Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Extends High-Grade Silver Mineralization at Depth at Zgounder

Drill Results

PRESS RELEASE

.

Aya Gold & Silver Extends High-Grade Silver Mineralization at Depth at

Zgounder

Montreal, Quebec, February 28, 2023 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the

“Corporation”) is pleased to announce additional drill results, confirming the extension of high-grade

silver mineralization at the Zgounder Silver Mine in the Kingdom of Morocco.

Key Highlights (all intersections are in core lengths)

o Diamond drill hole DZG-SF-22-176 intercepted 4,980 grams per tonne (“g/t”) silver (“Ag”) over 7.5

meters (“m”), including 9,234 g/t Ag over 4.0m.

o At the central zone just below the 2,000m level confirming the high-grade zone from the December

21, 2022 update,

o hole TD28-22-2000-401 intercepted 2,035 g/t Ag over 10.8m including

▪ 3,502 g/t Ag over 6.0m

o hole TD28-22-2000-403 intercepted 1,081 g/t Ag over 13.2m including

▪ 5,275 g/t Ag over 2.4m

o At the central zone just above the 1,950m level,

o hole TD28-22-1950-416 intercepted 3,998 g/t Ag over 6.0m

o From surface in the central area , hole ZG-DCD-22-07 intersected 846 g/t Ag over 9.5m,

confirming high-grade mineralization at depth toward the contact with the granite.

o Launch of the deeper drilling campaign at Zgounder deposit with two rigs at surface and one rig

underground

“Today’s drilling results grow the mineralized footprint of the Zgounder deposit with intercepts such as

ZG-DCD-22-07 continuing to deliver high-grade intersections outside of the current resource envelope,”

said Benoit La Salle, President & CEO. “ We are encouraged by these results, which together with previous

surface intercepts ZG-DCD-22-06 and ZG-22-64, expand the down-plunge potential of the mineralized

system toward the granite.”

Included in this release are results for 92 holes, which include 3 surface diamond drill hole (“DDH”), 20

underground DDH, 38 T28 and 31 YAK (T28 & YAK: percussion drilling using an air-compressed hammer)

holes. For a full summary of today’s results, refer to Appendix 1.

Table 1 – Significant Intercepts from Drilling at Zgounder (core lengths)

DDH No. From To Ag Length

(m)*

Ag x

width (g/t)

Surface DDH

ZG-DCD-22-07 196.0 205.5 846 9.5 8,041

Underground DDH

DZG-SF-22-176 16.0 23.5 4980 7.5 37,348

including 16.5 20.5 9234 4.0 36,936

Underground T28

TD28-22-1950-413 7.2 16.8 776 9.6 7,445

TD28-22-1950-416 15.6 21.6 3998 6.0 23,986

TD28-22-1950-417 4.8 19.2 600 14.4 8,634

including 4.8 9.6 1551 4.8 7,444

TD28-22-2000-401 13.2 24.0 2035 10.8 21,976

including 14.4 20.4 3502 6.0 21,014

TD28-22-2000-403 13.2 26.4 1081 13.2 14,264

including 16.8 19.2 5275 2.4 12,659

TD28-22-2075-384 18.0 21.6 1961 3.6 7,061

Underground YACK

YAKD-22-1950-137 18.0 30.0 462 12.0 5,545

YAKD-22-1950-141 16.8 24.0 727 7.2 5,235

YAKD-22-1950-142 0.0 7.2 3061 7.2 22,036

YAKD-22-1950-142 26.4 50.4 479 24.0 11,491

YAKD-22-1950-144 37.2 50.4 1286 13.2 16,980

YAKD-22-1950-146 0.0 7.2 2630 7.2 18,935

including 4.8 6.0 14416 1.2 17,299

YAKD-22-1950-147 0.0 4.8 2343 4.8 11,245

YAKD-23-2030-160 44.4 50.4 884 6.0 5,302

1 Holes were drilled at various angles; true widths are not known at this time.

2 All assay results are above the cut-off grade of 75 g/t Ag.

Figure 1: Location of DDH Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one met er in length of core, which is

halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and

assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. All

samples are analyzed for s ilver, copper, iron, lead, and zinc using Aqua regia and finished by atomic

absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire assaying.

For definition drilling using T28 drilling equipment, all individual sample s represent 1.2m in length.

