Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Reports High-Grade Drill Results from Completed 2023 Drill Exploration Program at Boumadine

Drill Results Exploration Programs

PRESS RELEASE

Aya Gold & Silver Reports High-Grade Drill Results from Completed 2023 Drill

Exploration Program at Boumadine

Montreal, Quebec, January 18, 2024 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the

“Corporation”) is pleased to announce new high-grade drill exploration results from its 2023 completed

program of 76,000 meters at Boumadine in the Kingdom of Morocco. The new results confirm the large,

high-grade mineralized zones in the southern and northern portions of the Main Trend, which remains

open in all directions.

Key Highlights1

• Definition of new high-grade mineralization from the infill drilling program:

o BOU-DD23-223 intersected 763 grams per tonne (“ g/t”) silver equivalent (“AgEq”) over

38.3 meters (“m”) (1.53 g/t Au, 311 g/t Ag, 4.4% Zn, 1.8% Pb and 0. 04% Cu), including

11.0m at 996 g/t AgEq

o BOU-DD23-230 intersected 991 g/t AgEq over 17.6m (2.64 g/t Au, 247 g/t Ag, 7.7% Zn,

1.2% Pb and 0.3% Cu), including 3.7m at 1,662 g/t AgEq

o BOU-DD23-248 intersected 1,136 g/t AgEq over 5.9m ( 5.94 g/t Au, 59 g/t Ag, 8.8% Zn,

1.0% Pb and 0.1% Cu)

o BOU-DD23-220 intersected 575 g/t AgEq over 10.9m ( 1.77 g/t Au, 91 g/t Ag, 4.5% Zn,

1.7% Pb and 0.1% Cu), including 2.4m at 1,275 g/t AgEq

o BOU-DD23-218 intersected 1,409 g/t AgEq over 4.2m (13.59 g/t Au, 115 g/t Ag, 0.1% Zn,

0.1% Pb and 0. 1% Cu) and 978 g/t AgEq over 5.8m ( 9.21 g/t Au, 80 g/t Ag, 0.1% Zn,

0.1% Pb and 0.2% Cu)

o BOU-DD23-251 intersected 531 g/t AgEq over 9.4m ( 2.66 g/t Au, 32 g/t Ag, 4.4% Zn,

0.2% Pb and 0.04% Cu), including 2.4m at 1,719 g/t AgEq

“Today’s high-grade drill results including BOU -DD23-223 in the south and BOU-DD23-218 in the north

of the Main Trend confirm continuity and grade of the Main Trend at Boumadine,” said Benoit La Salle,

President & CEO. “ Infill drilling has decreased the spacings between drill holes to improve our

confidence in grades and tonnages for the upcoming Q1-2024 mineral resource estimate , which will

provide visibility on Boumadine’s potential for near-term value creation.”

1 All intersections are in core lengths; Ag equivalent is based on a 100% recovery with the following ratios: 1g/t Au: 93.4 g/t Ag;

1% Cu: 130.4 g/t Ag; 1% Pb: 31.8 g/t Ag; 1% Zn: 54.1 g/t Ag

Table 1 – Significant Intercepts from Boumadine Drill Exploration Program (Core Lengths)

DDH No. Section Zone From

(m)

To

(m)

Au

(g/t)

Ag

(g/t)

Length*

(m)

Cu

(%)

Pb

(%)

Zn

(%)

Mo

(g/t)

Ag Eq**

(g/t)

