Montreal, Quebec, August 22, 2023 - Aya Gold & Silver Inc. (TSX: AYA ; OTCQX: AYASF) (“Aya” or the

“Corporation”) is pleased to announce exploration drill results from its Tijirit Gold Project, located in

Mauritania. The results confirm high-grade mineralization that will be used to complete the resources

and reserves update for the project.

Key Highlights1

• Completion of a 25,176-meter (“m”) drill program consisting of 22,067m of reverse circulation

(“RC”) holes and 3,109m of diamond drill holes (“DDH”).

• Results include:

o T23RC155 intersected 10.40 grams per tonne (“ g/t”) gold (“Au”) over 10.0m, including

3.0m at 19.64 g/t Au

o T23RC145 intersected 12.86 g/t Au over 4.0m, including 1.0m at 48.17 g/t Au

o T23RC154 intersected 49.61 g/t Au over 1.0m

o T22RC097 intersected 16.36 g/t Au over 3.0m, including 1.0m at 46.39 g/t Au

o T23RC113 intersected 3.45 g/t Au over 10.0m, including 4.0m at 5.72 g/t Au

o T23RC144 intersected 9.59 g/t Au over 4.0m

o T23RC167 intersected 12.70 g/t Au over 3.0m, including 2.0m at 18.77 g/t Au

o T23RC162 intersected 16.46 g/t Au over 2.0m

“Our infill drill program at the Tijirit Gold Project has delivered high-grade drill results, confirming gold

at both the Eleonore and Eleonore East deposits,” said Benoit La Salle, President & CEO. “These results

are significant in the context of delivering a resource update and completing our feasibility study in the

coming months. These drill results support the potential for an open-pit mine and are complemented by

our preliminary metallurgical work, which indicates recoveries in excess of 94%.”

“These drill results are in line with our expectations and confirm Tijirit’s potential as we look forward to

the project’s future development ,” commented Thierry Vergnol, CEO of Tijirit Exploitation SA,

Mauritanian subsidiary, holder of the Tijirit permit.

1 All intersections are in core lengths and values are uncut.

Table 1 – Significant Intercepts from Tijirit Drill Program (core lengths)

Hole ID From

(m)

To

(m)

Au

(g/t)

Length

(m)