Samples are assayed at either the Zgounder Mine laboratory or at Afrilab. At Afrilab, all samples are

analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading

above 200 g/t Ag are reanalyzed using fire assaying. At ZMSM, all samples are analyzed for silver only

using Aqua regia and finished by AAS. Rigorous quality controls (QaQc) are applied at both locations.

David Lalonde, B.Sc. P. Geo, Head of Exploration, is Aya Gold & Silver’s Qualified Person and has reviewed

this press release for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospective South -Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moroccan mining assets are complemented by its Tijirit

Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team has been focused on maximising shareholder value by anchoring sustainability

at the heart of its operations, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of applicable securities laws (“forward -looking statements”), which reflects management ’s

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and ot her opportunities.

Wherever possible, words such as “confirm”, “de-risk”, “grow”, “expect”, “demonstrate”, “continuity”,

“potential”, “continue”, “expand”, “seems”, and similar expressions or statements that certain actions,

events or results “may”, “could”, “wou ld”, “might”, “will”, or are “likely” to be taken, occur or be achieved,

have been used to identify such forward-looking information. Specific forward-looking statements in this

press release include, but are not limited to, statements and information with respect to the exploration

and development potential of Zgounder, the conversion of Inferred Mineral Resources into Measured and

Indicated Mineral Resources and future opportunities for enhancing development at Zgounder. Although

the forward -looking information contained in this press release reflect management ’s current beliefs

based upon information currently available to management and based upon what management believes

to be reasonable assumptions, Aya cannot be certain that actual results will be consistent with such

forward-looking information. Such forwar d-looking statements are based upon assumptions, opinions

and analysis made by management in light of its experience, current conditions, and its expectations of

future developments that management believe to be reasonable and relevant but that may prove t o be

incorrect. These assumptions include, among other things, the ability to obtain any requisite

governmental approvals, the presence of artisanal miners, obtaining regulatory permits for on site work,

importing goods and machinery and employment permits, the accuracy of Mineral Reserve and Mineral

Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates), the price of

silver, the price of gold , exchange rates, fuel and energy costs, future economic conditions, anticipated

future estimates of free cash flow, and courses of action. Aya cautions you not to place undue reliance

upon any such forward-looking statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risk s involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver gold

and other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the control of Aya, as well as other risks and uncertainties which are more fully

described in Aya’s 2021 Annual Information Form dated June 16, 2022, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR at www.sedar.com. Aya does not

undertake any obligation to update forward -looking statements should assumptions related to these

plans, estimates, projections, beliefs, and opinions c hange. Nothing in this document should be

construed as either an offer to sell or a solicitation to buy or sell Aya securities. All references to Aya

include its subsidiaries unless the context requires otherwise.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

DDH No. From To Ag Length

(m)*

Ag x

width (g/t)