BOU-DD23-208 6675N Main 129.9 139.4 1.60 35 9.5 0.2 0.1 0.4 35 231

Including 134.9 139.4 2.51 59 4.5 0.3 0.1 0.5 55 367

BOU-DD23-211 9150N Main 6.0 9.8 2.01 99 3.8 0.0 4.3 0.0 17 426

BOU-DD23-214 8850N Main 214.0 223.0 4.77 61 9.0 0.1 0.1 0.2 5 535

Including 216.2 221.5 6.61 90 5.3 0.2 0.1 0.3 6 749

BOU-DD23-218 8850N Para 244.3 247.5 14.72 19 3.2 0.0 0.2 0.1 4 1,411

BOU-DD23-218 8850N Para 252.6 256.8 13.59 115 4.2 0.1 0.1 0.1 3 1,409

BOU-DD23-218 8850N Para 261.2 275.1 1.22 30 13.9 0.0 0.0 0.1 5 153

Including 272.3 274.0 5.89 119 1.7 0.2 0.1 0.1 13 698

BOU-DD23-218 8850N Main 280.3 286.1 9.21 80 5.8 0.2 0.1 0.1 8 978

Including 280.3 284.3 13.05 108 4.0 0.3 0.1 0.2 8 1,377

BOU-DD23-218 8850N Para 290.0 302.0 1.98 58 12.0 0.1 0.1 0.2 8 265

Including 292.1 297.4 3.50 107 5.3 0.1 0.1 0.1 11 459

BOU-DD23-218 8850N Para 333.1 334.3 0.03 1026 1.2 0.0 0.0 0.0 1 1,031

BOU-DD23-220 6575N Main 105.0 115.9 1.77 91 10.9 0.1 1.7 4.5 133 575

Including 112.3 114.7 6.26 261 2.4 0.3 1.2 6.6 16 1,275

BOU-DD23-220 6575N Para 133.4 136.8 0.89 76 3.4 0.3 2.5 7.0 7 649

BOU-DD23-221 6575N Main 225.5 239.0 1.07 12 13.5 0.0 0.2 0.3 4 136

BOU-DD23-223 6525N Main 131.6 169.9 1.53 311 38.3 0.0 1.8 4.4 101 763

Including 144.9 155.9 2.34 494 11.0 0.1 1.9 3.9 36 996

BOU-DD23-223 6525N Para 239.5 247.0 0.46 94 7.5 0.0 0.2 0.7 35 192

BOU-DD23-225 9325N Para 47.4 53.7 1.44 54 6.3 0.0 0.9 5.3 12 508

Including 50.8 53.7 2.88 86 2.9 0.0 1.0 9.9 21 927

BOU-DD23-225 9325N Main 73.2 77.4 2.70 21 4.2 0.1 0.3 3.2 16 465

Including 75.2 77.4 4.72 31 2.2 0.1 0.3 4.5 16 738

BOU-DD23-226 9325N Main 182.8 186.7 1.26 35 3.9 0.1 1.5 4.7 8 466

Including 184.5 185.7 3.33 53 1.2 0.1 1.8 9.5 14 951

BOU-DD23-226 9325N Para 197.0 198.1 7.73 47 1.1 0.3 0.5 0.5 8 852

BOU-DD23-227 9325N Main 259.7 268.3 3.34 18 8.6 0.1 0.1 0.5 6 369

Including 263.5 268.3 5.42 21 4.8 0.1 0.1 0.1 7 545

BOU-DD23-228 6300N Main 267.2 276.1 1.99 81 8.9 0.0 1.0 3.4 59 488

Including 267.7 273.0 3.09 119 5.3 0.0 1.5 4.7 87 715

BOU-DD23-229 6525N Para 111.9 116.0 1.60 175 4.1 0.1 1.9 7.3 259 810

BOU-DD23-230 6575N Main 166.6 184.2 2.64 247 17.6 0.3 1.2 7.7 86 991

Including 177.6 181.3 2.91 651 3.7 0.1 3.2 11.5 106 1,662

BOU-DD23-230 6575N Para 188.2 202.3 2.78 97 14.1 0.2 0.4 6.5 31 755

BOU-DD23-231 5375N Main 582.0 585.7 0.96 110 3.7 0.0 0.6 2.4 339 371

BOU-DD23-232 7825N Main 426.4 431.8 3.91 18 5.4 0.1 0.1 0.1 2 402

Including 426.4 427.7 10.72 49 1.3 0.2 0.1 0.2 2 1,092

BOU-DD23-234 6575N Main 310.6 317.3 1.40 19 6.7 0.1 0.3 4.5 1 407

Including 315.0 316.3 4.78 41 1.3 0.2 0.4 18.4 2 1,518

BOU-DD23-238 7825N Para 216.0 217.8 1.59 47 1.8 0.1 3.7 3.5 10 517

BOU-DD23-244 6450N Para 64.0 70.4 1.06 49 6.4 0.0 0.7 2.0 131 287

BOU-DD23-244 6450N Para 112.8 120.6 0.71 62 7.8 0.0 0.2 1.3 196 216

BOU-DD23-244 6450N Para 134.6 145.4 0.41 41 10.8 0.0 0.8 1.2 361 190

BOU-DD23-244 6450N Main 148.5 155.1 0.52 56 6.6 0.0 0.9 2.6 298 295

Including 150.5 152.1 1.19 187 1.6 0.0 2.5 9.0 946 925

BOU-DD23-245 6450N Para 106.0 111.0 0.05 17 5.0 1.5 0.4 1.5 70 312

BOU-DD23-245 6450N Main 198.4 206.5 0.73 122 8.1 0.0 2.3 4.7 68 524

Including 198.4 200.2 1.83 299 1.8 0.1 4.8 13.1 269 1,355

BOU-DD23-245 6450N Para 217.5 226.5 0.86 6 9.0 0.0 0.3 0.3 2 112

BOU-DD23-248 6450N Main 329.5 335.4 5.94 59 5.9 0.1 1.0 8.8 23 1,136

BOU-DD23-249 5800N Main 598.7 601.8 4.19 48 3.1 0.1 0.1 2.5 12 587

BOU-DD23-249 5800N Para 693.1 695.5 2.18 57 2.4 0.0 0.7 7.3 10 680

BOU-DD23-250 5800N Para 236.7 239.7 3.34 1 3.0 0.0 0.0 0.0 5 316

BOU-DD23-250 5800N Main 377.7 384.0 1.44 49 6.3 0.1 0.1 0.5 12 225

BOU-DD23-250 5800N Para 448.8 455.5 1.02 25 6.7 0.1 0.1 0.4 12 155

BOU-DD23-251 6450N Main 345.9 355.3 2.66 32 9.4 0.0 0.2 4.4 14 531

Including 346.4 348.8 7.99 91 2.4 0.1 0.3 15.8 19 1,719

BOU-DD23-254 7650N Main 241.4 243.4 5.63 61 2.0 0.3 0.2 1.4 6 703

* True width remains undetermined at this stage; all values are uncut.

