uncertainties materialize, actual results may

vary materially from those anticipated in the forward-looking statements found herein. Due to the risks,

uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue

reliance on forward-looking statements.

Forward-looking statements contained herein are presented for the purpose of assisting investors in

understanding the Corporation’s business plans, financial performance and condition and may not be

appropriate for other purposes.

The forward-looking statements contained herein are made only as of the date hereof. The Corporation

disclaims any intention or obligation to update or revise any forward-looking statements, whether as a

result of new information, future events or otherwise, except to the extent required by applicable law. The

Corporation qualifies all of its forward-looking statements by these cautionary statements.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

Hole ID From To Ag Length* Ag x width

(g/t) (m)

Surface DDH

ZG-25-175 127.5 129.0 2,081 1.5 3,122

ZG-26-194 18.1 20.9 268 2.8 750

ZG-26-196 161.0 162.5 108 1.5 162

ZG-26-198 241.0 243.0 116 2.0 231

ZG-GT-21-04 57.5 62.0 111 4.5 501

ZG-GT-21-04 246.0 247.5 277 1.5 416

Underground DDH

ZG-SF-25-307 346.5 347.5 76 1.0 76

ZG-SF-25-307 350.5 357.0 141 6.5 918

ZG-SF-25-346 202.5 204.0 80 1.5 120

ZG-SF-25-346 207.0 208.5 1,304 1.5 1,956

ZG-SF-25-346 322.7 324.2 183 1.5 274

ZG-SF-26-352 97.0 98.0 162 1.0 162

ZG-SF-26-352 149.0 151.0 113 2.0 225

ZG-SF-26-355 143.5 145.0 98 1.5 147

DZG-SF-26-740 22.4 27.0 1,330 4.6 6,118

Including 24.8 26.0 3,680 1.2 4,416

DZG-SF-26-741 22.5 28.0 1,087 5.5 5,976

Including 25.5 27.0 3,347 1.5 5,020

DZG-SF-26-741 87.0 87.9 124 0.9 112

DZG-SF-26-830 14.8 19.0 879 4.2 3,692

DZG-SF-26-853 31.0 31.5 88 0.5 44

DZG-SF-26-855 1.5 2.5 176 1.0 176

DZG-SF-26-857 40.0 41.0 124 1.0 124

DZG-SF-26-857 49.0 50.0 108 1.0 108

DZG-SF-26-861 97.5 99.0 116 1.5 174

DZG-SF-26-862 73.6 75.1 204 1.5 306

DZG-SF-26-862A 126.0 127.0 152 1.0 152

DZG-SF-26-864 9.0 12.0 657 3.0 1,972

DZG-SF-26-864 16.5 18.0 148 1.5 222

DZG-SF-26-865 15.3 18.0 838 2.7 2,263

DZG-SF-26-865 31.0 32.5 360 1.5 540

DZG-SF-26-866 36.5 37.5 96 1.0 96

DZG-SF-26-866 47.8 48.8 176 1.0 176

DZG-SF-26-867 58.5 59.5 2,286 1.0 2,286

DZG-SF-26-868 39.7 41.4 842 1.7 1,431

DZG-SF-26-868 52.0 53.5 80 1.5 120

DZG-SF-26-868 57.7 59.2 681 1.5 1,022

DZG-SF-26-869 9.0 9.5 168 0.5 84

DZG-SF-26-874 66.0 67.0 200 1.0 200

DZG-SF-26-875 73.5 75.0 200 1.5 300

DZG-SF-26-876 27.0 28.5 196 1.5 294

DZG-SF-26-877 33.7 38.5 505 4.8 2,422

Including 33.7 34.7 2,136 1.0 2,136

DZG-SF-26-877 44.9 51.0 646 6.1 3,941

Including 44.9 45.9 2,196 1.0 2,196

DZG-SF-26-880 51.8 53.0 504 1.2 605

DZG-SF-26-881 44.0 45.0 148 1.0 148

DZG-SF-26-896 90.3 90.8 170 0.5 85

DZG-SF-26-896 106.5 109.5 163 3.0 489

DZG-SF-26-905 57.0 59.5 618 2.5 1,544

DZG-SF-26-915 61.0 64.0 281 3.0 842

Surface RC

ZG-RC-26-780 37.0 38.0 137 1.0 137

ZG-RC-26-799 6.0 12.0 1,160 6.0 6,962

Including 8.0 11.0 1,778 3.0 5,335

ZG-RC-26-868 18.0 19.0 98 1.0 98

ZG-RC-26-868 22.0 27.0 131 5.0 656

ZG-RC-26-868 36.0 37.0 193 1.0 193

ZG-RC-26-868 52.0 53.0 102 1.0 102

ZG-RC-26-904 22.0 24.0 167 2.0 334

ZG-RC-26-904 33.0 34.0 131 1.0 131

ZG-RC-26-904 42.0 43.0 77 1.0 77

ZG-RC-26-904 75.0 76.0 152 1.0 152

ZG-RC-26-904 87.0 88.0 93 1.0 93

ZG-RC-26-906 13.0 14.0 86 1.0 86

ZG-RC-26-906 26.0 27.0 82 1.0 82

ZG-RC-26-922 17.0 18.0 255 1.0 255

ZG-RC-26-925 16.0 18.0 142 2.0 283

ZG-RC-26-934A 73.0 74.0 79 1.0 79

ZG-RC-26-939 101.0 102.0 194 1.0 194

ZG-RC-26-940 123.0 129.0 139 6.0 833

ZG-RC-26-941 130.0 132.0 224 2.0 447

ZG-RC-26-942 129.0 139.0 739 10.0 7,388

Including 133.0 137.0 1,674 4.0 6,697

ZG-RC-26-942 148.0 150.0 1,409 2.0 2,818

ZG-RC-26-943 118.0 123.0 886 5.0 4,429

ZG-RC-26-943 133.0 134.0 1,100 1.0 1,100

ZG-RC-26-944 62.0 63.0 82 1.0 82

ZG-RC-26-944 121.0 122.0 806 1.0 806

ZG-RC-26-944 126.0 128.0 148 2.0 295

ZG-RC-26-945 87.0 90.0 243 3.0 729

ZG-RC-26-946 96.0 102.0 1,867 6.0 11,200

Including 96.0 98.0 5,100 2.0 10,200

ZG-RC-26-946 111.0 120.0 256 9.0 2,306