Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AVR.V ·

Avaron Announces results from geophysical survey at Tolisnica property, Serbia

Exploration Programs

AVARON MINING CORP.

3847 Vance Road

Cultus Lake, BC V2R 5A6

News Release TSX-V: AVR

Avaron Announces results from geophysical survey at Tolisnica property, Serbia

June 16, 2025 – Vancouver, British Columbia (TSX-V: AVR) Avaron Mining Corp. (the “Company” or

“Avaron”) is pleased to announce the successful completion of a geophysical survey and data

interpretation program on the Tolisnica exploration license, located in central Serbia, approximately 40

km southwest of the town of Kraljevo. The survey aimed to define high -potential copper -cobalt

mineralization associated with altered mafic -ultramafic rocks within the historically productive Vardar

Zone.

This recent work represents a significant step forward in Avaron’s systematic exploration strategy and lays

the foundation for delineating drill-ready targets on the Company’s flagship project.

Geophysical Survey Overview

Conducted in May 2025 by GEO -IN INTERNATIONAL D.O.O., the geophysical campaign utilized Electrical

Resistivity Tomography (ERT) profiling across 15 lines totaling 3,525 meters. Data acquisition was

performed using a state -of-the-art MAE X612EM48+ multi -channel resistivity system, configured with a

VES-type array to optimize detection of subsurface conductive and resistive zones at depths relevant to

near-surface and intermediate mineral systems.

The survey successfully imaged multiple zones of anomalous resistivity interpreted as sulfide -rich zones

and structurally controlled mineralized corridors. Data processing using ZondRes2D and Surfer software

generated six integrated 2D models across the To lisnica property. Interpretation focused on identifying

structural traps, lithological contrasts, and geoelectrical signatures consistent with known styles of

copper-cobalt-silver mineralization observed in prior mapping and historical drilling.

Survey Highlights

• Fifteen ERT profiles completed over four days, covering varied terrain with elevations ranging

from ~700 m to 760 m above sea level.

• Presence of subparallel resistivity lows interpreted as alteration zones or structural corridors.

• Consistency between interpreted anomalies and historical copper- cobalt mineralization in

brecciated diabase and gabbro units.

• Several targets exhibit specific electrical resistivity (SER) values <100 Ω·m, indicative of potential

hydrothermal alteration and/or sulfide mineralization.

• Discrete resistivity highs (>1,000 Ω·m) may represent unaltered, competent host rocks.

Next Steps

Avaron will integrate the ERT data with historical diamond drilling (15 holes totaling 2,325.1 meters),

ground magnetics, and 2018 –2021 rock chip assay results. This comprehensive geological model will

support the design of a maiden drill program, anticipated in 2026. The Company plans to test both near-

surface and down-dip extensions of copper-cobalt mineralization within brecciated diabase and gabbro,

where historical results include intervals of up to 1.1% Cu over 6 meters and surface rock samples

exceeding 5,500 ppm Cu and 1,500 ppm Co (BenzCapTechRpt.pdf and Geophysics _Tolišnica 2025 -

FINAL.pdf).

Qualified person

The scientific and technical contents of this news release have been reviewed and approved by Nick

Tintor, a Qualified Professional Member of the Mining & Metallurgical Society of America and a Qualified

Person for the purposes of NI 43-101.

Annual General Meeting

Avaron further announces that the BC Registrar of Companies has approved the second extension on the

Company’s next Annual General Meeting date. As a result, Avaron is required to hold its Annual General

Meeting for the year 2024 by December 31, 2025.

About Avaron Mining Corp.

Avaron Mining Corp. is a Canadian exploration and project development company focused on advancing

early-stage, high-potential mineral assets and acquiring near-term restart opportunities. The Company’s

flagship asset is the Tolisnica and Stanca copper project located in central Serbia, covering 18.9 km² in the

heart of the Vardar Zone — a prolific metallogenic belt hosting significant past -producing and

undeveloped polymetallic systems.

Avaron is operated by a team of experienced mine developers and capital markets professionals. The

Company combines technical diligence with strategic acquisition to unlock value across the exploration -

to-development spectrum. Its mission is to transform u nderexplored or dormant assets into the next

generation of critical metal producers.

Avaron is earning a 100% interest in the Tolisnica and Stanca Copper Project in Serbia.

For more information please contact:

Miloje Vicentijevic

President and Chief Executive Officer

Avaron Mining Corp.

Telephone: 604.617.1239

Forward-Looking Information: This press release contains forward-looking statements within the meaning of applicable Canadian securities laws.

Such statements include, but are not limited to, exploration results, geological interpretations, planned drill programs, and anticipated outcomes. These

forward-looking statements are based on assumptions and judgments of management regarding future events and results, and are subject to known

and unknown risks, including those disclosed in the Company’s public filings on SEDAR+. Actual results may differ materially. Readers are cautioned not

to place undue reliance on these statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE

POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS

RELEASE.