Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Announces High-Grade Silver Drill Results at Zgounder

Drill Results

PRESS RELEASE

.

Aya Gold & Silver Announces High-Grade Silver Drill Results at Zgounder

Montreal, Quebec, September 6, 2023 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the

“Corporation”) is pleased to announce additional drill results, confirming high-grade silver mineralization

at the Zgounder Silver Mine in the Kingdom of Morocco.

Key Highlights (all intersections are in core lengths)

o Diamond drill hole (“DDH”) DZG-SF-22-162 intercepted 1,242 grams per tonne (“g/t”) silver (“Ag”)

over 9.0 meters (“m”), including 2,052 g/t Ag over 5.0m.

o In the open-pit area to the East , reverse circulation (“RC”) drill hole ZG-RC-23-2230-212

intercepted 2,812 g/t Ag over 8m and ZG-RC-CT7-P63-23-63 intercepted 2,227 g/t Ag over 7.0m,

including 6,768 g/t Ag over 2.0m.

o In the Central Zone from the 1950m level

o hole TD28-23-1950-704 intercepted 1,893 g/t Ag over 12.0m, including

▪ 4,295 g/t Ag over 4.8m

o hole TD28-23-1950-699 intercepted 1,423 g/t Ag over 9.6m, including

▪ 3,474 g/t Ag over 3.6m

o hole TD28-23-1950-752 intercepted 858 g/t Ag over 12.0m, including

▪ 6,552 g/t Ag over 1.2m

o hole TD28-23-1950-765 intercepted 846 g/t Ag over 12.0m, including

▪ 2,238 g/t Ag over 3.6m

o From surface in the Western Zone, hole ZG-SF-23-010 intercepted 812 g/t Ag over 13.5m,

including 2,207 g/t Ag over 4.5m.

o In the Central Zone at the 2,100m level hole YAKD-23-2100-202 intercepted 1,005 g/t Ag over

30m including 2,354 g/t Ag over 12m.

“Today’s high-grade drill results including hole ZG-RC-23-2230-212 near the open-pit area to the East

continue to demonstrate continuity of mineralization from surface and at depth over the larger footprint

of the deposit ,” said Benoit La Salle, President & CEO. “We are also very encouraged by the YAKD-23-

2100-202 result through definition drilling and expect more significant intercepts in the coming months

as we accelerate underground drilling at Zgounder.”

Included in this release are results for 397 holes, which include five surface DDH, 13 underground DDH,

284 RC drill hole from pit definition drilling, 95 T28 and 26 YAK holes (T28 and YAK: percussion drilling

using an air-compressed hammer). For a full summary of today’s results, refer to Appendix 1.

Table 1 – Significant Intercepts from Drilling at Zgounder (core lengths)

HOLE ID From To Ag Length

(m)*

Ag x

width (g/t)

