Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Reports High-Grade Drill Results at Boumadine, Extends Tizi Zone to 2.2km and Identifies New Regional Targets

Drill Results Exploration Programs

PRESS RELEASE

Aya Gold & Silver Reports High-Grade Drill Results at

Boumadine, Extends Tizi Zone to 2.2km and Identifies New

Regional Targets

Montreal, Quebec, April 8, 2024 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the

“Corporation”) is pleased to announce new high-grade drill exploration results from its 2024 - 2025

program at Boumadine in the Kingdom of Morocco. Today's results extend the Tizi mineralized trend by

200 meters, confirming high-grade continuity along the Boumadine Main Trend and revealing new

mineralized structures within the Boumadine regional permits.

Highlights1

• High-Grade Intercepts on the Boumadine Main Trend:

• BOU-DD24-440 intercepted 334 grams per tonne (“g/t”) silver equivalent (“AgEq”) over 16.8

meters (“m”) (1.39 g/t gold (“Au”), 98 g/t silver (“Ag”), 3.2% zinc (“Zn”), 1.8% lead (“Pb”) and

0.02% copper (“Cu”) including 4.1m at 476 g/t AgEq and 293 g/t AgEq over 17.8m

(0.55 g/t Au, 74 g/t Ag, 5.3% Zn, 1.5% Pb and 0.1% Cu) including 4.1m at 649 g/t AgEq

• BOU-DD24-450 intercepted 349 g/t AgEq over 10.6m (3.76 g/t Au, 35 g/t Ag, 0.1% Zn,

0.1% Pb and 0.2% Cu) including 6.6m at 512 g/t AgEq

• Silver Rich East-West Veins:

• BOU-DD24-392 intercepted 1,123 g/t Ag and 5.32% Pb over 1.7m

• BOU-MP24-015 intercepted 774 g/t Ag over 1.2m

• Extension of Tizi Strike Length to 2.2 Kilometers (“km”):

• BOU-MP24-010 intercepted 371 g/t AgEq over 1.0m (4.01 g/t Au, 20 g/t Ag, 0.9% Zn,

0.6% Pb and 0.03% Cu) and 208 g/t AgEq over 2.0m (0.91 g/t Au, 44 g/t Ag, 2.5% Zn,

1.0% Pb and 0.1% Cu)

• Identification of Several Regional Targets from Mapping and Grab Sampling:

• Identification of multiple new targets including five regional targets over 20 km of potential

strike, which will be tested in the coming months.

• Cu values from grab sample up to 34.5%

• Ag values from grabs up to 210 g/t

1. All intersections are in core lengths. Ag equivalent is based on a silver price of US$24/oz with a process recovery of 89%, a gold

price of US$2,200/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead pri ce of

US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the

following ratios: 1g/t Au: 77.9 g/t Ag; 1% Cu: 85.4 g/t Ag; 1% Pb: 24.2 g/t Ag; and 1% Zn: 24.6 g/t Ag.

"We are excited about today’s high-grade drill results, particularly BOU-DD24-440 and BOU-DD24-450,

which confirm the continuity of the Boumadine Main Zone. The northern extension of the Tizi Zone

further highlights the strong resource growth potential," said Benoit La Salle, President & CEO.

"Additionally, positive mapping and grab sampling results have identified several promising drill

targets to the south as well as to the east, reinforcing Boumadine’s exceptional district-scale potential.

We have identified over 20km of potential strike and look forward to advancing these targets in the

coming months."

Table 1 – Significant Intercepts from Boumadine Drill Exploration Program (Core Lengths)

DDH No. Section Zone From To Au Ag Length* Cu Pb Zn Mo Ag Eq**

(m) (m) (g/t) (g/t) (m) (%) (%) (%) (g/t) (g/t)

