Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AYA.TO ·

Aya Gold & Silver Announces High-Grade, At-Depth Drill Results at Zgounder

Drill Results

PRESS RELEASE

.

Aya Gold & Silver Announces High-Grade, At-Depth Drill Results at Zgounder

Montreal, Quebec, January 31, 2024 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the

“Corporation”) is pleased to announce high-grade silver drill results from its at-depth drill program at the

Zgounder Silver Mine in the Kingdom of Morocco.

Key Highlights (all intersections are in core lengths)

o From surface , diamond drill hole (“DDH”) ZG-23-54 intercepted 1,846 grams per tonne (“g/t”)

silver (“ Ag”) over 7.0 meters (“ m”), including 5.0m at 2,095 g/t Ag; and ZG-23-35 intercepted

683 g/t Ag over 15.0m, including 6.0m at 1,221 g/t Ag

o In the Central Zone from the 1,950m level:

o hole ZG-SF-23-055 intercepted 672 g/t Ag over 7.5m near the granite contact

o hole DZG-SF-23-292 intercepted 2,430 g/t Ag over 4.5m, including 4,174 g/t Ag over 2.5m

o hole ZG-SF-23-038 intercepted 675 g/t Ag over 14.0m, including 951 g/t Ag over 7.0m

o hole TD28-23-1950-752 intercepted 858 g/t Ag over 12.0m, including 1,905 g/t Ag over

4.8m

o In the Central Zone from the 1,925m level:

o hole ZG-SF-23-056 intercepted 391 g/t Ag over 11.5m near the granite contact

o In the Central Zone from the 2,100m level:

o hole YAKD-23-2100-202 intercepted 1,005 g/t Ag over 30.0m, including 2,354 g/t Ag over

12.0m

“Today’s results including holes ZG-23-54 and DZG-SF-23-292 further validate the very high-grade nature

of Zgounder , while holes ZG -SF-23-055 and ZG -SF-23-056 confirm mineralization near the granite

contact,” said Benoit La Salle, President & CEO. “Importantly, these initial results outline significant down-

plunge extensions of the deposit and continue to return thick, high-grade intercepts. Four underground

rigs are now mobilized with the objective of expanding mineral resources at depth.”

Included in this release are results for 249 holes, which include 114 underground DDH, 35 surface DDH,

61 T28 and 39 YAK holes (T28 and YAK: percussion drilling using an air-compressed hammer). For a full

summary of today’s results, refer to Appendix 1.

Table 1 – Significant Intercepts from Drilling at Zgounder (core lengths)

Hole ID From To Ag Length

(m)*

Ag x

width (g/t)