Surface DDH

ZG-SF-23-010 27.5 41.0 812 13.5 10965

Including 36.5 41.0 2207 4.5 9933

Underground DDH

DZG-SF-22-152 18.0 20.5 1608 2.5 4020

DZG-SF-22-162 49.5 58.5 1242 9.0 11179

Including 52.5 57.5 2052 5.0 10259

Surface RC

ZG-RC-23-2230-197 0.0 11.0 1087 11.0 11953

Including 5.0 8.0 3182 3.0 9545

ZG-RC-23-2230-207 4.0 15.0 486 11.0 5349

Including 10.0 15.0 845 5.0 4223

ZG-RC-23-2230-212 5.0 13.0 2812 8.0 22495

ZG-RC-23-2230-230 13.0 16.0 1912 3.0 5737

ZG-RC-23-2230-231 0.0 5.0 1341 5.0 6703

ZG-RC-23-2230-239 0.0 8.0 564 8.0 4514

ZG-RC-23-2240-122 21.0 34.0 436 13.0 5664

ZG-RC-23-2260-245 11.0 28.0 554 17.0 9425

Including 19.0 23.0 1866 4.0 7462

ZG-RC-CT1-P1-23-01 5.0 17.0 897 12.0 10758

ZG-RC-CT2-P10-23-10 34.0 39.0 843 5.0 4214

ZG-RC-CT3-P20-23-20 16.0 22.0 1819 6.0 10914

ZG-RC-CT4-P33-23-33 7.0 20.0 1009 13.0 13114

Including 13.0 16.0 3775 3.0 11326

ZG-RC-CT5-P41-23-41 13.0 27.0 407 14.0 5695

ZG-RC-CT6-P59-23-59 0.0 13.0 500 13.0 6497

ZG-RC-CT7-P63-23-63 8.0 15.0 2227 7.0 15588

Including 10.0 12.0 6768 2.0 13536

ZG-RC-CT7-P65-23-65 0.0 14.0 474 14.0 6639

ZG-RC-CT7-P66-23-66 20.0 24.0 1230 4.0 4922

Underground T28

TD28-23-1950-699 6.0 15.6 1423 9.6 13658

Including 7.2 10.8 3474 3.6 12505

TD28-23-1950-700 0.0 13.2 741 13.2 9787

Including 3.6 9.6 1369 6.0 8213

TD28-23-1950-704 13.2 25.2 1893 12.0 22718

Including 13.2 18.0 4295 4.8 20615

TD28-23-1950-752 9.6 21.6 858 12.0 10297

Including 10.8 12.0 6552 1.2 7862

TD28-23-1950-765 10.8 22.8 846 12.0 10147

Including 10.8 14.4 2238 3.6 8058

TD28-23-1950-766 15.6 22.8 1326 7.2 9550

Including 19.2 21.6 3204 2.4 7691

TD28-23-1975-636 10.8 20.4 684 9.6 6568

Underground YACK

YAKD-23-2100-189 2.4 10.8 1027 8.4 8623

Including 7.2 9.6 3176 2.4 7622

YAKD-23-2100-199 6.0 10.8 848 4.8 4072

YAKD-23-2100-202 6.0 36.0 1005 30.0 30151

Including 10.8 22.8 2354 12.0 28248

YAKD-23-2100-236 26.4 33.6 1464 7.2 10544

Including 26.4 30.0 2445 3.6 8803

YAKD-23-2100-238 31.2 43.2 1085 12.0 13025

Including 32.4 34.8 4136 2.4 9926

1 Holes were drilled at various angles; true widths are not known at this time.

2 All assay results are above the cut-off grade of 75 g/t Ag.

Figure 1: Location of Drill Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one met er in length of core, which is

halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and

assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. All

samples are analyzed for s ilver, copper, iron, lead, and zinc using Aqua regia and finished by atomic

absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire assaying.

For definition drilling using T28 drilling equipment, all individual sample s represent 1.2m in length.

Samples are assayed at either the Zgounder Mine laboratory or at Afrilab. At Afrilab, all samples are

analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading

above 200 g/t Ag are reanalyzed using fire assaying. At ZMSM, all samples are analyzed for silver only

using Aqua regia and finished by AAS. Rigorous quality controls (QaQc) are applied at both locations.

David Lalonde, B.Sc. P. Geo, Head of Exploration, is Aya Gold & Silver’s Qualified Person and has reviewed

this press release for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospective South -Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moroccan mining assets are complemented by its Tijirit

Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team has been focused on maximising shareholder value by anchoring sustainability

at the heart of its operations, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of applicable securities laws (“forward -looking statements”), which reflects management ’s

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of expl oration activities) and other opportunities.