Au * m

T22RC004 42.00 47.00 3.26 5.00 16.30

T22RC010 84.00 88.00 3.25 4.00 13.00

including 84.00 87.00 4.08 3.00 12.24

T22RC016 44.00 48.00 2.90 4.00 11.60

T22RC033 75.00 76.00 14.88 1.00 14.88

T22RC033 83.00 87.00 4.22 4.00 16.88

including 86.00 87.00 15.36 1.00 15.36

T22RC035 27.00 48.00 1.21 21.00 25.41

T22RC066 25.00 31.00 2.50 6.00 15.00

including 26.00 28.00 6.09 2.00 12.18

T22RC068 20.00 29.00 1.92 9.00 17.28

including 23.00 26.00 4.11 3.00 12.33

T22RC081 133.00 135.00 13.00 2.00 26.00

T22RC086 55.00 57.00 9.20 2.00 18.40

including 55.00 56.00 17.77 1.00 17.77

T22RC093 4.00 5.00 15.58 1.00 15.58

T22RC097 75.00 78.00 16.36 3.00 49.08

including 75.00 76.00 46.39 1.00 46.39

T22RC104 118.00 124.00 2.90 6.00 17.40

including 118.00 120.00 5.06 2.00 10.12

T22RC111 104.00 105.00 14.57 1.00 14.57

T22RC113 152.00 162.00 3.45 10.00 34.50

including 156.00 160.00 5.72 4.00 22.88

T22RC128 95.00 96.00 22.76 1.00 22.76

T23RC134 147.00 150.00 5.88 3.00 17.64

including 148.00 149.00 13.89 1.00 13.89

T23RC137 143.00 144.00 13.26 1.00 13.26

T23RC144 98.00 102.00 9.59 4.00 38.36

T23RC145 60.00 64.00 12.86 4.00 51.44

including 60.00 61.00 48.17 1.00 48.17

T23RC146 97.00 99.00 5.20 2.00 10.40

T23RC148 38.00 40.00 5.64 2.00 11.28

T23RC154 149.00 150.00 49.61 1.00 49.61

T23RC155 164.00 174.00 10.40 10.00 104.00

including 164.00 167.00 19.64 3.00 58.92

T23RC157 132.00 134.00 7.19 2.00 14.38

T23RC158 117.00 120.00 5.25 3.00 15.75

T23RC158 155.00 158.00 3.34 3.00 10.02

T23RC159 161.00 166.00 2.46 5.00 12.30

T23RC159 187.00 189.00 6.68 2.00 13.36

T23RC162 36.00 38.00 16.46 2.00 32.92

T23RC162 52.00 54.00 6.47 2.00 12.94

T23RC164 65.00 66.00 12.92 1.00 12.92

T23RC167 93.00 96.00 12.70 3.00 38.10

including 93.00 95.00 18.77 2.00 37.54

T23DD011 49.30 50.00 27.34 0.70 19.14

* All intersections are in core lengths; all values are uncut.

2022 - 2023 Exploration Results

The 2022/2023 drill campaign covering 25,000m, totaled 169 RC holes for 22,067m and 13 DDH for a

total of 3,109m (Appendix 2). Drilling was conducted over the Eleonore and the Eleonore East Trend.

Results from the campaign confirmed the high grade, nuggetty nature of the mineralization (Table 1 and

Appendix 1).

Next Steps

SGS is in the process of updating the Tijirit resources and reserves; once updated, the Aya team plans

to use the updated resources and reserves to complete a feasibility study for the Tijirit Project.

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis

of drill core and RC cuttings . Samples were prepared on site by WESTAGO SARL and transported in

sealed bags for analysis at MSALab laboratory in Nouakchott. Standards of different grades, blanks and

duplicates were insert ed every 37 samples in addition to the standards, blanks and pulp duplicate

inserted by MSALab.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David

Lalonde, B. Sc , Head of Exploration, Qualified Person , for accuracy and compliance with National

Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospective South -Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moroccan mining asset s are complemented by its

Tijirit Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team maximizes shareholder value by anchoring sustainability at the heart of its

production, resource, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com or contact:

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of applicable securities laws (“forward -looking statements”), which reflects management's

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and other opportunities.

Wherever possible, words such as “ promising”, “extend”, “identify”, “confirm”, “plan”, “belief”, “potential”,

“confident”, “could”, “opportunity”, “support”, “suggest”, “expected”, “probably”, and similar expressions

or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely”

to be taken, occur or be achieved, have been used to identify such forward-looking information. Specific

forward-looking statements in this press release include, but are not limited to, statements and

information with respect to the exploration and development potential of Zgounder and the conversion

of Inferred Mineral Resources into Measured and Indicated Mineral Resources, future opportunities for

enhancing development at Zgounder, and timing for the release of the Company's disclosure in

connection with the foregoing. Although the forward-looking information contained in this press release

reflect management's current beliefs based upon information currently available to management and

based upon what management believes to be reasonable assumptions, Aya cannot be certain that

actual results will be c onsistent with such forward -looking information. Such forward -looking

statements are based upon assumptions, opinions and analysis made by management in light of its

experience, current conditions, and its expectations of future developments that managemen t believe

to be reasonable and relevant but that may prove to be incorrect. These assumptions include, among

other things, the closing and timing of financing, the ability to obtain any requisite governmental

approvals, the accuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited

to, ore tonnage and ore grade estimates), silver price, exchange rates, fuel and energy costs, future

economic conditions, anticipated future estimates of free cash flow, and courses of action. Aya

cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risks involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver and

other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the control of Aya, as well as other risks and uncertainties which are more fully

described in Aya's 2022 Annual Information Form dated March 31, 2023, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR at www.sedar.com. Furthermore,

Aya’s corporate update of May 28, 2020 regarding the materiality of its assets as well as to studies

regarding non-material assets remains applicable as at the date hereof. Aya does not undertake any

obligation to update forward-looking statements should assumptions related to these plans, estimates,

projections, beliefs, and opinions change. Nothing in this document should be construed as either an

offer to sell or a solicitation to buy or sell Aya securities. All refere nces to Aya include its subsidiaries

unless the context requires otherwise.

