Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Announces High-Grade Continuity over 2.7 Kilometers at Boumadine

Drill Results

PRESS RELEASE

Aya Gold & Silver Announces High-Grade Continuity over 2.7 Kilometers at

Boumadine

Montreal, Quebec, September 08, 2022 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or

the “Corporation”) is pleased to announce initial drill results and mineralized intersections from the 2022

drill exploration program at its brownfield Boumadine property in the Kingdom of Morocco.

Key Highlights (all intersections are in core lengths; Ag equivalent is based on a 100% recovery with the

following ratio s calculated with September 7, 2022 , prices: 1g/t Au: 93.4 g/t Ag; 1% Cu: 130.4 g/t Ag;

1% Pb: 31.8 g/t Ag; 1% Zn: 54.1 g/t Ag)

• Definition of n ew m ineralization and extension of a Central and South Zone. The main

mineralized trend, which can now be followed over 2. 7 kilometers (“km”), is open at both end s

along strike and at depth.

o BOU-DD22-036 intercepted 1,408 gram per tonne (“g/t”) silver (“ Ag”) equivalent over

12.0 meters (“m”) (4.64 g/t Au, 236 g/t Ag, 11.0% Zn, 4.3% Pb and 0.04% Cu) in a wider

32.8m section of 1,030 g/t Ag equivalent (“AgEq”)

o BOU-DD22-021 intercepted 795 g/t AgEq over 9.0m (5.37 g/t Au, 67 g/t Ag, 2.9% Zn,

0.9% Pb and 0.3% Cu)

o BOU-DD22-002 intercepted 620 g/t AgEq over 7.60m (3.82 g/t Au, 126 g/t Ag, 1.6% Zn,

0.8% Pb and 0.2% Cu) in a wider 14.3m interval of 398 g/t Ag equivalent

o BOU-DD22-032 intercepted 777 g/t AgEq over 2.3m (3.81 g/t Au, 158 g/t Ag, 2.5% Zn,

0.1% Pb and 0.9% Cu)

o BOU-DD22-004 intercepted 392 g/t AgEq over 7.2m (1.99 g/t Au, 100 g/t Ag, 1.6% Zn,

0.4% Pb and 0.1% Cu) and 310 g/t Ag Eq over 11.7m (1.08 g/t Au, 41 g/t Ag, 2.7% Zn,

0.4% Pb and 0.1% Cu)

• 9,116m of drilling completed as of August 31, 2022, on 6 different sections, for a total of 43

diamond drill holes (“DDH”)

• Confirmation of the continuity of the mineralized structure between the Central Zone and the

South Zone, extending mineralization to over 2.7km of strike length, and remaining open in all

directions

• Expansion of the 7,500m initial drill program to 13,500m based on the promising results to date

“We are excited with these high-grade drill results at Boumadine, which indicate mineralization over 2.7

kilometers and confirm our belief that Boumadine has tremendous potential ,” said Benoit La Salle,

President & CEO. “The results to date demonstrate a robust, near -surface, polymetallic system with

continuity in multiple lenses that remains open in all directions. In particular, hole BOU-DD22-036 is a

very rich intersection on the southernmost section with ample room to extend the strike length. As we

expand our drilling program and understanding of the mineralizing system, we grow more confident in

the potential to uncover the next big discovery in Morocco.”

“Boumadine represents our next leg of growth , together with Zgounder Regional where we are also

mobilizing drill rigs and deploying resources to add high-grade ounces. Our focus at Boumadine near

term will be on in-fill drilling within the Central and South Zone targets, completing further step-out holes

at depth and along the main trend; and assessing the potential to make additional discoveries along this

over 6-kilometer mineral-rich hydrothermal system.”