Surface DDH

ZG-22-68 226.5 228.5 1014 2.0 2,028

ZG-22-69 96.5 97.5 1104 1.0 1,104

ZG-22-69 100.5 104.0 183 3.5 640

ZG-DCD-22-07 196.0 205.5 846 9.5 8,041

ZG-DCD-22-07 250.5 253.5 301 3.0 903

ZG-DCD-22-07 270.5 276.0 384 5.5 2,114

Underground DDH

DZG-SF-22-123 3.0 4.0 76 1.0 76

DZG-SF-22-123 3.0 5.0 80 2.0 159

DZG-SF-22-125 31.5 36.0 229 4.5 1,032

DZG-SF-22-125 44.5 46.0 96 1.5 144

DZG-SF-22-125 49.0 53.5 325 4.5 1,461

DZG-SF-22-138 131.0 132.5 434 1.5 651

DZG-SF-22-138 137.0 138.5 144 1.5 216

DZG-SF-22-139 4.5 6.0 80 1.5 120

DZG-SF-22-139 7.5 9.0 143 1.5 214

DZG-SF-22-139 132.5 134.5 515 2.0 1,029

DZG-SF-22-141 3.5 4.5 732 1.0 732

DZG-SF-22-141 68.5 70.0 119 1.5 179

DZG-SF-22-141 77.5 80.5 258 3.0 773

DZG-SF-22-143 51.5 52.0 110 0.5 55

DZG-SF-22-143 54.0 55.5 126 1.5 189

DZG-SF-22-144 11.5 21.5 390 10.0 3,897

including 17.0 19.5 976 2.5 2,441

DZG-SF-22-144 64.0 68.5 2192 4.5 9,864

DZG-SF-22-145 17.5 20.0 483 2.5 1,207

DZG-SF-22-145 27.5 29.0 100 1.5 151

DZG-SF-22-145 64.5 74.0 393 9.5 3,734

including 64.5 67.0 978 2.5 2,444

DZG-SF-22-146 75.0 76.0 110 1.0 110

DZG-SF-22-147 37.5 39.0 92 1.5 137

DZG-SF-22-148 13.0 14.0 206 1.0 206

DZG-SF-22-148 20.5 22.5 407 2.0 814

DZG-SF-22-148 63.0 63.5 143 0.5 72

DZG-SF-22-149 18.0 19.0 1319 1.0 1,319

DZG-SF-22-149 21.0 22.0 83 1.0 83

DZG-SF-22-149 29.5 30.5 126 1.0 126

DZG-SF-22-149 55.0 56.5 104 1.5 156

DZG-SF-22-149 61.5 63.0 167 1.5 250

DZG-SF-22-151 128.0 129.5 266 1.5 398

DZG-SF-22-168 18.0 20.5 972 2.5 2,429

DZG-SF-22-173 17.0 17.5 122 0.5 61

DZG-SF-22-173 58.5 60.0 486 1.5 729

DZG-SF-22-173 87.0 88.5 230 1.5 345

DZG-SF-22-176 16.0 23.5 4980 7.5 37,348

including 16.5 20.5 9234 4.0 36,936

DZG-SF-22-176 53.0 54.5 271 1.5 406

DZG-SF-22-179 63.0 64.5 414 1.5 621

DZG-SF-22-183 0.5 5.5 964 5.0 4,819

including 3.0 4.5 2790 1.5 4,185

DZG-SF-22-184 12.0 13.5 718 1.5 1,077

DZG-SF-22-184 17.5 20.5 218 3.0 653

DZG-SF-22-184 29.5 30.0 346 0.5 173

DZG-SF-22-184 51.0 51.5 164 0.5 82

DZG-SF-22-184 66.0 66.5 564 0.5 282

DZG-SF-22-184 72.0 74.0 576 2.0 1,152

Underground T28

TD28-22-1950-409 13.2 18.0 385 4.8 1,846

TD28-22-1950-410 8.4 13.2 103 4.8 492

TD28-22-1950-412 1.2 2.4 87 1.2 104

TD28-22-1950-413 7.2 16.8 776 9.6 7,445

including 12.0 14.4 1906 2.4 4,574

TD28-22-1950-414 6.0 7.2 236 1.2 283

TD28-22-1950-414 10.8 12.0 90 1.2 108

TD28-22-1950-415 2.4 4.8 132 2.4 316

TD28-22-1950-416 2.4 3.6 1226 1.2 1,471

TD28-22-1950-416 15.6 21.6 3998 6.0 23,986

TD28-22-1950-417 4.8 19.2 600 14.4 8,634

including 4.8 9.6 1551 4.8 7,444

TD28-22-1950-424 18.0 19.2 475 1.2 570

TD28-22-1950-426 13.2 14.4 151 1.2 181

TD28-22-2000-398 9.6 13.2 493 3.6 1,774

TD28-22-2000-399 9.6 14.4 98 4.8 471

TD28-22-2000-401 2.4 3.6 80 1.2 96

TD28-22-2000-401 13.2 24.0 2035 10.8 21,976

including 14.4 20.4 3502 6.0 21,014

TD28-22-2000-403 13.2 26.4 1081 13.2 14,264