Surface DDH

ZG-23-35 85.0 100.0 683 15.0 10,247

Including 87.0 93.0 1,221 6.0 7,326

ZG-23-42 82.5 84.0 1,970 1.5 2,955

ZG-23-54 56.0 63.0 1,846 7.0 12,923

Including 56.0 61.0 2,095 5.0 10,476

ZG-23-58 10.0 14.0 1,828 4.0 7,313

Underground DDH

ZG-SF-23-023 37.0 38.0 1,754 1.0 1,754

ZG-SF-23-029 87.0 93.5 417 6.5 2,712

ZG-SF-23-031 39.0 40.0 1,656 1.0 1,656

ZG-SF-23-038 42.0 56.0 675 14.0 9,456

Including 46.5 53.5 951 7.0 6,658

ZG-SF-23-055 153.0 160.5 672 7.5 5,037

Including 154.0 157.0 1,375 3.0 4,124

ZG-SF-23-056 277.5 289.0 391 11.5 4,491

DZG-SF-23-258 14.5 16.0 1,091 1.5 1,636

DZG-SF-23-275 55.5 57.0 2,087 1.5 3,131

DZG-SF-23-292 46.5 51.0 2,430 4.5 10,933

Including 47.5 50.0 4,174 2.5 10,434

DZG-SF-23-295 40.0 59.5 362 19.5 7,066

Including 50.0 52.5 1,609 2.5 4,023

DZG-SF-23-311 68.5 77.5 180 9.0 1,621

Underground T28

TD28-23-1950-752 9.6 21.6 858 12.0 10,297

Including 9.6 14.4 1,905 4.8 9,144

TD28-23-1950-979 12.0 19.2 795 7.2 5,726

Including 12.0 14.4 1,562 2.4 3,749

TD28-23-1950-980 12.0 14.4 874 2.4 2,098

TD28-23-1950-985 14.4 21.6 327 7.2 2,357

TD28-23-1950-991 12.0 19.2 249 7.2 1,794

TD28-23-1975-636 10.8 20.4 684 9.6 6,568

TD28-23-2000-966 12.0 14.4 928 2.4 2,226

TD28-23-2000-967 12.0 19.2 592 7.2 4,264

Including 13.2 16.8 960 3.6 3,456

TD28-23-2000-970 12.0 14.4 788 2.4 1,891

TD28-23-2000-972 8.4 12.0 919 3.6 3,307

Underground YAK

YAKD-23-1995-315 24.0 33.6 203 9.6 1,944

YAKD-23-1995-316 27.6 48.0 425 20.4 8,663

Including 27.6 34.8 912 7.2 6,569

YAKD-23-2075-303 4.8 7.2 1,044 2.4 2,506

YAKD-23-2075-304 1.2 7.2 555 6.0 3,329

YAKD-23-2100-202 6.0 36.0 1,005 30.0 30,151

Including 10.8 22.8 2,354 12.0 28,248

YAKD-24-2125-002 4.8 8.4 439 3.6 1,580

YAKD-24-2125-002 30.0 36.0 292 6.0 1,750

1 Holes were drilled at various angles; true widths are not known at this time.

2 All assay results are above the cut-off grade of 75 g/t Ag.

Figure 1: Location of Drill Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one met er in length of core, which is

halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and

assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. All

samples are analyzed for s ilver, copper, iron, lead, and zinc using Aqua regia and finished by atomic

absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire assaying.

For definition drilling using T28 drilling equipment, all individual samples represent 1.2m in length.

Samples are assayed at either the Zgounder Mine laboratory or at Afrilab. At Afrilab, all samples are

analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading

above 200 g/t Ag are reanalyzed using fire assaying. At ZMSM, all samples are analyzed for silver only

using Aqua regia and finished by AAS. Rigorous quality controls (QaQc) are applied at both locations.

David Lalonde, B.Sc. P. Geo, Head of Exploration, is Aya Gold & Silver’s Qualified Person and has reviewed

this press release for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom

of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and

is exploring its properties along the prospective South -Atlas Fault, several of which have hosted past -

producing mines and historical resources. Aya’s Moroccan mining assets are complemented by its Tijirit

Gold Project in Mauritania, which is being advanced to feasibility.

Aya’s management team has been focused on maximising shareholder value by anchoring sustainability

at the heart of its operations, governance, and financial growth plans.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

President & CEO

[email protected]

Alex Ball

VP, Corporate Development & IR

[email protected]

Forward-Looking Statements

This press release contains certain statements that constitute forward -looking information within the

meaning of applicable securities laws (“forward -looking statements”), which reflects management’s

expectations regarding Aya’s future growth and business prospects (including the timing and

development of new deposits and the success of exploration activities) and other opportunities.

Wherever possible, words such as “validate”, “confirm”, “significant”, “continue”, “objective”, “expand”, ,

and similar expressions or statements that certain actions, events or results “may”, “could”, “would”,

“might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such forward -

looking information. Specific forward-looking statements in this press release include, but are not limited

to, statements and information with respect to the exploration and development potential of Zgounder in

particular the nature of the deposit as it hits the granite and the continuation of down-plunge extensions,

the conversion of Inferred Mineral Resources into Measured and Indicated Mineral Resources and future

opportunities for enhancing development at Zgounder including the possible expansion of the mineral

resource at depth . Although the forward -looking information contained in this press release reflect

management’s current beliefs based upon information currently available to management and based

upon what management believes to be reasonable assumptions, Aya cannot be certain that actual results

will be consistent with such forward -looking information. Such forward -looking statements are based

upon assumptions, opinions and analysis made by management in light of its experience, current

conditions, and its expectations of future developments that management believe to be reasonable and

relevant but that may prove to be incorrect. These assumptions include, among other things, the ability

to obtain any requisite governmental approvals, obtaining regulatory permits for on site work, importing

goods and machinery and employment permits, the accuracy of Mineral Reserve and Mineral Resource