Table 1 – Significant Intercepts from 2022 Boumadine Drill Exploration Program (core lengths)

DDH No. Section From

(m)

To

(m)

Au

(g/t)

Ag

(g/t)

Length*

(m)

Cu

(%)

Pb

(%)

Zn

(%)

Mo***

(g/t)

Ag Eq**

(g/t)

BOU-DD22-002 Central 1 93.3 107.6 2.26 75 14.3 0.1 0.5 1.5 15 398

including 96.9 104.5 3.82 126 7.6 0.2 0.8 1.6 15 620

BOU-DD22-004 Central 1 128.0 135.2 1.99 100 7.2 0.1 0.4 1.6 8 392

including 131.4 134.2 4.43 216 2.8 0.1 0.5 1.5 8 741

BOU-DD22-004 Central 1 160.3 163.9 2.41 102 3.6 0.2 0.6 6.7 36 741

BOU-DD22-006 Central 1 3.0 6.5 1.67 98 3.5 0.0 0.1 0.0 8 265

BOU-DD22-020 South 1 20.3 22.5 1.36 145 2.2 0.0 0.5 0.1 105 306

BOU-DD22-021 South 1 94.5 103.5 5.37 67 9.0 0.3 0.9 2.9 43 795

including 95.0 98.5 4.42 75 3.5 0.4 1.2 5.4 54 878

including 99.5 102.0 11.36 89 2.5 0.4 0.7 1.7 35 1,319

BOU-DD22-023 South 1 150.9 152.9 5.18 35 2.0 0.1 1.3 2.8 7 722

including 150.9 151.9 9.92 53 1.0 0.1 1.9 4.2 8 1,283

BOU-DD22-029 South 2 55.0 56.3 11.82 12 1.3 0.0 0.0 0.0 9 1,121

BOU-DD22-031 South 3 115.0 115.9 4.61 312 0.9 0.4 0.4 0.7 1,211 916

BOU-DD22-032 South 3 161.9 164.2 3.81 158 2.3 0.9 0.1 2.5 109 777

BOU-DD22-033 South 3 207.4 209.3 2.73 39 1.9 0.1 0.5 9.3 0 827

BOU-DD22-036 South 4 42.2 75.0 2.12 233 32.8 0.1 4.2 8.4 0 1,030

including 55.9 67.9 4.64 236 12.0 0.0 4.3 11.0 0 1,408

* True width remains undetermined at this stage; all values are uncut.

** Ag equivalent is based on a 100% recovery with the following ratio calculated with September 7, 2022 prices; 1 g/t Au: 93.4 g/t Ag;

1% Cu:130.4 Ag; 1% Pb: 31.8 Ag; 1% Zn: 54.1 Ag.

*** Mo results are pending for holes BOU-DD22-033 to BOU-DD22-038.

Figure 1 – Surface Plan of Boumadine Property with Preliminary Magnetic Data (Residual Total

Field) and Drill Holes

2022 Exploration and Drilling Programs

The 2022 drill exploration program (Figures 1 and 2) at Boumadine consisted of 38 DDH or a total of

7,500m over 6 sections, two of which in the Central Zone, and four in the South Zone (Appendix 2). Our

objective was to test the mineralization and the continuity between the Central and the South Zones

against our analysis and geological interpretation. This new interpretation was informed by results from

the hyperspectral survey, historical drilling review and a detailed field study. The historical database

(pre-2020) consists of a mix of 661 drill holes and or channel and or trenches totaling 30,358m; most of

which were completed over the Central Zone and to a lesser extent over the North, South, Imariren and

Tizi Zones. In addition, some mining development data exist for the Central (three levels) and South

(two levels) Zones. Although the data guided the plan for our 2022 drill program, to date we have not

assessed the reliability of the data. Furthermore, our press release of May 28, 2020 regarding studies

and information pertaining to non-material assets of the Corporation remain applicable as at the date

hereof.

To date, the results of 38 DDH have been received with one hole extension, BOU-DD22-028, still pending

(Appendix 1). In view of this exploration success, the drilling program at Boumadine has been increased

by an additional 6,000m to cover the North Zone, Imariren, Tizi and the South-West Zones. Figures 3 to

8 present each of the six sections, its significant results, and geological interpretation.

