Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Confirms Discovery of Parallel Zones and Extends High- Grade Mineralization at Boumadine

Drill Results

PRESS RELEASE

Aya Gold & Silver Confirms Discovery of Parallel Zones and Extends High-

Grade Mineralization at Boumadine

MONTREAL, Quebec, February 14, 2023 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or

the “Corporation”) is pleased to announce new high-grade exploration drill results, which confirm the

extension of mineralization by 20% south of the main mineralized trend and confirm the discovery of

several parallel structures at Boumadine, in the Kingdom of Morocco.

Key Highlights1

• Definition of new mineralization and extension of the South Zone. The main mineralized trend,

which now extends over 3.2 kilometres (“km”), is open at both ends along strike and at depth.

o BOU-DD22-080 intercepted 2,715 g/t silver equivalent (“AgEq”) over 1.40m (2.86 g/t Au,

1,717 g/t Ag, 9.6% Zn, 3.5% Pb and 0.7% Cu)

o BOU-DD22-041 intercepted 609 g/t AgEq over 3.6m (4.02 g/t Au, 101 g/t Ag, 0.5% Zn,

2.5% Pb and 0.2% Cu) and 664 g/t AgEq over 1.70m (5.08 g/t Au, 106 g/t Ag, 0.8% Zn,

0.5% Pb and 0.2% Cu)

o BOU-DD22-053 intercepted 736 g/t AgEq over 2.2m (6.24 g/t Au, 41 g/t Ag, 1.4% Zn,

1.0% Pb and 0.02% Cu)

o BOU-DD22-050 intercepted 276 g/t AgEq over 9.5m ( 1.11 g/t Au, 94 g/t Ag, 1.0% Zn,

0.4% Pb and 0.1% Cu) including 3.9m at 431 g/t AgEq

o BOU-DD22-077 intercepted 385 grams per tonne (“g/t”) AgEq over 6.6 metres (“m”)

(3.22 g/t Au, 26 g/t Ag, 0.7% Zn, 0.5% Pb and 0.03% Cu) including 1.2m at 1,037 g/t AgEq

• 18,335m of drilling completed as of December 31, 2022, for a total of 86 diamond drill holes

(“DDH”)

• Extension of the main mineralized trend to the south, extending mineralization to over 3.2 km of

strike length, and remaining open in all directions

• Confirmation of a satellite mineralization body at Tizi , and discovery of new parallel structures

along the main trend

• Currently, three rigs are drilling at Boumadine as part of the 36,000m program planned for 2023

1 All intersections are in core lengths; Ag equivalent is based on a 100% recovery with the following ratios calculated with

September 7, 2022, prices: 1g/t Au: 93.4 g/t Ag; 1% Cu: 130.4 g/t Ag; 1% Pb: 31.8 g/t Ag; 1% Zn: 54.1 g/t Ag

“We are excited with these drill results at Boumadine, which extend mineralization by 20% to over 3.2

kilometres and confirm the existence of parallel zones that significantly increase the potential to add

high-grade ounces,” said Benoit La Salle, President & CEO. “The 2023 drill exploration program has

nearly doubled in size over last year’s program , with the objective of extending the main mineralized

trend to the south and delineating the known mineralization to deliver a resource statement over the

next 12 months.”

Table 1 – Significant Intercepts from 2022 Boumadine Drill Exploration Program (core lengths)

DDH No. Section From

(m)

To

(m)

Au

(g/t)

Ag

(g/t)

Length*

(m)

Cu

(%)

Pb

(%)

Zn

(%)

Mo

(g/t)

Ag Eq**

(g/t)

BOU-DD22-040 Central North 66.0 68.0 3.77 88 2.0 0.0 1.7 10.1 30 1,045

BOU-DD22-040 Central North 185.2 185.9 6.58 361 0.7 0.9 0.7 1.0 7 1,172

BOU-DD22-041 Central North 208.7 212.3 4.02 101 3.6 0.2 2.5 0.5 2 609

BOU-DD22-041 Central North 224.2 225.9 5.08 106 1.7 0.2 0.5 0.8 5 664

BOU-DD22-045 North 62.7 65.7 0.92 111 3.0 0.0 0.1 0.4 13 226

BOU-DD22-047 North 176.0 177.1 1.61 350 1.1 0.3 2.5 1.3 3 689

BOU-DD22-049 North 38.5 41.7 0.54 117 3.2 0.0 0.4 0.2 9 192

BOU-DD22-050 North 104.5 114.0 1.11 94 9.5 0.1 0.4 1.0 10 276

Including 105.6 109.5 2.16 191 3.9 0.1 0.2 0.3 10 431

BOU-DD22-053 Tizi North 51.8 54.0 6.24 41 2.2 0.0 1.0 1.4 3 736

Including 51.8 52.4 19.99 67 0.6 0.0 1.7 2.2 4 2,115

BOU-DD22-054 Tizi North 52.8 56.1 0.43 67 3.3 0.0 0.5 1.2 3 188

BOU-DD22-062 North 154.5 155.8 2.45 39 1.3 0.1 0.6 0.6 21 329

BOU-DD22-077 South 5 521.0 527.6 3.22 26 6.6 0.0 0.5 0.7 17 385

Including 523.4 524.6 8.73 62 1.2 0.0 0.6 2.5 44 1,037

BOU-DD22-078 Central 1 304.6 310.3 0.83 29 5.7 0.0 0.9 1.7 9 231

Including 304.6 306.5 1.29 62 1.9 0.1 2.3 4.3 8 499

BOU-DD22-080 Central-South 202.9 210.0 0.85 420 7.1 0.2 0.8 2.9 105 707

Including 208.6 210.0 2.86 1717 1.4 0.7 3.5 9.6 28 2,715

BOU-DD22-082 Central-South 322.9 324.6 1.62 36 1.7 0.1 0.7 0.8 7 261

BOU-DD22-083 Central-South 159.6 169.6 0.58 21 10.0 0.0 0.5 0.8 12 142

* True width remains undetermined at this stage; all values are uncut.

