Aya Gold & Silver Drill Program Highlights High-Grade Continuity at Depth and

to the East at Zgounder

Montreal, Quebec, April 12, 2022 - Aya Gold & Silver Inc. (TSX: AYA ; OTC QX: AYASF) (“A ya” or the

“Corporation”) is pleased to report drill results from its drill exploration program at the Zgounder Silver

Mine in the Kingdom of Morocco

Key Highlights (all intersections are in core lengths)

o Increase of the production area below the 2,000 meter (“m”) and 1,975m levels including

o T28-21-1988-272, which intercepted 1, 039 grams per tonne (“g/t”) silver (“Ag”) over

26.4m;

o T28-21-R2-1988-664, which intercepted 1,492 g/t Ag over 4.8m; and

o T28-21-1988-275, which intercepted 1,564 g/t Ag over 3.6m and 315 g/t Ag over 1.2m

o Extension of the eastern strike by DZG-21-03, which intercepted 1,284 g/t Ag over 6m

o Continued definition at the 1,975m level including

o T28-21-1975-387, which intercepted 2,280 g/t Ag over 6m;

o T28-21-1975-381bis, which intercepted 742 g/t Ag over 15.6m; and

o T28-21-1975-286, which intercepted 716 g/t Ag over 9.6m

“We are very pleased with today’s results, which will contribute meaningfully to our next resource

estimate. Our infill drill program continues to have terrific success, extending both continuity and

thickness between the 2,000 and 1,975 meter levels. Highlight intercepts include hole T28-21-1988-272,

which defined significant silver mineralisation over 26 meters next to current mine workings. Additionally,

our step-out surface holes continue to intersect high-grade minerali zation, which is increasing the

resource envelope to the east,” said Benoit La Salle, President & CEO.

Included in this release are results for 76 underground diamond drill holes (“DDH”), which include 5

surface, 15 underground DDH and 56 T28 electric percussion holes. For a full summary of today’s results

from the 2021 drill programs, refer to Appendixes 1 and 2.

Table 1 – Significant Intercepts from Drilling at Zgounder (core lengths)

Hole No. From (m) To (m) Length1 (m) Ag2 (g/t)

Surface

DZG-21-03

39.00 41.50 3.50 309

51.00 55.00 6.00 1,284

including 0.50 4,736

including 0.50 6,080

DZG-21-11

18.50 21.50 3.00 80

24.50 26.00 1.50 88

47.00 49.50 2.50 1,863

including 0.50 7,040

including 0.50 2,000

57.50 59.00 1.50 1,584

DZG-21-13 127.50 128.50 1.00 1,608

Underground

T28-21-1975-330 10.80 12.00 1.20 2,097

T28-21-1988-275 3.60 7.20 3.60 1,564

18.00 19.20 1.20 315

T28-21-1988-272 0.00 26.40 26.40 1,039

including 1.20 3,137

including 1.20 3,316

including 1.20 3,369

including 1.20 3,239

including 1.20 1,937

including 1.20 2,169

including 1.20 2,094

T28-21-R2-1988-664 2.40 7.20 4.80 1,492

including 1.20 1,557

including 1.20 2,401

including 1.20 1,715

T28-21-R2-1988-664bis 1.20 6.00 4.80 933

including 1.20 2,170

T28-21-1975 -286 15.60 25.20 9.60 716

including 1.20 1,097

including 1.20 1,087

including 1.20 1,078

T28-21-1975-378bis 15.60 16.80 1.20 208

22.80 26.40 3.60 1,312

including 1.20 1,594

including 1.20 1,739

T28-21-1975-387 0.00 6.00 6.00 2,280

including 1.20 2,769

including 1.20 1,589

including 1.20 6,583

1 Holes were drilled at various angles; true widths are not known at this time.

2 All assay results are above the cut-off grade of 75 g/t Ag.

Figure 1: Location of DDH Results at Zgounder as per Appendixes 1 & 2

Quality Assurance

For core drilling, all individual samples represent approximately one metre in length of core, which is

halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and

assaying to African Laboratory for Min ing and Environment (“Afrilab”) in Marrakech, Morocco. All

samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by atomic

absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire assaying.