Estimates (including, but not limited to, ore tonnage and ore grade estimates), the price of silver, the price

of gold, exchange rates, fuel and energy costs, future economic conditions, anticipated future estimates

of free cash flow, and courses of action. Aya cautions you not to place undue reliance upon any such

forward-looking statements.

The risks and uncertainties that may affect forward -looking statements include, among others: the

inherent risks involved in exploration and development of mineral properties, including government

approvals and permitting, changes in economic conditions, changes in the worldwide price of silver gold

and other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being

affected by metallurgical characteristics) and other factors, such as project execution delays, many of

which are beyond the control of Aya, as well as other risks and uncertainties which are more fully

described in Aya’s 2022 Annual Information Form dated March 31, 2023, and in other filings of Aya with

securities and regulatory authorities which are available on SEDAR at www.sedarplus.ca. Aya does not

undertake any obligation to update forward -looking statements should assumptions related to these

plans, estimates, projections, beliefs, and opinions change. Nothing in this document should be

construed as either an offer to sell or a solicitation to buy or sell Aya securities. All references to Aya

include its subsidiaries unless the context requires otherwise.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

Hole ID From To Ag Length

(m)*

Ag x

width (g/t)

Surface DDH

ZG-23-26 280.5 281.0 80 0.5 40

ZG-23-26 379.0 380.5 90 1.5 135

ZG-23-34 48.0 49.5 404 1.5 606

ZG-23-34 66.0 68.0 237 2.0 473

ZG-23-35 76.0 77.5 218 1.5 327

ZG-23-35 85.0 100.0 683 15.0 10,247

Including 87.0 93.0 1,221 6.0 7,326

ZG-23-36 233.0 233.5 216 0.5 108

ZG-23-36 238.0 245.0 165 7.0 1,155

ZG-23-36 498.5 500.0 348 1.5 522

ZG-23-38 6.0 7.5 194 1.5 291

ZG-23-39 55.0 56.5 412 1.5 618

ZG-23-42 48.0 51.0 334 3.0 1,002

ZG-23-42 82.5 84.0 1,970 1.5 2,955

ZG-23-42 100.5 103.5 150 3.0 450

ZG-23-43 3.0 4.5 84 1.5 126

ZG-23-44 40.5 42.0 213 1.5 320

ZG-23-44 75.0 78.0 162 3.0 486

ZG-23-44 94.5 97.5 121 3.0 363

ZG-23-46 4.5 6.0 80 1.5 120

ZG-23-49 102.0 103.5 588 1.5 882

ZG-23-49 109.5 111.0 106 1.5 159

ZG-23-51 15.0 16.5 94 1.5 141

ZG-23-51 18.0 19.5 76 1.5 114

ZG-23-51 82.5 83.5 279 1.0 279

ZG-23-54 56.0 63.0 1,846 7.0 12,923