including 16.8 19.2 5275 2.4 12,659

TD28-22-2000-405 20.4 21.6 88 1.2 105

TD28-22-2000-406 20.4 26.4 295 6.0 1,772

TD28-22-2000-407 7.2 8.4 148 1.2 178

TD28-22-2000-408 9.6 18.0 220 8.4 1,850

TD28-22-2075-374 0.0 2.4 216 2.4 517

TD28-22-2075-384 18.0 21.6 1961 3.6 7,061

TD28-22-2075-428 7.2 8.4 242 1.2 290

TD28-22-2075-429 0.0 1.2 167 1.2 200

TD28-22-2075-431 9.6 12.0 180 2.4 431

TD28-22-2075-434 0.0 21.6 217 21.6 4,676

TD28-22-2075-435 8.4 9.6 143 1.2 171

TD28-22-2075-438 9.6 10.8 242 1.2 290

TD28-22-2075-444 19.2 25.2 107 6.0 640

TD28-22-2075-448 3.6 4.8 1249 1.2 1,499

TD28-22-2075-448 6.0 7.2 93 1.2 112

TD28-22-2075-448 16.8 19.2 137 2.4 328

TD28-22-2075-449 2.4 3.6 485 1.2 582

TD28-23-1975-458 0.0 1.2 655 1.2 785

TD28-23-1975-459 7.2 9.6 628 2.4 1,506

TD28-23-1975-459 20.4 22.8 101 2.4 242

TD28-23-1975-480 19.2 22.8 203 3.6 730

TD28-23-1975-481 0.0 10.8 256 10.8 2,770

TD28-23-2075-463 3.6 6.0 273 2.4 ,655

TD28-23-2075-465 22.8 24.0 107 1.2 128

TD28-23-2075-468 1.2 4.8 485 3.6 1,746

TD28-23-2075-469 0.0 3.6 275 3.6 989

TD28-23-2125-478 0.0 1.2 87 1.2 104

Underground YACK

YAKD-22-1950-102 32.4 34.8 216 2.4 519

YAKD-22-1950-102 48.0 50.4 344 2.4 826

YAKD-22-1950-104 38.4 40.8 340 2.4 816

YAKD-22-1950-108 0.0 2.4 157 2.4 376

YAKD-22-1950-108 26.4 27.6 175 1.2 210

YAKD-22-1950-109 0.0 2.4 170 2.4 409

YAKD-22-1950-111 14.4 15.6 240 1.2 287

YAKD-22-1950-114 22.8 24.0 108 1.2 130

YAKD-22-1950-114 28.8 30.0 102 1.2 123

YAKD-22-1950-116 10.8 13.2 464 2.4 1,114

YAKD-22-1950-120 13.2 14.4 134 1.2 161

YAKD-22-1950-130 6.0 7.2 90 1.2 108

YAKD-22-1950-132 19.2 24.0 136 4.8 651

YAKD-22-1950-133 25.2 26.4 93 1.2 112

YAKD-22-1950-133 46.8 48.0 170 1.2 204

YAKD-22-1950-135 18.0 19.2 1822 1.2 2,186

YAKD-22-1950-136 16.8 19.2 784 2.4 1,882

YAKD-22-1950-136 21.6 22.8 107 1.2 128

YAKD-22-1950-136 43.2 46.8 96 3.6 346

YAKD-22-1950-137 18.0 30.0 462 12.0 5,545

YAKD-22-1950-137 40.8 45.6 351 4.8 1,682

YAKD-22-1950-139 9.6 12.0 207 2.4 496

YAKD-22-1950-140 19.2 21.6 82 2.4 196

YAKD-22-1950-140 26.4 27.6 76 1.2 91

YAKD-22-1950-140 38.4 42.0 412 3.6 1,483

YAKD-22-1950-141 16.8 24.0 727 7.2 5,235

including 16.8 20.4 1361 3.6 4,898

YAKD-22-1950-141 25.2 26.4 112 1.2 134

YAKD-22-1950-142 0.0 7.2 3061 7.2 22,036

YAKD-22-1950-142 19.2 21.6 194 2.4 466

YAKD-22-1950-142 26.4 50.4 479 24.0 11,491

YAKD-22-1950-144 18.0 19.2 83 1.2 99

YAKD-22-1950-144 37.2 50.4 1286 13.2 16,980

YAKD-22-1950-146 0.0 7.2 2630 7.2 18,935

including 4.8 6.0 14416 1.2 17,299

YAKD-22-1950-146 25.2 28.8 263 3.6 947

YAKD-22-1950-147 0.0 4.8 2343 4.8 11,245

YAKD-22-1950-147 27.6 31.2 159 3.6 571

YAKD-22-1950-147 50.4 51.6 593 1.2 711

YAKD-22-1950-148 0.0 4.8 377 4.8 1,808

YAKD-22-1950-148 26.4 27.6 177 1.2 212

YAKD-22-1950-148 42.0 43.2 84 1.2 101

YAKD-22-1950-148 51.6 54.0 1627 2.4 3,904

YAKD-23-1975-154 2.4 3.6 77 1.2 92