Grade Control Drilling at Moss Main Zone Continues to Delineate High Grade Shear Corridors with Intersects of 69.65m of 1.63 g/t Au from 4.35m, Including 10.0m of 7.09 g/t Au
Grade Control Drilling at Moss Main Zone Continues to Delineate High Grade
Shear Corridors with Intersects of 69.65m of 1.63 g/t Au from 4.35m, Including
10.0m of 7.09 g/t Au
VANCOUVER, B.C., October 29, 2025: Gold X2 Mining Inc. (TSXV: AUXX / OTCQB: GSHRF /
FWB: 8X00) (“Gold X2” or the “Company”) is pleased to announce the next batch of assay results
from its ongoing grade control drill program, with thirteen shallow holes targeting the marginal to
core shears within the Main Zone at the Moss Gold Project in Northwest Ontario, Canada (the
“Moss Gold Project”).
Michael Henrichsen, CEO of Gold X2, commented, "Our latest drill results continue to
demonstrate excellent continuity of mineralization at the Moss Main zone. These results validate
our geological model that will be utilized in our upcoming Mineral Resource Estimate to be
released in conjunction with the PEA. In addition, the results from grade control drilling will help
define the spacing for the infill drill program as we look toward advancing the Moss Deposit toward
a future feasibility study.”
Highlights
• Logging of the Moss Main grade control program has outlined strongly continuous
lithological domains and traceable shear corridors associated with high-grade mineralized
intercepts.
• Results from thirteen holes continue to confirm the presence of a near-surface high-grade
mineralized core at the center of the Moss Main zone previously defined primarily by
historical drilling. Select drill intercepts include:
o 31.3m of 1.92 g/t Au from 48.7m in MMD-25-199, including
▪ 11.0m of 4.58 g/t Au from 69.0m
o 73.25m of 1.01g/t Au from 9.75m in MMD-25-219, including
▪ 39.0m of 1.28 g/t Au from 20.0m, and
o 51.05m of 1.08 g/t Au from 33.85m in MMD-25-221, including
▪ 10.0m of 2.32 g/t Au from 65.0m
o 19.0m of 2.75 g/t Au from 163.0m in MMD-25-223, including
▪ 6.0m of 7.84 g/t Au from 166.0m
o 69.65m of 1.63 g/t Au from 4.35m in MMD-25-227, including
▪ 10.0m of 7.09 g/t Au from 13.0m
o 80.2 of 1.23 g/t Au from 15.0m in MMD-25-229, including
2
▪ 16.0m of 1.69 g/t Au from 17.0m and
▪ 20.0m of 2.47 g/t Au from 44.0m
Technical Overview
The results of the current grade control drill program are illustrated in the following figures and
tables. Figure 1 shows the location map of the drill holes reported in this release, relative to the
Moss Main grade control drill program. Figure 2 provides a cross-section of drill holes MMD-25-
227, MMD-25-229, MMD-25-231, and MMD-25-233 (assays pending) , representing the third
easternmost section of the pattern. The results are summarized in Tables 1 -2, which include
significant intercepts (Table 1) and drill hole locations (Table 2).
Figure 1: Illustrates the Moss Main grade control drill program.
3
Figure 2: Shows a type section with reported intersections relative to the block model. Note: the block model has
factored volumes that cannot be illustrated on section.
In preparation for the infill drilling campaign, two grade control drilling programs were designed,
one at each the Main and QES zones. The Main Zone pattern covers an area that is 100 meters
along strike, 80 meters across strike and 170-190 meters deep. Drill holes are spaced in a 12.5-
meter diamond-shaped pattern. All hole at the Main zone pattern have been completed with
drilling activities shifted to the QES zone pattern.
These programs aim to investigate the short distance behaviour of gold mineralization, informing
the determination of optimal drill spacing to upgrade Inferred Mineral Resources to Indicated
Mineral Resources in preparation for the upcoming infill program. Additionally, the remaining half
core will supply the required volume of sample for the upcoming feasibility level metallurgical
studies. Finally, the tight spaced drilling provides mining-level precision that will derisk the Mineral
Resource Estimate.