Including 56.0 61.0 2,095 5.0 10,476

ZG-23-55 0.0 3.0 127 3.0 381

ZG-23-55 45.0 46.5 179 1.5 269

ZG-23-55 51.5 53.5 189 2.0 378

ZG-23-55 101.5 102.0 1,422 0.5 711

ZG-23-55 157.0 158.0 95 1.0 95

ZG-23-58 10.0 14.0 1,828 4.0 7,313

ZG-23-58 18.5 21.5 268 3.0 804

ZG-23-59 35.0 36.5 79 1.5 119

Underground DDH

ZG-SF-23-023 37.0 38.0 1,754 1.0 1,754

ZG-SF-23-027 65.5 69.0 103 3.5 362

ZG-SF-23-027 77.5 83.5 121 6.0 723

ZG-SF-23-029 87.0 93.5 417 6.5 2,712

ZG-SF-23-031 39.0 40.0 1,656 1.0 1,656

ZG-SF-23-038 42.0 56.0 675 14.0 9,456

Including 46.5 53.5 951 7.0 6,658

ZG-SF-23-047 43.5 45.0 264 1.5 396

ZG-SF-23-051 39.0 40.0 83 1.0 83

ZG-SF-23-051 41.0 42.0 816 1.0 816

ZG-SF-23-052 75.0 78.0 362 3.0 1,086

ZG-SF-23-053 168.0 169.5 780 1.5 1,170

ZG-SF-23-054 110.0 111.5 202 1.5 303

ZG-SF-23-054 146.0 149.0 258 3.0 775

ZG-SF-23-055 153.0 160.5 672 7.5 5,037

Including 154.0 157.0 1,375 3.0 4,124

ZG-SF-23-056 236.0 237.5 332 1.5 498

ZG-SF-23-056 264.0 268.5 97 4.5 435

ZG-SF-23-056 277.5 289.0 391 11.5 4,491

ZG-SF-23-056 291.5 292.5 124 1.0 124

ZG-SF-23-056 298.5 302.5 106 4.0 424

ZG-SF-23-056 305.0 306.5 118 1.5 177

ZG-SF-23-056 331.5 334.5 191 3.0 572

ZG-SF-23-068 158.0 160.0 150 2.0 300

ZG-SF-23-069 55.5 57.0 76 1.5 114

DZG-SF-23-250 33.0 34.0 94 1.0 94

DZG-SF-23-250 83.0 84.0 122 1.0 122

DZG-SF-23-250 131.0 131.5 368 0.5 184

DZG-SF-23-252 22.5 24.0 149 1.5 224

DZG-SF-23-252 66.5 67.5 85 1.0 85

DZG-SF-23-252 85.5 87.0 844 1.5 1,266

DZG-SF-23-254 87.0 88.5 201 1.5 302

DZG-SF-23-254 113.5 116.5 216 3.0 648

DZG-SF-23-254 134.5 139.0 278 4.5 1,250

DZG-SF-23-256 106.5 108.0 76 1.5 114

DZG-SF-23-258 14.5 16.0 1,091 1.5 1,636

DZG-SF-23-258 20.5 22.0 78 1.5 117

DZG-SF-23-258 47.0 48.0 97 1.0 97

DZG-SF-23-260 49.5 50.5 86 1.0 86

DZG-SF-23-260 73.0 74.5 135 1.5 202

DZG-SF-23-260 134.5 136.0 335 1.5 502

DZG-SF-23-260 140.5 141.0 215 0.5 107

DZG-SF-23-268 22.0 25.0 269 3.0 807

DZG-SF-23-270 20.5 21.5 203 1.0 203

DZG-SF-23-270 49.5 52.5 416 3.0 1,248

DZG-SF-23-272 10.0 10.5 276 0.5 138

DZG-SF-23-275 55.5 57.0 2,087 1.5 3,131

DZG-SF-23-277 55.0 57.0 423 2.0 846

DZG-SF-23-277 79.5 81.0 90 1.5 135

DZG-SF-23-279 98.5 100.0 85 1.5 128

DZG-SF-23-280 5.5 7.0 209 1.5 314

DZG-SF-23-282 0.0 1.5 94 1.5 141

DZG-SF-23-282 10.5 12.0 94 1.5 141

DZG-SF-23-283 10.0 11.0 1,492 1.0 1,492

DZG-SF-23-292 46.5 51.0 2,430 4.5 10,933

Including 47.5 50.0 4,174 2.5 10,434

DZG-SF-23-292 56.0 59.5 230 3.5 805

DZG-SF-23-292 100.0 101.5 92 1.5 138