BOU-DD24-387 5000N Para 378.3 381.0 0.37 297 2.7 0.0 3.7 3.2 74 497

BOU-DD24-392 5000N East-West 465.0 466.7 1.50 1123 1.7 0.1 5.3 6.9 287 1551

BOU-DD24-399 6200N Para 195.0 196.0 19.24 4 1.0 0.0 0.0 0.0 10 1506

BOU-DD24-399 6200N Para 420.0 420.8 13.90 4 0.8 0.0 0.0 0.0 18 1092

BOU-DD24-413 4800N Para 190.4 191.4 16.72 1 1.0 0.0 0.0 0.0 2 1305

BOU-DD24-413 4800N Para 326.6 327.4 0.03 44 0.8 0.0 11.1 5.1 8 444

BOU-DD24-435 3478300N Tizi 325.3 326.7 1.48 58 1.4 0.2 2.0 1.6 2 274

BOU-DD24-436 6400N Main 66.6 73.4 1.21 89 6.8 0.0 0.5 1.3 54 230

BOU-DD24-436 6400N Para 80.0 80.6 0.27 162 0.6 0.0 5.3 9.2 86 544

BOU-DD24-436 6400N Para 92.0 101.3 0.51 50 9.3 0.1 1.7 4.4 78 252

Including 98.4 100.3 1.16 70 1.9 0.1 1.9 4.8 23 330

BOU-DD24-437 6400N Main 91.3 100.0 0.52 87 8.7 0.0 2.0 3.7 342 276

BOU-DD24-440 6400N Para 135.3 152.1 1.39 98 16.8 0.0 1.8 3.2 246 334

Including 148.0 152.1 2.93 157 4.1 0.0 0.8 2.6 235 476

BOU-DD24-440 6400N Main 163.6 181.4 0.55 74 17.8 0.1 1.5 5.3 177 293

Including 172.3 176.4 1.31 175 4.1 0.1 3.8 10.9 91 649

BOU-DD24-443 6400N Main 223.0 226.0 1.57 98 3.0 0.0 0.3 1.3 295 269

Including 223.9 225.0 3.57 204 1.1 0.1 0.3 3.0 252 574

BOU-DD24-447 7025N Main 51.0 54.0 2.64 13 3.0 0.0 0.1 0.4 7 232

BOU-DD24-450 7025N Para 86.4 89.0 3.18 53 2.6 0.2 0.5 0.8 11 350

BOU-DD24-450 7025N Main 94.8 105.4 3.76 35 10.6 0.2 0.1 0.1 5 349

Including 94.8 101.4 5.57 51 6.6 0.3 0.1 0.1 6 512

BOU-DD24-450 7025N Para 163.3 172.4 1.43 48 9.1 0.1 0.7 1.4 2 218

Including 163.3 168.1 2.38 41 4.8 0.1 0.6 1.2 2 283

BOU-DD24-452 7025N Para 103.8 105.2 2.40 44 1.4 0.2 0.4 0.3 6 269

BOU-DD24-465 9050N Main 97.8 100.0 1.11 36 2.2 0.0 0.3 5.7 19 274

BOU-MP24-010 3478300N Tizi 111.0 112.0 4.01 20 1.0 0.0 0.6 0.9 5 371

BOU-MP24-010 3478300N Tizi 194.0 196.0 0.91 44 2.0 0.1 1.0 2.5 5 208

BOU-MP24-012 3478300N Tizi 86.0 87.0 3.86 16 1.0 0.1 0.1 0.5 8 335

BOU-MP24-014 3478300N Tizi 432.8 434.0 1.76 66 1.2 0.1 0.3 1.8 2 268

BOU-MP24-015 3478300N East-West 475.0 476.6 0.05 774 1.6 0.1 0.1 0.1 4 788

* True width remains undetermined at this stage; all values are uncut.

** Ag equivalent is based on a silver price of US$24/oz with a process recovery of 89%, a gold price of US$2,200/oz with a process

recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recover y of

85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 77.9 g/t Ag; 1% Cu:

85.4 g/t Ag; 1% Pb: 24.2 g/t Ag; and 1% Zn: 24.6 g/t Ag

Figure 1 - Boumadine Property Surface Plan with Apparent Conductivity at 175Hz and 2025 Drill

Holes

2025 Exploration Results

This year, 117 diamond drill holes (“DDH”) totaling 46,207m have been completed at Boumadine (Figure

1 and Appendix 2). Drilling was conducted on strike along the Main Trend (North Zones), Tizi and North-

East Zones as well as on some east-west structures. The majority of results have been received for drill

holes up to BOU-DD24-466 (Table 1, Figure 2, Figure 3, and Appendix 1).

Results received during the first quarter of 2025, including hole BOU -DD24-440 and BOU -DD24-450

confirm the high -grade continuity of the Main Trend , which remains open in all directions. Today’s

results, with BOU-MP24-010 and BOU-MP24-012, also confirm the continuity of the Tizi Zone and extend

Tizi mineralization to 2.2km. The Tizi Zone also remains open in all directions.