The logging data from the thirteen holes reported herein, and the previous eighteen holes (press
release dated September 10 th, 2025), highlight good continuity of the lithological and shear
domains supporting the resource estimation process. Drilling has outlined a predictable geological
sequence from north to south of a 15-25m wide dacitic volcanic package before a 100m wide
locally sheared epidote-chlorite altered mafic diorite with two 10-20m wide sericite-silica-chlorite
altered sheared diorite dykes and two 10 -20m wide sericite-hematite-silica altered sheared
granodiorite dykes. Drilling has also defined a 3-4m wide shallow dipping mafic dyke.
4
Three independent shear corridors have been defined and constrain the primary high grade
mineralized intersections with additional interconnecting minor shear zones noted between the
corridors associated with lower grade gold mineralization.
The mineralized intersections are moderately to strongly sheared and either sericite -chlorite or
sericite-silica-hematite altered with pyrite and chalcopyrite mineralization. The new holes further
support our understanding that lithological units and shear zones are traceable vertically and
horizontally across the sections with a slightly improved continuity noted along the shallowly
dipping lineation fabric.
Several holes returned intervals above the 30 g/t cut within the high -grade shear corridor
historically targeted by the underground exploration drift including 31.3m of 1.99 g/t Au (1.92 g/t
cut) from 48.7m, including 11.0m of 4.76 g/t Au (4.58 g/t cut) from 69.0m in MMD-25-199, 19.0m
of 4.52 g/t Au (2.75 g/t cut) from 163.0m, including 6.0m of 13.5 g/t Au (7.84 g/t cut) from 166.0m
in MMD-25-223, and 69.65m of 3.20 g/t Au (1.63 g/t cut) from 4.35m, including 10.0m of 18.0 g/t
Au (7.09 g/t cut) from 13.0m in MMD-25-227. The continuity of these very high -grade shears is
encouraging with follow up on separate, more sparsely drilled high grade shears expected to be
completed during the upcoming infill drill program.
Figure 3: Hole MMD-25-227: High grade section of a moderately sheared and sericite-chlorite-silica altered
mineralized diorite yielding an intercept of 10.0m of 7.09 g/t Au (18.0 g/t Au Uncut) from 13.0m, including 1.25m of
17.25 g/t Au from 17.75m and 1.2m of 30g/t Au (121 g/t Uncut) from 20.55m.
5
Table 1: Significant intercepts
HOLE ID FROM TO LENGTH (m) TRUE WIDTH
(m)
CUT GRADE
(g/t Au)
UNCUT GRADE
(g/t Au)
MMD-25-199 5.00 42.55 37.55 26.8 0.62 0.62