** Ag equivalent is based on a 100% recovery with the following ratio: 1 g/t Au: 93.4 g/t Ag; 1% Cu:130.4 Ag; 1% Pb: 31.8 Ag;

1% Zn: 54.1 Ag.

Figure 1 – Surface Plan of Boumadine Property with Magnetic Data (Residual Total Field) and 2022

Drill Holes

2022 Exploration Results and 2023 Drilling Programs

The 2022 drill exploration program at Boumadine completed 86 DDH for a total of 18,335m (Appendix

2). The drilling was completed on five targets: Central, South, Imariren, Tizi and the Southwest Zones

(Figure 1).

All of the 2022 drilling results have been received except for hole BOU-DD22-086 (Table 1 and Appendix

1). Figures 5 to 8 present each of the sections drilled along the main trend , its significant results, and

geological interpretation.

Results from the second phase of drilling along the main trend, both north (BOU-DD22-041and BOU-

DD22-050) and south (BOU-DD22-077), extend the known mineralization to over 3.2 km strike length

which remains open in all direction s. Drilling to date also confirms discovery of parallel structures as

shown by significant intersects, including BOU-DD22-078 and BOU -DD22-083. A mineralized satellite

zone was also confirmed at Tizi.

The mineralization consists generally of 1m to 4m widths (locally reaching over 10m width) N340-

oriented massive sulfide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins

(>80%) are composed mainly of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite.

In 2023, Aya intends to complete a 36,000m drill program , of which 21,000m will be allocated to

delineation drilling along the main trend with the aim of building a resource (Figure 2). The remaining

15,000m will target new zones as well as extensions of the main trend along strike and at depth. The

new 3D interpretation and model of the VTEM survey (Figure 3) will allow the Corporation to clearly

follow the conductive anomaly , in addition to directly help ing the exploration and the delineation

programs.

Figure 2 – Surface Plan of Boumadine Property with VTEM Data (Slice 75m), 2022 Drill Holes and

Planned Drill Holes for 2023 Drill Program

Figure 3 – Interpreted 3D Conductor (Main Trend) from VTEM Data

Figure 4 – Section North of Boumadine’s Main Trend with BOU-DD22-049 and BOU-DD22-050

Figure 5 – Section Central-North of Boumadine’s Main Trend with BOU-DD22-040 and BOU-DD22-041

Figure 6 – Section Central-South of Boumadine’s Main Trend with BOU-DD22-080 and BOU-DD22-082

Figure 7 – Section South 5 of Boumadine’s Main Trend with BOU-DD22-077

Next Steps

The 36,000m drilling program is expected to be completed by mid 2023. The relogging and resampling

of historic drill hole s is ongoing for expected completion this year. Aya expects to use both data in

estimating an NI 43-101-compliant resource update within the next 12 months . In addition, detail ed

surface mapping of the area is ongoing and is expected to be completed in the first half of this year.

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis

of drill core. Drill core samples were transported in sealed bags for analysis at Afrilab laboratory in

Marrakech. Standards of different grades and blanks were inserted every 20 samples in addition to the

standards, blanks and pulp duplicate inserted by Afrilab.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David

Lalonde, B. Sc , Head of Exploration, Qualified Person , for accuracy and compliance with National

Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospective South -Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moroccan mining assets are complemented by its

Tijirit Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team maximizes shareholder value by anchoring sustainability at the heart of its

production, resource, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com or contact:

Benoit La Salle, FCPA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of app licable securities laws (“forward -looking statements”), which reflects management's

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and other opportunities.

Wherever possible, words such as “ promising”, “extend”, “confirm”, “belief”, “potential”, “confident”,

“could”, “opportunity”, “support”, “suggest”, “expected”, “probably”, and similar expressions or

statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to

be taken, occur or be achieved, have been used to identify such forward -looking information. Specific

forward-looking statements in this press release include, but are not limited to , statements and

information with respect to the exploration and development potential of Zgounder and the conversion

of Inferred Mineral Resources into Measured and Indicated Mineral Resources, future opportunities for

enhancing development at Zgounder, a nd timing for the release of the Company's disclosure in

connection with the foregoing. Although the forward-looking information contained in this press release

reflect management's current beliefs based upon information currently available to management a nd

based upon what management believes to be reasonable assumptions, Aya cannot be certain that

actual results will be consistent with such forward -looking information. Such forward -looking

statements are based upon assumptions, opinions and analysis made by management in light of its

experience, current conditions, and its expectations of future developments that management believe

to be reasonable and relevant but that may prove to be incorrect. These assumptions include, among

other things, the closing a nd timing of financing, the ability to obtain any requisite governmental

approvals, the accuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited

to, ore tonnage and ore grade estimates), silver price, exchange rates, fuel and energy costs, future

economic conditions, anticipated future estimates of free cash flow, and courses of action. Aya

cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risks involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver and

other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the control of Aya, as well as other risks and uncertainties which are more fully

described in Aya's 2021 Annual Information Form dated June 16, 2022, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR at www.sedar.com. Furthermore,

Aya’s corporate update of May 28, 2020 regarding the materiality of its assets as well as to studies

regarding non-material assets remains applicable as at the date hereof. Aya does not undertake any

obligation to update forward-looking statements should assumptions related to these plans, estimates,

projections, beliefs, and opinions change. Nothing in this document should be construed as either an

offer to sell or a solicitation to buy or sell Aya securities . All references to Aya include its subsidiaries

unless the context requires otherwise.