Appendix 1 – Full Drill Results from Tijirit (core lengths)

Hole ID From

(m)

To

(m)

Au

(g/t)

Length

(m)

Au * m

T22RC001 25.00 27.00 0.80 2.00 1.60

T22RC001 31.00 32.00 2.32 1.00 2.32

T22RC001 40.00 42.00 2.46 2.00 4.92

T22RC001 47.00 49.00 4.51 2.00 9.02

T22RC001 56.00 57.00 0.50 1.00 0.50

T22RC001 67.00 69.00 2.93 2.00 5.86

T22RC001 83.00 84.00 2.50 1.00 2.50

T22RC002 37.00 38.00 1.22 1.00 1.22

T22RC003 40.00 42.00 1.98 2.00 3.96

T22RC003 47.00 48.00 1.01 1.00 1.01

T22RC004 42.00 47.00 3.26 5.00 16.30

T22RC004 70.00 71.00 3.75 1.00 3.75

T22RC004 92.00 93.00 3.05 1.00 3.05

T22RC005 15.00 16.00 0.59 1.00 0.59

T22RC005 46.00 47.00 1.83 1.00 1.83

T22RC006 20.00 25.00 0.85 5.00 4.25

T22RC006 33.00 34.00 0.69 1.00 0.69

T22RC006 59.00 60.00 1.28 1.00 1.28

T22RC007 24.00 25.00 0.61 1.00 0.61

T22RC007 62.00 63.00 0.54 1.00 0.54

T22RC007 93.00 96.00 1.08 3.00 3.24

T22RC008 23.00 24.00 0.78 1.00 0.78

T22RC008 41.00 42.00 1.80 1.00 1.80

T22RC008 77.00 78.00 6.41 1.00 6.41

T22RC009 49.00 50.00 1.01 1.00 1.01

T22RC010 8.00 9.00 0.70 1.00 0.70

T22RC010 22.00 23.00 1.01 1.00 1.01

T22RC010 68.00 70.00 2.83 2.00 5.66

T22RC010 84.00 88.00 3.25 4.00 13.00

including 84.00 87.00 4.08 3.00 12.24

T22RC010 90.00 91.00 0.62 1.00 0.62

T22RC010 98.00 99.00 0.54 1.00 0.54

T22RC011 38.00 39.00 4.42 1.00 4.42

T22RC012 10.00 11.00 2.37 1.00 2.37

T22RC012 40.00 41.00 2.42 1.00 2.42

T22RC013 14.00 15.00 0.50 1.00 0.50

T22RC013 21.00 24.00 0.90 3.00 2.70

T22RC014 68.00 71.00 0.64 3.00 1.92

T22RC015 47.00 48.00 1.03 1.00 1.03

T22RC016 44.00 48.00 2.90 4.00 11.60

including 46.00 47.00 8.76 1.00 8.76

T22RC017 9.00 10.00 0.70 1.00 0.70

T22RC017 19.00 20.00 0.61 1.00 0.61

T22RC017 75.00 76.00 2.02 1.00 2.02

T22RC018 54.00 55.00 0.77 1.00 0.77

T22RC018 58.00 59.00 0.79 1.00 0.79

T22RC019 44.00 45.00 0.69 1.00 0.69

T22RC020 18.00 19.00 1.36 1.00 1.36

T22RC020 35.00 36.00 1.03 1.00 1.03

T22RC021 0.00 35.00 NSR

T22RC022 32.00 36.00 1.10 4.00 4.40

T22RC022 153.00 154.00 0.73 1.00 0.73

T22RC023 130.00 131.00 3.61 1.00 3.61

T22RC024 0.00 102.00 NSR

T22RC025 53.00 54.00 5.44 1.00 5.44

T22RC025 67.00 68.00 8.01 1.00 8.01

T22RC025 83.00 84.00 1.12 1.00 1.12

T22RC025 101.00 102.00 0.58 1.00 0.58

T22RC025 118.00 119.00 0.78 1.00 0.78

T22RC025 127.00 128.00 0.80 1.00 0.80

T22RC025 157.00 159.00 0.59 2.00 1.18

T22RC026 59.00 60.00 0.60 1.00 0.60

T22RC026 68.00 69.00 1.15 1.00 1.15

T22RC027 20.00 24.00 0.69 4.00 2.76

T22RC027 32.00 33.00 3.35 1.00 3.35