MMD-25-199 20.00 27.00 7.00 5.0 1.11 1.11
MMD-25-199 48.70 80.00 31.30 22.5 1.92 1.99
MMD-25-199 69.00 80.00 11.00 7.9 4.58 4.76
MMD-25-199 93.00 102.90 9.90 7.2 0.40 0.40
MMD-25-199 111.20 117.80 6.60 4.8 0.47 0.47
MMD-25-199 126.00 132.00 6.00 4.4 1.73 1.73
MMD-25-199 126.00 130.00 4.00 2.9 2.26 2.26
MMD-25-218 9.00 15.00 6.00 4.2 0.37 0.37
MMD-25-218 28.10 35.00 6.90 4.9 1.18 1.18
MMD-25-218 28.10 35.00 6.90 4.9 1.18 1.18
MMD-25-218 41.80 104.65 62.85 44.7 0.61 0.61
MMD-25-218 41.80 45.00 3.20 2.3 1.06 1.06
MMD-25-218 62.00 68.05 6.05 4.3 1.78 1.78
MMD-25-218 80.35 84.00 3.65 2.6 1.29 1.29
MMD-25-218 111.00 114.00 3.00 2.1 1.18 1.18
MMD-25-218 112.00 114.00 2.00 1.4 1.42 1.42
MMD-25-218 121.75 125.00 3.25 2.3 0.41 0.41
MMD-25-218 132.00 177.00 45.00 32.5 0.76 0.76
MMD-25-218 132.00 134.00 2.00 1.4 1.72 1.72
MMD-25-218 138.00 148.50 10.50 7.6 1.54 1.54
MMD-25-218 170.00 172.00 2.00 1.4 2.00 2.00
MMD-25-218 185.90 191.85 5.95 4.3 1.34 1.34
MMD-25-218 185.90 191.85 5.95 4.3 1.34 1.34
MMD-25-219 9.75 83.00 73.25 52.3 1.01 1.01
MMD-25-219 12.00 17.00 5.00 3.6 1.07 1.07
MMD-25-219 20.00 59.00 39.00 27.8 1.28 1.28
MMD-25-219 66.00 70.00 4.00 2.9 1.78 1.78
MMD-25-219 108.00 130.00 22.00 16.0 1.80 1.80
MMD-25-219 110.00 112.00 2.00 1.4 2.20 2.20
MMD-25-219 119.00 129.00 10.00 7.3 2.94 2.94
MMD-25-219 136.00 138.00 2.00 1.5 0.36 0.36
MMD-25-219 150.00 152.00 2.00 1.5 0.67 0.67
MMD-25-220 2.45 9.00 6.55 4.6 0.41 0.41
MMD-25-220 32.00 40.00 8.00 5.7 0.46 0.46
MMD-25-220 56.00 58.00 2.00 1.4 0.60 0.60
MMD-25-220 67.30 75.40 8.10 5.9 0.31 0.31
MMD-25-220 84.00 99.50 15.50 11.2 1.02 1.02
MMD-25-220 91.00 99.50 8.50 6.2 1.52 1.52
MMD-25-220 120.00 125.00 5.00 3.6 0.66 0.66
MMD-25-220 133.00 177.00 44.00 32.3 1.09 1.09
MMD-25-220 139.00 176.00 37.00 27.1 1.23 1.23
6
MMD-25-220 183.00 196.00 13.00 9.6 0.44 0.44
MMD-25-220 209.00 222.00 13.00 9.6 0.57 0.57
MMD-25-221 33.85 84.90 51.05 35.9 1.08 1.08
MMD-25-221 34.55 40.00 5.45 3.8 2.20 2.20
MMD-25-221 65.00 75.00 10.00 7.1 2.32 2.32
MMD-25-221 103.00 119.00 16.00 11.4 1.10 1.10
MMD-25-221 103.00 116.00 13.00 9.2 1.30 1.30
MMD-25-221 134.00 137.00 3.00 2.1 0.35 0.35
MMD-25-221 146.55 159.00 12.45 8.9 1.89 1.89
MMD-25-221 146.55 158.00 11.45 8.2 1.99 1.99
MMD-25-221 171.00 173.00 2.00 1.4 0.59 0.59
MMD-25-221 180.00 183.00 3.00 2.2 0.71 0.71
MMD-25-222 7.00 14.00 7.00 5.0 0.51 0.51
MMD-25-222 35.00 37.35 2.35 1.7 2.63 2.63
MMD-25-222 46.00 55.00 9.00 6.5 0.46 0.46
MMD-25-222 68.00 75.45 7.45 5.4 0.85 0.85
MMD-25-222 90.00 93.00 3.00 2.2 0.55 0.55