DZG-SF-23-294 61.5 63.0 338 1.5 507

DZG-SF-23-294 67.0 68.0 151 1.0 151

DZG-SF-23-295 40.0 59.5 362 19.5 7,066

Including 50.0 52.5 1,609 2.5 4,023

DZG-SF-23-295 62.5 66.5 223 4.0 892

DZG-SF-23-296 22.5 24.0 206 1.5 309

DZG-SF-23-297 42.0 44.0 329 2.0 658

DZG-SF-23-297 47.0 53.5 173 6.5 1,125

DZG-SF-23-299 39.0 40.5 162 1.5 243

DZG-SF-23-299 49.5 50.5 78 1.0 78

DZG-SF-23-299 54.5 56.0 138 1.5 207

DZG-SF-23-299 59.5 60.5 81 1.0 81

DZG-SF-23-301 42.5 45.5 146 3.0 437

DZG-SF-23-301 53.0 53.5 290 0.5 145

DZG-SF-23-304 34.5 37.5 113 3.0 338

DZG-SF-23-304 46.0 47.0 93 1.0 93

DZG-SF-23-304 64.0 65.0 119 1.0 119

DZG-SF-23-305 75.0 76.5 92 1.5 138

DZG-SF-23-308 34.5 35.5 322 1.0 322

DZG-SF-23-308 43.5 47.5 208 4.0 833

DZG-SF-23-308 61.5 62.5 146 1.0 146

DZG-SF-23-310 48.0 49.5 232 1.5 348

DZG-SF-23-311 51.5 53.0 106 1.5 159

DZG-SF-23-311 61.0 62.0 89 1.0 89

DZG-SF-23-311 68.5 77.5 180 9.0 1,621

DZG-SF-23-312 40.0 43.5 106 3.5 369

DZG-SF-23-313 42.5 51.0 130 8.5 1,102

DZG-SF-23-313 58.5 60.0 84 1.5 126

DZG-SF-23-314 57.0 60.0 82 3.0 246

DZG-SF-23-314 69.0 69.5 342 0.5 171

DZG-SF-23-320 64.5 67.5 173 3.0 519

Underground T28

TD28-23-1950-747 18.0 20.4 128 2.4 307

TD28-23-1950-749 16.8 18.0 101 1.2 121

TD28-23-1950-752 6.0 7.2 104 1.2 124

TD28-23-1950-752 9.6 21.6 858 12.0 10,297

Including 9.6 14.4 1,905 4.8 9,144

TD28-23-1950-978 12.0 13.2 133 1.2 160

TD28-23-1950-979 12.0 19.2 795 7.2 5,726

Including 12.0 14.4 1,562 2.4 3,749

TD28-23-1950-980 12.0 14.4 874 2.4 2,098

TD28-23-1950-982 3.6 4.8 133 1.2 160

TD28-23-1950-985 14.4 21.6 327 7.2 2,357

TD28-23-1950-987 0.0 2.4 96 2.4 230

TD28-23-1950-988 21.6 22.8 191 1.2 229

TD28-23-1950-991 12.0 19.2 249 7.2 1,794

TD28-23-1950-996 13.2 22.8 133 9.6 1,277

TD28-23-1968-874 13.2 14.4 129 1.2 154

TD28-23-1968-975 15.6 16.8 118 1.2 142

TD28-23-1968-976 14.4 15.6 502 1.2 602

TD28-23-1975-634 9.6 10.8 335 1.2 402

TD28-23-1975-635 9.6 10.8 152 1.2 182

TD28-23-1975-636 10.8 20.4 684 9.6 6,568

TD28-23-1975-637 10.8 12.0 162 1.2 194

TD28-23-1975-637 10.8 13.2 323 2.4 775

TD28-23-1975-637 10.8 14.4 241 3.6 866

TD28-23-1975-637 20.4 21.6 94 1.2 113

TD28-23-1975-638 7.2 8.4 141 1.2 169

TD28-23-1975-638 14.4 16.8 115 2.4 276

TD28-23-1975-734 15.6 19.2 78 3.6 279

TD28-23-2000-626 0.0 1.2 82 1.2 98

TD28-23-2000-626 4.8 6.0 808 1.2 970

TD28-23-2000-627 19.2 20.4 162 1.2 194

TD28-23-2000-628 16.8 20.4 163 3.6 585

TD28-23-2000-965 4.8 6.0 113 1.2 136

TD28-23-2000-966 12.0 14.4 928 2.4 2,226