T22RC027 58.00 59.00 0.56 1.00 0.56

T22RC027 117.00 119.00 1.35 2.00 2.70

T22RC028 18.00 19.00 0.84 1.00 0.84

T22RC029 24.00 26.00 0.59 2.00 1.18

T22RC029 81.00 82.00 1.78 1.00 1.78

T22RC030 9.00 10.00 0.65 1.00 0.65

T22RC030 58.00 59.00 0.75 1.00 0.75

T22RC031 89.00 91.00 1.62 2.00 3.24

T22RC031 92.00 94.00 0.67 2.00 1.34

T22RC032 42.00 43.00 0.51 1.00 0.51

T22RC032 76.00 77.00 0.65 1.00 0.65

T22RC032 78.00 83.00 1.95 5.00 9.75

including 79.00 80.00 6.79 1.00 6.79

T22RC032 107.00 108.00 0.80 1.00 0.80

T22RC032 110.00 111.00 0.68 1.00 0.68

T22RC032 117.00 120.00 0.85 3.00 2.55

T22RC032 152.00 153.00 3.11 1.00 3.11

T22RC033 55.00 57.00 1.25 2.00 2.50

T22RC033 75.00 76.00 14.88 1.00 14.88

T22RC033 83.00 87.00 4.22 4.00 16.88

including 86.00 87.00 15.36 1.00 15.36

T22RC034 0.00 80.00 NSR

T22RC035 27.00 48.00 1.21 21.00 25.41

including 37.00 40.00 2.64 3.00 7.92

including 47.00 48.00 5.94 1.00 5.94

T22RC035 56.00 57.00 0.71 1.00 0.71

T22RC036 72.00 77.00 1.31 5.00 6.55

T22RC036 85.00 86.00 0.57 1.00 0.57

T22RC037 0.00 76.00 NSR

T22RC038 0.00 100.00 NSR

T22RC039 39.00 42.00 1.57 3.00 4.71

T22RC040 43.00 44.00 0.60 1.00 0.60

T22RC041 14.00 15.00 0.53 1.00 0.53

T22RC042 51.00 53.00 1.05 2.00 2.10

T22RC043 0.00 99.00 NSR

T22RC044 62.00 63.00 0.55 1.00 0.55

T22RC044 72.00 73.00 1.98 1.00 1.98

T22RC045 38.00 39.00 3.08 1.00 3.08

T22RC046 16.00 18.00 3.02 2.00 6.04

T22RC046 76.00 77.00 2.29 1.00 2.29

T22RC047 64.00 65.00 3.19 1.00 3.19

T22RC047 83.00 85.00 0.66 2.00 1.32

T22RC048 52.00 53.00 1.34 1.00 1.34

T22RC049 82.00 83.00 2.54 1.00 2.54

T22RC049 90.00 91.00 0.92 1.00 0.92

T22RC050 43.00 45.00 1.59 2.00 3.18

T22RC051 86.00 92.00 0.88 6.00 5.28

including 86.00 88.00 1.40 2.00 2.80

T22RC051 93.00 94.00 0.54 1.00 0.54

T22RC051 114.00 115.00 3.30 1.00 3.30

T22RC051 116.00 117.00 0.74 1.00 0.74

T22RC052 29.00 32.00 1.18 3.00 3.54

T22RC052 70.00 71.00 1.55 1.00 1.55

T22RC052 82.00 83.00 0.82 1.00 0.82

T22RC053 45.00 46.00 0.65 1.00 0.65

T22RC054 0.00 140.00 NSR

T22RC055 27.00 28.00 1.53 1.00 1.53

T22RC056 22.00 27.00 1.94 5.00 9.70

including 25.00 26.00 6.82 1.00 6.82

T22RC056 73.00 74.00 0.57 1.00 0.57

T22RC057 0.00 73.00 NSR

T22RC058 0.00 88.00 NSR

T22RC059 30.00 31.00 0.72 1.00 0.72

T22RC060 0.00 115.00 NSR

T22RC061 0.00 141.00 NSR

T22RC062 0.00 90.00 NSR

T22RC063 9.00 12.00 3.28 3.00 9.84

including 9.00 11.00 4.05 2.00 8.10

T22RC063 15.00 16.00 1.26 1.00 1.26

T22RC063 38.00 39.00 9.96 1.00 9.96

T22RC064 0.00 70.00 NSR