MMD-25-222 99.00 128.00 29.00 21.1 0.93 0.93
MMD-25-222 107.60 114.65 7.05 5.1 1.66 1.66
MMD-25-222 122.00 128.00 6.00 4.4 1.49 1.49
MMD-25-222 140.50 154.00 13.50 9.9 0.39 0.39
MMD-25-222 171.00 188.10 17.10 12.6 0.55 0.55
MMD-25-222 181.00 183.00 2.00 1.5 1.46 1.46
MMD-25-222 224.00 227.00 3.00 2.2 0.33 0.33
MMD-25-223 17.00 26.70 9.70 6.8 2.00 2.00
MMD-25-223 40.20 47.00 6.80 4.8 0.35 0.35
MMD-25-223 60.00 64.00 4.00 2.9 0.87 0.87
MMD-25-223 84.00 106.00 22.00 15.8 1.20 1.20
MMD-25-223 85.00 96.00 11.00 7.9 2.03 2.03
MMD-25-223 123.00 134.00 11.00 8.0 0.69 0.69
MMD-25-223 128.00 130.00 2.00 1.5 1.76 1.76
MMD-25-223 163.00 182.00 19.00 14.0 2.75 4.52
MMD-25-223 166.00 172.00 6.00 4.4 7.84 13.5
MMD-25-223 199.00 207.00 8.00 5.9 1.15 1.15
MMD-25-223 199.00 205.25 6.25 4.6 1.29 1.29
MMD-25-225 10.00 20.00 10.00 7.1 2.49 2.49
MMD-25-225 11.00 20.00 9.00 6.4 2.68 2.68
MMD-25-225 25.45 32.20 6.75 4.8 0.73 0.73
MMD-25-225 37.75 50.00 12.25 8.8 0.72 0.72
MMD-25-225 46.00 49.00 3.00 2.2 1.49 1.49
MMD-25-225 70.00 73.00 3.00 2.2 0.46 0.46
MMD-25-225 83.75 87.00 3.25 2.4 3.38 3.38
MMD-25-225 83.75 87.00 3.25 2.4 3.38 3.38
MMD-25-225 108.00 116.00 8.00 5.8 1.03 1.03
MMD-25-225 109.00 112.00 3.00 2.2 2.20 2.20
MMD-25-225 127.00 130.45 3.45 2.5 0.68 0.68
7
MMD-25-225 143.00 154.00 11.00 8.1 1.87 1.87
MMD-25-225 143.00 145.25 2.25 1.7 3.05 3.05
MMD-25-225 177.00 199.00 22.00 16.4 1.42 1.42
MMD-25-225 185.00 198.20 13.20 9.9 2.17 2.17
MMD-25-225 221.00 231.00 10.00 7.5 0.52 0.52
MMD-25-226 6.00 8.80 2.80 2.0 1.12 1.12
MMD-25-226 14.65 24.20 9.55 6.8 0.76 0.76
MMD-25-226 17.20 19.50 2.30 1.6 1.85 1.85
MMD-25-226 33.00 42.00 9.00 6.4 0.42 0.42
MMD-25-226 73.65 83.00 9.35 6.7 0.38 0.38
MMD-25-226 89.00 122.00 33.00 23.6 1.00 1.00
MMD-25-226 89.00 91.00 2.00 1.4 3.63 3.63
MMD-25-226 104.00 113.10 9.10 6.5 1.78 1.78
MMD-25-226 129.00 142.00 13.00 9.3 1.72 1.72
MMD-25-226 158.00 184.00 26.00 18.8 0.42 0.42
MMD-25-226 202.40 220.00 17.60 12.8 0.35 0.35
MMD-25-227 4.35 74.00 69.65 49.1 1.63 3.20
MMD-25-227 5.00 9.45 4.45 3.1 1.28 1.28
MMD-25-227 13.00 23.00 10.00 7.0 7.09 18.0
MMD-25-227 38.00 42.00 4.00 2.8 1.18 1.18
MMD-25-227 52.20 61.60 9.40 6.7 1.55 1.55
MMD-25-227 82.00 87.00 5.00 3.6 0.80 0.80
MMD-25-227 100.10 118.00 17.90 12.9 1.56 1.56
MMD-25-227 103.00 114.35 11.35 8.2 2.21 2.21
MMD-25-227 134.15 145.65 11.50 8.3 1.14 1.14
MMD-25-227 135.25 137.80 2.55 1.8 2.76 2.76
MMD-25-229 15.00 95.20 80.20 56.5 1.23 1.23
MMD-25-229 17.00 33.00 16.00 11.2 1.69 1.69
MMD-25-229 44.00 64.00 20.00 14.1 2.47 2.47