Hole BOU-DD24-92 returned high-grade silver results including 1,123 g/t Ag over 1.7m in an east-west

structure.

The main mineralization generally measures 1m to 4m wide (locally reaching over a 10m width) N340-

oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins

(>80%) are mainly composed of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite.

Tizi and Imariren share the same characteristics except for their N000 orientation.

Figures 4, 5 and 6 shows the advance of the regional mapping and prospecting. Many high-grade grab

sample results, principally in Cu, Ag and Pb, along with major fault corridor helped define five principal

target areas that will need to be drill tested in the coming months.

Figure 2 – Surface Plan of North & Tizi Zones with New DDH Results

Figure 3 – Surface Plan of South Zone with New DDH Results

Figure 4 – Surface Map of Boumadine Property with Simplified Geology and Ag Grab Samples

Figure 5 – Surface Map of Boumadine Property with Simplified Geology and Cu Grab Samples

Figure 6 – Surface Map of Boumadine Property with Simplified Geology and Pb Grab Samples

Next Steps

Significant upside potential exists to expand the Boumadine Main Trend, which currently extends 5.4km

and remains open in all directions. Currently, the Corporation has mobilized 11 drill rigs to complete the

100,000m to 140,000m drilling program. Half of the drilling will focus along the Main Trend and Tizi to

continue extending the known mineralization trend along strike and at depth and to infill known areas

advancing the project towards a preliminary economic assessment, which is targeted for 2026 . The

remaining 50% will focus on greenfield exploration designed to test geological hypotheses and drill

targets generated from the past three years of work. The results from ongoing geology work will

determine additional development work.

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis

of drill core. Drill core samples were transported in sealed bags for analysis at Afrilab laboratory in

Marrakech. Standards of different grades and blanks were inserted every 20 samples in addition to the

standards, blanks and pulp duplicate inserted by Afrilab.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David

Lalonde, B. Sc, Vice-President Exploration, Qualified Person, for accuracy and compliance with National

Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospective South -Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moro ccan mining assets are complemented by its

Tijirit Gold Project in Mauritania, which is being developed by Mx2 Mining, a new spinout gold -growth

company.

Aya’s management team maximizes shareholder value by anchoring sustainability at the heart of its

production, resource, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com or contact:

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of applicable securities laws (“forward -looking statements”), which reflects management's

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and other opportunities.

Wherever possible, words such as “confirm”, “targets”, “confirming”, “potential”, “promising”,

“advancing”, “expand”, “belief”, and similar expressions or statements that certain actions, events or

results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been

used to identify such forward -looking information. Specific forw ard-looking statements in this press

release include, but are not limited to, statements and information with respect to the exploration and

development potential of Boumadine and the advancement of and success of the exploration program

at Boumadine , and timing for the release of the Company's disclosure in connection with the foregoing.

Although the forward-looking information contained in this press release reflect management's current

beliefs based upon information currently available to management and based upon what management

believes to be reasonable assumptions, Aya cannot be certain that actual results will be consistent with

such forward -looking information. Such forward -looking statements are based upon assumptions,

opinions and analysis made by management in light of its experience, current conditions, and its

expectations of future developments that management believe to be reasonable and relevant but that

may prove to be incorrect. These assumptions include, among other things, the ability to obtain any

requisite governmental approvals, the accuracy of Mineral Reserve and Mineral Resource Estimates

(including, but not limited to, ore tonnage and ore grade estimates), silver price, exchange rates, fuel

and energy costs, future economic condition s, anticipated future estimates of free cash flow, and

courses of action. Aya cautions you not to place undue reliance upon any such forward -looking

statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risks involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver and

other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the control of Aya, as well as other risks and uncertainties which are more fully

described in Aya's 2023 Annual Information Form dated March 28, 2024, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR+ at www.sedarplus.ca. Furthermore,

Aya’s corporate update of May 28, 2020 regarding the materiality of its assets as well as to studies

regarding non-material assets remains applicable as at the date hereof. Aya does not undertake any

obligation to update forward-looking statements should assumptions related to these plans, estimates,

projections, beliefs, and opinions change. Nothing in this document should be construed as either an

offer to sell or a solicitation to buy or sell Aya securities. All referen ces to Aya include its subsidiaries

unless the context requires otherwise.