T22RC065 11.00 12.00 2.93 1.00 2.93

T22RC066 25.00 31.00 2.50 6.00 15.00

including 26.00 28.00 6.09 2.00 12.18

T22RC067 11.00 12.00 1.10 1.00 1.10

T22RC067 19.00 21.00 0.79 2.00 1.58

T22RC068 18.00 19.00 0.51 1.00 0.51

T22RC068 20.00 29.00 1.92 9.00 17.28

including 23.00 26.00 4.11 3.00 12.33

T22RC069 16.00 17.00 1.40 1.00 1.40

T22RC069 40.00 41.00 0.71 1.00 0.71

T22RC069 72.00 73.00 0.52 1.00 0.52

T22RC070 131.00 132.00 0.70 1.00 0.70

T22RC071 26.00 27.00 1.43 1.00 1.43

T22RC071 96.00 98.00 2.28 2.00 4.56

T22RC071 132.00 134.00 1.09 2.00 2.18

T22RC071 142.00 145.00 1.20 3.00 3.60

T22RC072 56.00 57.00 0.53 1.00 0.53

T22RC072 113.00 114.00 0.51 1.00 0.51

T22RC072 163.00 165.00 1.67 2.00 3.34

T22RC072 170.00 171.00 1.76 1.00 1.76

T22RC072 193.00 194.00 0.96 1.00 0.96

T22RC073 47.00 48.00 0.67 1.00 0.67

T22RC073 59.00 60.00 0.52 1.00 0.52

T22RC073 163.00 164.00 0.99 1.00 0.99

T22RC074 73.00 74.00 0.51 1.00 0.51

T22RC074 193.00 194.00 0.58 1.00 0.58

T22RC075 0.00 200.00 NSR

T22RC076 0.00 245.00 NSR

T22RC077 0.00 225.00 NSR

T22RC078 0.00 142.00 NSR

T22RC079 0.00 1.00 0.81 1.00 0.81

T22RC079 16.00 17.00 0.67 1.00 0.67

T22RC079 25.00 26.00 7.15 1.00 7.15

T22RC079 60.00 63.00 0.76 3.00 2.28

T22RC079 69.00 71.00 0.74 2.00 1.48

T22RC079 78.00 79.00 0.99 1.00 0.99

T22RC079 137.00 138.00 7.74 1.00 7.74

T22RC080 0.00 1.00 1.28 1.00 1.28

T22RC080 99.00 101.00 4.88 2.00 9.76

T22RC081 20.00 21.00 5.21 1.00 5.21

T22RC081 30.00 31.00 0.99 1.00 0.99

T22RC081 60.00 61.00 1.23 1.00 1.23

T22RC081 82.00 83.00 0.80 1.00 0.80

T22RC081 107.00 108.00 0.67 1.00 0.67

T22RC081 133.00 135.00 13.00 2.00 26.00

T22RC082 25.00 26.00 1.83 1.00 1.83

T22RC083 0.00 1.00 1.35 1.00 1.35

T22RC083 20.00 21.00 1.69 1.00 1.69

T22RC083 24.00 25.00 2.86 1.00 2.86

T22RC083 27.00 28.00 0.70 1.00 0.70

T22RC083 139.00 140.00 3.18 1.00 3.18

T22RC084* Hole completed in DD (T23RD004)

T22RC085 72.00 73.00 0.51 1.00 0.51

T22RC085 121.00 122.00 0.68 1.00 0.68

T22RC086 55.00 57.00 9.20 2.00 18.40

including 55.00 56.00 17.77 1.00 17.77

T22RC087 0.00 50.00 NSR

T22RC088 83.00 84.00 0.57 1.00 0.57

T22RC089 0.00 48.00 NSR

T22RC090 0.00 115.00 NSR

T22RC091 29.00 30.00 5.18 1.00 5.18

T22RC091 35.00 36.00 0.82 1.00 0.82

T22RC091 42.00 44.00 0.79 2.00 1.58

T22RC091 98.00 99.00 0.86 1.00 0.86

T22RC092 110.00 111.00 5.21 1.00 5.21

T22RC092 133.00 134.00 0.51 1.00 0.51

T22RC092 136.00 137.00 0.62 1.00 0.62

T22RC092 138.00 139.00 0.88 1.00 0.88

T22RC093 4.00 5.00 15.58 1.00 15.58