MMD-25-229 102.00 113.00 11.00 7.9 1.17 1.17
MMD-25-229 102.00 111.00 9.00 6.4 1.25 1.25
MMD-25-229 120.00 139.00 19.00 13.7 1.98 1.98
MMD-25-229 128.00 136.00 8.00 5.8 4.00 4.00
MMD-25-229 154.00 168.00 14.00 10.2 0.96 0.96
MMD-25-229 159.00 161.00 2.00 1.5 1.08 1.08
MMD-25-230 24.00 31.00 7.00 5.0 0.41 0.41
MMD-25-230 43.55 46.30 2.75 2.0 0.87 0.87
MMD-25-230 62.00 99.00 37.00 26.6 0.92 0.92
MMD-25-230 65.00 67.75 2.75 2.0 2.19 2.19
MMD-25-230 85.00 92.00 7.00 5.0 2.14 2.14
MMD-25-230 106.00 116.00 10.00 7.2 0.62 0.62
MMD-25-230 136.00 148.00 12.00 8.7 0.90 0.90
MMD-25-230 141.25 147.00 5.75 4.2 1.21 1.21
MMD-25-230 155.00 174.00 19.00 13.8 1.37 1.37
MMD-25-230 156.00 163.00 7.00 5.1 2.60 2.60
MMD-25-230 195.00 202.00 7.00 5.1 1.35 1.35
8
MMD-25-230 199.00 202.00 3.00 2.2 2.32 2.32
MMD-25-231 41.00 50.00 9.00 6.3 0.37 0.37
MMD-25-231 56.35 65.00 8.65 6.1 0.45 0.45
MMD-25-231 71.00 92.00 21.00 14.9 0.51 0.51
MMD-25-231 78.00 81.00 3.00 2.1 1.45 1.45
MMD-25-231 110.00 129.00 19.00 13.7 1.33 1.33
MMD-25-231 110.00 112.00 2.00 1.4 2.09 2.09
MMD-25-231 120.00 127.00 7.00 5.0 2.29 2.29
MMD-25-231 151.00 177.00 26.00 18.9 1.22 1.22
MMD-25-231 156.00 163.00 7.00 5.1 2.49 2.49
MMD-25-231 170.00 173.00 3.00 2.2 2.92 2.92
MMD-25-231 190.00 193.00 3.00 2.2 0.37 0.37
Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste
interval of 5 metres. Shaded intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in
bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are
approximate and assume a subvertical body.
Table 2: Drill Collars
HOLE EAST NORTH RL AZIMUTH DIP EOH
MMD-25-199 668,833 5,379,122 430 149.5 -44.6 141.00
MMD-25-218 668,819 5,379,165 433 148.9 -45.6 195.00
MMD-25-219 668,901 5,379,182 431 150.4 -45.4 162.00
MMD-25-220 668,810 5,379,181 435 150.6 -45.0 222.00
MMD-25-221 668,892 5,379,197 431 150.3 -46.0 186.00
MMD-25-222 668,813 5,379,192 437 149.8 -44.9 231.00
MMD-25-223 668,883 5,379,213 432 149.4 -45.1 207.00
MMD-25-225 668,874 5,379,227 433 150.7 -44.8 231.00
MMD-25-226 668,825 5,379,189 437 149.5 -45.2 222.00
MMD-25-227 668,898 5,379,170 431 149.1 -45.5 150.00
MMD-25-229 668,889 5,379,185 431 151.4 -45.5 171.00
MMD-25-230 668,822 5,379,177 435 149.7 -44.9 207.00
MMD-25-231 668,880 5,379,201 431 150.5 -45.5 195.00
Details of the Moss Gold Project Mineral Resource Estimate are provided in a technical report
with an effective date of January 31, 2024, prepared in accordance with NI 43-101 standards,
which is filed under the Company’s SEDAR+ profile.
Analytical and QA/QC Procedures