** Ag equivalent is based on a 100% recovery with the following ratio: 1 g/t Au: 93.4 g/t Ag; 1% Cu:130.4 Ag; 1% Pb: 31.8 Ag;

1% Zn: 54.1 Ag.

Figure 1 – Surface Plan of Boumadine Property with Magnetic Data (Residual Total Field) and 2023

Drill Holes

2023 Exploration Results

For 2023, 197 diamond drill holes (“ DDH”) for 74,295m were completed at Boumadine (Figure 1 and

Appendix 2) with the remaining meterage of the 76,000m were completed in the first week of January

2024. Infill drilling was conducted on strike along the Main Trend (South, Central, and North Zones) while

exploration drilling also targeted the North-West, Tizi and North-East Zones.

The majority of results have been received for drill holes up to BOU-DD23-255 (Table 1, Figure 3, Figure

4, and Appendix 1).

Results received since November 2023 confirm the high grade of the southern infill sections of the Main

Trend, notably with holes BOU-DD23-223 and BOU-DD23-230 intersecting large, mineralized zones.

The main mineralization generally consists of 1m to 4m wide (locally reaching over a 10m width) N340-

oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins

(>80%) are mainly composed of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite.

Figure 3 presents the results of the Boumadine Main Zone on a longitudinal section along the deposit,

defining ore shoots shallowly dipping toward south, in both the Central and South Zones.

Figure 2 – Longitudinal View of Boumadine Main Zone

Figure 3 – Surface Plan of Central & North Zones with New 2023 DDH Results

Figure 4 – Surface Plan of South Zones with New 2023 DDH Results

Next Steps

Following completion of the 2023 drilling program, the Corporation expects to publish an NI 43 -101

compliant resource by the end of Q1-2024.

The 2024 drill program is already underway, a portion of which will continue extending the strike-length

of the Boumadine Main Trend but with a primary focus on exploring targets outside of the Main Trend.

Final numbers will be announced later in Q1.

Fieldwork commenced on the new permits in 2024 with a hyperspectral survey, mapping and

prospecting. High resolution airborne geophysics (magnetics and MobileMT) is expected to begin later

in Q1.

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis

of drill core. Drill core samples were transported in sealed bags for analysis at Afrilab laboratory in

Marrakech. Standards of different grades and blanks were inserted every 20 samples in addition to the

standards, blanks and pulp duplicate inserted by Afrilab.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David

Lalonde, B. Sc , Head of Exploration, Qualified Person , for accuracy and compliance with National

Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospective South -Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moro ccan mining assets are complemented by its

Tijirit Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team maximizes shareholder value by anchoring sustainability at the heart of its

production, resource, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com or contact:

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of applicable securities laws (“forward -looking statements”), which reflects management's

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and other opportunities.

Wherever possible, words such as “confirm”, “remains”, “confidence”, “potential”, “complete”, “expect”

“extend”, “belief”, and similar expressions or statements that certain actions, events or results “may”,

“could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify

such forward-looking information. Specific forward -looking statements in this press release include,

but are not limited to, statements and information with respect to the exploration and development

potential of Boumadine and the advancement of and success of the exploration program at Boumadine

, and timing for the release of the Company's disclosure in connection with the foregoing. Although the

forward-looking information contained in this press release reflect management's current beliefs based

upon information currently available to management and based upon what management believes to be

reasonable assumptions, Aya cannot be certain that actual results will be consistent with such forward-

looking information. Such forward -looking statements are based upo n assumptions, opinions and

analysis made by management in light of its experience, current conditions, and its expectations of

future developments that management believe to be reasonable and relevant but that may prove to be

incorrect. These assumptions include, among other things, the ability to obtain any requisite

governmental approvals, the accuracy of Mineral Reserve and Mineral Resource Estimates (including,

but not limited to, ore tonnage and ore grade estimates), silver price, exchange rates, fuel and energy

costs, future economic conditions, anticipated future estimates of free cash flow, and courses of action.

Aya cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risks involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver and

other key inputs, changes in mine plans (including, bu t not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the control of Aya, as well as other risks and uncertainties which are more fully

described in Aya's 2022 Annual Information Form dated March 31, 2023, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR at www.sedarplus.ca. Furthermore,

Aya’s corporate update of May 28, 2020 regarding the materiality of its assets as well as to studies

regarding non-material assets remains applicable as at the date hereof. Aya does not undertake any

obligation to update forward-looking statements should assumptions related to these plans, estimates,

projections, beliefs, and opinions change. Nothing in this document should be construed as either an

offer to sell or a solicitation to buy or sell Aya securities. All referen ces to Aya include its subsidiaries

unless the context requires otherwise.