The mineralization consists generally of 1m to 4m wide (locally reaching over 10m width) N340-

oriented massive sulfide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins

(>80%) are composed mainly of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite.

Within the massive sulphide veins, zones of breccias are present with silicified angular fragments and

round fragments completely replaced by pyrite. These zones underline the presence of syn -volcanic

faults used by the mineralization. Replacement of fragments by pyri te in weathered felsic tuffs locally

induces large zones several tens of meters thick of sub-economical anomalous values . These wide

zones are interpreted as the upper part of the hydrothermal system. The assay results show a strong

correlation between the gold, silver, and copper values. A weaker correlation exists with zinc, lead and

molybdenum.

The mineralization is mainly in a sequence of volcaniclastic rock composed of felsic tuff and mafic tuff.

The felsic tuffs are composed of angular to rounded cent imetric felsic fragments, quartz eyes, and

plagioclase crystals, with locally mafic fragments. This sequence is generally homogeneous and

massive and rests in unconformity on mafic tuffs. The mafic tuffs are characterized by a variable

percentage of amphibole crystals and exotic fragments of sedimentary rocks, confirming their clastic

origin. Those tuffs are interpreted as having a volcaniclastic origin, sedimentation in an underwater

basin.

Intrusive rocks are divided into two groups: pre - to syn-mineralization and post-mineralization. Pre- to

syn-mineralization dykes are mainly felsic to intermediate in composition, aphanitic to porphyritic in

texture and are found as dykes or sills in both mafic and felsic tuffs, suggesting bimodal volcanism.

Late intrusi ons are mainly rhyolitic subvolcanic domes that cut mineralization and are spatially

associated with normal faults. They are interpreted as being synchronous with the post -mineralization

deformation episode that segmented the mineralized zones. A swarm of regional extended mafic dykes

cut each lithology on the property.

Two sequences of hydrothermal alteration are observed on the property. The first sequence mainly

affects felsic tuff and manifests as phyllic alteration (Quartz-sericite-pyrite). Proximal to the veins, there

is an advanced clay alteration composed of kaolinite, pyrophyllite and vuggy silica , suggesting a high-

sulphidation epithermal event. The second sequence of alteration mainly affects the underlying mafic

tuffs and consists of large-scale propylitization (epidote and chlorite). Near the veins, the alteration is

composed of black chlorite, pyrophyllite and pyrite. The transition between these two alterations is

relatively rapid and consistent with the change in composition of the tuffs and suggests chloride fluids

rich in Fe, Zn and Pb, typical of VMS style mineralization.

Preliminary results confirm the continuity in the system between the Central Zone and the South Zone,

extending known mineralization over a 2.7km strike length and remaining open in all directions. Drilling

so far also supports the potential for very rich, large lenses of massive sulphide as shown by the results

in BOU-DD22-002, BOU-DD22-004, BOU-DD22-021and BOU-DD22-036. In addition, the high values of Zn

and Pb over large widths should significantly increase the potential and economic value of Boumadine.

During the ongoing drill program, mapping and prospecting is being extended by our field geologists.

Many new mineralized structures and zone s of high alteration are currently being identified within the

permit perimeter.

Figure 2 – Surface Plan with DDH Completed in 2022 on Boumadine

Figure 3 – Section 1 of Boumadine’s Central Zone with BOU-DD22-002 and BOU-DD22-004

Figure 4 – Section 2 of Boumadine’s Central Zone with BOU-DD22-016

Figure 5 – Section 1 of Boumadine’s South Zone with BOU-DD22-020 and BOU-DD22-021

Figure 6 – Section 2 of Boumadine’s South Zone with BOU-DD22-025 and BOU-DD22-027

Figure 7 – Section 3 of Boumadine’s South Zone with BOU-DD22-032 and BOU-DD22-033

Figure 8 – Section 4 of Boumadine’s South Zone with BOU-DD22-036 and BOU-DD22-038