Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AVX.V ·

Altair Expands Land Position to the WEST and North of High Grade Zinc Trench Samples at Crepulje Zinc-Lead-Silver Property, Kosovo

Mergers & Acquisitions Property Options & Staking Sampling & Geoscience Results

#1305 – 1090 West Georgia Street | Vancouver, BC, Canada, V6E 3V7 | Tel: 604 -685-9316 | Fax: 604 -683-1585

RESOURCES INC

ALTAIR EXPANDS LAND POSITION TO THE WEST AND NORTH OF HIGH GRADE ZINC TRENCH SAMPLES

AT CREPULJE ZINC-LEAD-SILVER PROPERTY, KOSOVO

VANCOUVER, BRITISH COLUMBIA – April 21, 2017 ALTAIR RESOURCES INC. (“Altair” or the “Company”)

(TSX-V: AVX; Germany FRA: 90A; ISIN: CA02137W1014; WKN: WKN A2ALMP ) President and CEO , Mr.

Harold (Roy) Shipes, is pleased to announce that the Company has acquired a third mining license that

expands the land position on the Crepulje zinc-lead-silver property, Mitrovica district of Kosovo.

“Based on our interpretation of the gravity survey and the high grade trench samples, it was imperative

we cover anomalies that extend onto this additional land,” stated CEO Harold (Roy) Shipes.

The third license extends the property to the west and north from the original two holdings. A recently

completed gravity survey encountered anomalies extending onto this additional land which is underlain

by the same favourable geological units as the original property holding.

As announced on October 11, 2016, a field program was undertaken on the Crepulje project in May and

June 2016. Three existing trenches were re-exposed and were also extended, and five new trenches were

completed. These new discoveries extended the zone of high-grade lead-zinc mineralization which has

been trenched by approximately an additional 300 metres to over 450 metres.

Eighteen samples were collected from the trenches, and one surface grab sample was collected from a

surface exposure. Five new trenches were completed; trench No. 8 through No. 12. In addition, one

sample (No. 19) was collected from a newly discovered outcrop. Results from these new trenches and

newly discovered outcrop are presented in the following table:

Trench

#

Trench Length

(m)

Sample

#

From

(m)

To

(m)

Length

(m)

Zn

(%)

Pb

(%)

8 15 14 3.1 5.2 2.1 35.8 2.77

15 5.2 7.7 2.5 37.02 1.75

9 14 No mineralization encountered

10 12.5 18 1.7 3.4 1.7 36.57 3.95

11 20.5 6 0 6.4 6.4 1.69 0.43

5 6.4 7.3 0.9 41.39 2.27

4 13.5 15 1.5 34.79 3.66

12 17.7 3 11 11.8 0.8 28.9 5.21

2 13 14.6 1.6 1.09 1.53

1 15.6 16.5 0.9 4.53 2.13

Outcrop n/a 19 n/a n/a n/a 38.28 1.8

2

Portions of trenches 1, 2 and 3, which were originally excavated in 1974, were re-opened, deepened and

widened. Nine samples were collected during this summer’s program. The results of these samples are

presented in the following table:

Trench

#

Trench Length

(m)

Sample

#

From

(m)

To

(m)

Length

(m)

Zn

(%)

Pb

(%)

1/1 30 7 9.2 13.8 4.6 27.9 2.3

8 13.8 17.9 4.1 0.63 0.22

9 17.9 20.7 2.8 34.74 3.36

10 20.7 22.2 1.5 19.7 1.96

2/1 41.3 11 10 12.9 2.9 37.98 4.78

12 12.9 15.8 2.9 14.3 1.97

13 15.8 18.8 3 29.92 3.24

3/1 20.5 16 7 9.5 2.5 32.06 4.02

17 9.5 14.5 5 20.6 2.3

The samples collected during this program were submitted to the ALS Laboratory in Bor, Serbia where

they were initially crushed and pulverized prior to a split being analyzed. The samples were initially

analyzed for 33 elements using the ME-ICP61 technique. Where the samples exceeded the upper limit of

1% for zinc and/or lead they were then analyzed using the Zn-OG62 and Pb-OG62 techniques respectively.

A number of samples exceeded the 30% zinc upper limit and were then analyzed using the Zn-AAORE

technique.

The technical information in this Press Release has been reviewed and approved by Dr. Stewart A. Jackson

PGeo., a Qualified Person under National Instrument 43-101, and a Technical Advisor to the Company.

To learn more about Altair, please visit http://altairresources.com.

ON BEHALF OF THE BOARD,

“Harold Shipes”

Harold Shipes, President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.