Wherever possible, words such as “confirm”, “de-risk”, “expect”, “demonstrate”, “continuity”, “potential”,

“continue”, “expand”, “seems”, and similar expressions or statements that certain actions, events or

results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been

used to identify such forward -looking information. Specific forward -looking statements in this press

release include, but are not limited to, state ments and information with respect to the exploration and

development potential of Zgounder , the conversion of Inferred Mineral Resources into Measured and

Indicated Mineral Resources and future opportunities for enhancing development at Zgounder. Although

the forward -looking information contained in this press release reflect management ’s current beliefs

based upon information currently available to management and based upon what management believes

to be reasonable assumptions, Aya cannot be certain that actual results will be consistent with such

forward-looking information. Such forward -looking statements are based upon assumptions, opinions

and analysis made by management in light of its experience, current conditions, and its expectations of

future developments that management believe to be reasonable and relevant but that may prove to be

incorrect. These assumptions include, among other things, the ability to obtain any requisite

governmental approvals, the presence of artisanal miners, obtaining regulatory permits for on site work,

importing goods and machinery and employment permits, the accuracy of Mineral Reserve and Mineral

Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates), the price of

silver, the price of gol d, exchange rates, fuel and energy costs, future economic conditions, anticipated

future estimates of free cash flow, and courses of action. Aya cautions you not to place undue reliance

upon any such forward-looking statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risks involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver gold

and other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the contr ol of Aya, as well as other risks and uncertainties which are more fully

described in Aya’s 2022 Annual Information Form dated March 31, 2023, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR at www.sedar.com. Aya does not

undertake any obligation to update forward -looking statements should assumptions related to these

plans, estimates, projections, beliefs, and opinions change. Nothing in this document should be

construed as e ither an offer to sell or a solicitation to buy or sell Aya securities. All references to Aya

include its subsidiaries unless the context requires otherwise.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

HOLE ID From To Ag Length

(m)*

Ag x

width (g/t)