For definition drilling using T28 drilling equipment, all individual sample s represent 1.2m in length.

Samples are assayed at either the Zgounder Mine Laboratory (“ZMSM”) or at Afrilab. At Afrilab, all

samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS.

Samples grading above 200 g/t Ag are reanalyzed using fire assaying. At ZMSM, all samples are analyzed

for silver only using Aqua regia and finished by AAS. Rigorous quality controls (QaQc) are applied at both

locations.

Marc-Antoine Audet, Ph.D. P. Geo, Geological Consultant, is Aya Gold & Silver’s Qualified Person and has

reviewed this press release for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospec tive South-Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moroccan mining assets are complemented by its Tijirit

Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team has been focused on maximising shareholder value by anchoring sustainability

at the heart of its operations, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA FCA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of applicable securities laws (“forward -looking statements”), which reflects management ’s

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and other opportunities.

Wherever possible, words such as “confirm”, “demonstrate”, “continuity”, “potential”, “continue”, “expand”,

“seems”, and similar expressions or statements that certain actions, events or results “may”, “could”,

“would”, “might”, “will”, or are “likely” to be taken, occur o r be achieved, have been used to identify such

forward-looking information. Specific forward -looking statements in this press release include, but are

not limited to, statements and information with respect to the exploration and development potential of

Zgounder, the conversion of Inferred Mineral Resources into Measured and Indicated Mineral Resources

and future opportunities for enhancing development at Zgounder . Although the forward -looking

information contained in this press release reflect management's current beliefs based upon information

currently available to management and based upon what management believes to be reasonable

assumptions, Aya cannot be certain that actual results will be consistent with such forward -looking

information. Such forward-looking statements are based upon assumptions, opinions and analysis made

by management in light of its experience, current conditions, and its expectations of future developments

that management believe to be reasonable and relevant but that may prove t o be incorrect. These

assumptions include, among other things, the ability to obtain any requisite governmental approvals, the

presence of artisanal miners, obtaining regulatory permits for on site work, importing goods and

machinery and employment permits, the accuracy of Mineral Reserve and Mineral Resource Estimates

(including, but not limited to, ore tonnage and ore grade estimates), the price of silver, the price of gold ,

exchange rates, fuel and energy costs, future economic conditions, anticipated fu ture estimates of free

cash flow, and courses of action. Aya cautions you not to place undue reliance upon any such forward -

looking statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risk s involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver gold

and other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the control of Aya, as well as other risks and uncertainties which are more fully

described in Aya's 2021 Annual Information Form dated March 31, 2022, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR at www.sedar.com. Aya does not

undertake any obligation to update forward -looking statements should assumptions related to these

plans, estimates, projections, beliefs, and opinions change. Nothing in this document should be

construed as either an offer to sell or a solici tation to buy or sell Aya securities. All references to Aya

include its subsidiaries unless the context requires otherwise.

Appendix 1 - Mineral Intercepts from Surface Drilling at Zgounder (core lengths)

Hole No. From

(m)

To

(m)

Length1

(m)

Ag2

(g/t)

DZG-21-03 39.00 41.50 3.50 309

51.00 55.00 6.00 1,284

including 0.50 4,736

including 0.50 6,080

DZG-21-10 19.50 23.50 4.00 195

68.00 69.00 1.00 128

DZG-21-11 18.50 21.50 3.00 80

24.50 26.00 1.50 88

47.00 49.50 2.50 1,863

including 0.50 7,040

including 0.50 2,000

57.50 59.00 1.50 1,584

DZG-21-12 33.00 34.50 1.50 116

DZG-21-13 127.50 128.50 1.00 1,608

1 Holes were drilled at various angles, true widths are not known at this time.

2 All assay results are above the cut-off grade of 75 g/t Ag.

Appendix 2 - Mineral Intercepts from Underground Drilling at Zgounder (core lengths)