Surface DDH

ZG-SF-23-010 17.5 20.5 1148 3.0 3443

ZG-SF-23-010 27.5 41.0 812 13.5 10965

Including 36.5 41.0 2207 4.5 9933

ZG-SF-23-011 3.0 4.5 862 1.5 1293

Underground DDH

DZG-SF-22-152 18.0 20.5 1608 2.5 4020

DZG-SF-22-152 22.0 23.0 84 1.0 84

DZG-SF-22-152 30.0 30.5 1346 0.5 673

DZG-SF-22-152 57.0 58.0 443 1.0 443

DZG-SF-22-152 65.5 66.5 478 1.0 478

DZG-SF-22-160 20.5 21.5 718 1.0 718

DZG-SF-22-160 68.5 69.5 118 1.0 118

DZG-SF-22-161 25.5 27.0 1336 1.5 2004

DZG-SF-22-162 12.0 13.5 155 1.5 232

DZG-SF-22-162 16.0 17.0 202 1.0 202

DZG-SF-22-162 32.0 32.5 87 0.5 44

DZG-SF-22-162 33.0 33.5 154 0.5 77

DZG-SF-22-162 46.5 47.5 150 1.0 150

DZG-SF-22-162 49.5 58.5 1242 9.0 11179

Including 52.5 57.5 2052 5.0 10259

DZG-SF-22-162 72.5 74.0 79 1.5 119

DZG-SF-22-162 75.5 76.5 122 1.0 122

DZG-SF-22-162 79.0 80.5 80 1.5 120

DZG-SF-22-166 22.0 23.5 1584 1.5 2376

DZG-SF-22-166 44.5 46.0 94 1.5 141

DZG-SF-22-166 50.5 52.0 404 1.5 606

DZG-SF-23-190 10.0 11.0 158 1.0 158

DZG-SF-23-192 15.0 16.0 150 1.0 150

Underground T28

TD28-23-1950-692 3.6 4.8 92 1.2 110

TD28-23-1950-695 0.0 2.4 488 2.4 1171

TD28-23-1950-696 3.6 6.0 182 2.4 437

TD28-23-1950-699 6.0 15.6 1423 9.6 13658

Including 7.2 10.8 3474 3.6 12505

TD28-23-1950-700 0.0 13.2 741 13.2 9787

Including 3.6 9.6 1369 6.0 8213

TD28-23-1950-704 13.2 25.2 1893 12.0 22718

Including 13.2 18.0 4295 4.8 20615

TD28-23-1950-706 8.4 12.0 262 3.6 943

TD28-23-1950-706 14.4 15.6 76 1.2 91

TD28-23-1950-708 19.2 20.4 291 1.2 349

TD28-23-1950-708 22.8 24.0 117 1.2 140

TD28-23-1950-709 10.8 14.4 714 3.6 2572

TD28-23-1950-747 18.0 20.4 128 2.4 307

TD28-23-1950-749 16.8 18.0 101 1.2 121

TD28-23-1950-750 0.0 3.6 427 3.6 1537

TD28-23-1950-752 6.0 7.2 104 1.2 124

TD28-23-1950-752 9.6 21.6 858 12.0 10297

Including 10.8 12.0 6552 1.2 7862

TD28-23-1950-753 25.2 26.4 245 1.2 293

TD28-23-1950-764 18.0 21.6 110 3.6 395

TD28-23-1950-764 22.8 24.0 77 1.2 92

TD28-23-1950-765 10.8 22.8 846 12.0 10147

Including 10.8 14.4 2238 3.6 8058

TD28-23-1950-766 1.2 2.4 600 1.2 720

TD28-23-1950-766 15.6 22.8 1326 7.2 9550

Including 19.2 21.6 3204 2.4 7691

TD28-23-1975-634 9.6 10.8 335 1.2 402

TD28-23-1975-635 9.6 10.8 152 1.2 182

TD28-23-1975-636 10.8 20.4 684 9.6 6568

Including 15.6 16.8 3024 1.2 3629

TD28-23-1975-637 10.8 14.4 241 3.6 866

TD28-23-1975-637 20.4 21.6 94 1.2 113

TD28-23-1975-638 7.2 8.4 141 1.2 169

TD28-23-1975-638 14.4 16.8 115 2.4 276

TD28-23-1975-691 9.6 10.8 181 1.2 217

TD28-23-1975-691 15.6 18.0 143 2.4 342

TD28-23-1975-734 15.6 19.2 78 3.6 279

TD28-23-2000-626 0.0 1.2 82 1.2 98

TD28-23-2000-626 4.8 6.0 808 1.2 970

TD28-23-2000-627 19.2 20.4 162 1.2 194

TD28-23-2000-628 16.8 20.4 163 3.6 585

TD28-23-2030-612 9.6 10.8 84 1.2 101

TD28-23-2030-612 13.2 15.6 113 2.4 271

TD28-23-2030-614 2.4 3.6 83 1.2 99

TD28-23-2030-614 7.2 8.4 85 1.2 102

TD28-23-2030-615 6.0 7.2 111 1.2 134

TD28-23-2030-615 8.4 9.6 142 1.2 170

TD28-23-2030-615 13.2 16.8 143 3.6 515

TD28-23-2030-617 13.2 16.8 177 3.6 636

TD28-23-2030-618 13.2 14.4 80 1.2 96

TD28-23-2030-618 18.0 26.4 246 8.4 2064

TD28-23-2030-796 14.4 16.8 113 2.4 271

TD28-23-2100-647 0.0 1.2 77 1.2 92

TD28-23-2100-647 14.4 16.8 333 2.4 798

TD28-23-2100-652 19.2 20.4 91 1.2 109

TD28-23-2100-657 0.0 1.2 154 1.2 185

TD28-23-2100-657 2.4 3.6 97 1.2 116

Underground YACK

YAKD-23-2100-187 9.6 15.6 102 6.0 610

YAKD-23-2100-187 20.4 21.6 84 1.2 101

YAKD-23-2100-189 2.4 10.8 1027 8.4 8623

Including 7.2 9.6 3176 2.4 7622

YAKD-23-2100-189 20.4 21.6 856 1.2 1027

YAKD-23-2100-192 4.8 10.8 233 6.0 1397

YAKD-23-2100-196 9.6 13.2 269 3.6 970

YAKD-23-2100-198 12.0 13.2 124 1.2 149

YAKD-23-2100-198 38.4 39.6 182 1.2 218

YAKD-23-2100-199 6.0 10.8 848 4.8 4072

Including 7.2 9.6 1453 2.4 3487

YAKD-23-2100-200 8.4 15.6 211 7.2 1522

YAKD-23-2100-200 33.6 36.0 105 2.4 252

YAKD-23-2100-201 36.0 38.4 505 2.4 1212

YAKD-23-2100-202 6.0 36.0 1005 30.0 30151

Including 10.8 22.8 2354 12.0 28248

YAKD-23-2100-203 7.2 13.2 232 6.0 1394

YAKD-23-2100-203 31.2 36.0 101 4.8 485

YAKD-23-2100-234 9.6 15.6 154 6.0 926

YAKD-23-2100-234 21.6 31.2 236 9.6 2269

YAKD-23-2100-234 37.2 38.4 77 1.2 92

YAKD-23-2100-235 12.0 14.4 101 2.4 241

YAKD-23-2100-235 22.8 24.0 153 1.2 184

YAKD-23-2100-236 7.2 10.8 213 3.6 768

YAKD-23-2100-236 26.4 33.6 1464 7.2 10544

Including 26.4 30.0 2445 3.6 8803

YAKD-23-2100-238 7.2 9.6 319 2.4 764

YAKD-23-2100-238 31.2 43.2 1085 12.0 13025

Including 32.4 34.8 4136 2.4 9926

Surface RC

ZG-RC-23-2220-242 14.0 15.0 1068 1.0 1068

ZG-RC-23-2230-181 16.0 18.0 859 2.0 1718

ZG-RC-23-2230-183 13.0 14.0 84 1.0 84

ZG-RC-23-2230-183 15.0 19.0 375 4.0 1501

ZG-RC-23-2230-196 1.0 2.0 80 1.0 80

ZG-RC-23-2230-196 3.0 5.0 101 2.0 203

ZG-RC-23-2230-196 7.0 12.0 260 5.0 1301

ZG-RC-23-2230-197 0.0 11.0 1087 11.0 11953

Including 5.0 8.0 3182 3.0 9545

ZG-RC-23-2230-198 10.0 11.0 121 1.0 121

ZG-RC-23-2230-198 12.0 14.0 301 2.0 601

ZG-RC-23-2230-199 10.0 11.0 117 1.0 117

ZG-RC-23-2230-199 14.0 15.0 81 1.0 81

ZG-RC-23-2230-207 4.0 15.0 486 11.0 5349

Including 10.0 15.0 845 5.0 4223

ZG-RC-23-2230-207 16.0 17.0 76 1.0 76

ZG-RC-23-2230-208 0.0 2.0 176 2.0 352

ZG-RC-23-2230-208 6.0 7.0 126 1.0 126

ZG-RC-23-2230-208 10.0 11.0 114 1.0 114

ZG-RC-23-2230-209 11.0 14.0 355 3.0 1065

ZG-RC-23-2230-210 0.0 1.0 396 1.0 396

ZG-RC-23-2230-210 8.0 9.0 254 1.0 254

ZG-RC-23-2230-212 5.0 13.0 2812 8.0 22495

ZG-RC-23-2230-214 0.0 1.0 79 1.0 79

ZG-RC-23-2230-223 3.0 4.0 146 1.0 146

ZG-RC-23-2230-224 4.0 12.0 207 8.0 1655

ZG-RC-23-2230-225 8.0 9.0 99 1.0 99

ZG-RC-23-2230-225 11.0 12.0 100 1.0 100

ZG-RC-23-2230-230 0.0 7.0 384 7.0 2686

Including 0.0 2.0 1013 2.0 2026

ZG-RC-23-2230-230 13.0 16.0 1912 3.0 5737

ZG-RC-23-2230-231 0.0 5.0 1341 5.0 6703

ZG-RC-23-2230-232 0.0 2.0 1118 2.0 2237