Hole No. From

(m)

To

(m)

Length1

(m)

Ag2

(g/t)

DZG-SF-22-16 6.00 7.00 1.00 156

14.50 15.00 0.50 256

19.50 22.50 3.00 210

DZG-SF-22-17 21.50 23.00 1.50 192

35.00 39.50 4.50 340

57.00 58.50 1.50 79

59.00 60.00 1.00 76

DZG-SF-22-18 3.50 9.50 6.00 173

DZG-SF-22-21 9.50 11.00 1.50 209

DZG-SF-22-23 10.00 11.00 1.00 80

DZG-SF-22-24 18.50 19.00 0.50 76

DZG-SF-22-26 7.00 10.00 3.00 96

18.00 19.50 1.50 81

22.50 25.50 3.00 136

DZG-SF-22-27 76.00 77.50 1.50 76

DZG-SF-22-29 17.00 20.50 3.50 85

30.50 31.10 0.60 76

DZG-SF-22-36 18.00 19.50 1.50 76

24.00 25.50 1.50 480

DZG-SF-22-38 33.50 34.00 0.50 248

55.00 56.00 1.00 77

DZG-SF-22-40 18.00 19.00 1.00 204

DZG-SF-22-42 68.50 69.50 1.00 230

DZG-SF-22-46 18.50 20.00 1.50 172

DZG-SF-22-47 7.50 9.00 1.50 100

T28 Drilling

T28-21-1975-330 10.80 12.00 1.20 2,097

T28-21-1975-333 0.00 2.40 2.40 104

7.20 12.00 4.80 408

T28-21-1975-330bis 4.80 6.00 1.20 229

10.80 12.00 1.20 85

T28-21-1975-333bis 0.00 3.60 3.60 564

7.20 12.00 4.80 247

T28-21-1975-336 0.00 1.20 1.20 89

3.60 4.80 1.20 80

7.20 8.40 1.20 97

T28-21-1975-335bis 9.60 15.60 6.00 837

20.40 26.40 6.00 128

T28-21-1975-342 0.00 3.60 3.60 569

19.20 22.80 3.60 288

T28-21-1975-342bis 1.20 3.60 2.40 192

T28-21-1975-337 18.00 21.60 3.60 123

T28-21-1975-337bis 9.60 12.00 2.40 931

T28-21-1975-340 21.60 22.80 1.20 234

T28-21-21975-364bis 14.40 15.60 1.20 128

T28-21-1975-372bis 2.40 3.60 1.20 404

T28-21-1975-372 4.80 6.00 1.20 164

14.40 15.60 1.20 84

T28-21-1988-376 0.00 3.60 3.60 148

T28-21-1975-382bis 6.00 7.20 1.20 192

T28-21-1975-366 12.00 15.60 3.60 208

25.20 26.40 1.20 320

T28-21-2000-363 9.60 10.80 1.20 136

T28-21-1975-379bis 12.00 13.20 1.20 87

T28-21-1988-275 3.60 7.20 3.60 1,564

18.00 19.20 1.20 315

T28-21-1988-275bis 3.60 6.00 2.40 485

T28-21-1975-277bis 24.00 25.20 1.20 168

T28-21-1988-272 0.00 26.40 26.40 1,039

including 1.20 3,137

including 1.20 3,316

including 1.20 3,369

including 1.20 3,239

including 1.20 1,937

including 1.20 2,169

including 1.20 2,094

T28-21-1988-273 2.40 3.60 1.20 241

9.60 10.80 1.20 317

T28-21-1988-273bis 9.60 10.80 1.20 289

T28-21-1988-274 0.00 3.60 3.60 169

T28-21-2000-302bis 0.00 7.20 7.20 454

T28-21-2000-303 0.00 2.40 2.40 89

10.80 12.00 1.20 78

T28-21-2000-303bis 0.00 2.40 2.40 95

T28-21-2125-431 4.80 6.00 1.20 720

T28-21-2125-444 8.40 9.60 1.20 190

T28-21-2125-447 20.40 25.20 4.80 277