Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AUXX.V ·

Additional High - Grade Shears in the QES Zone at the Moss Lake Gold Project

Drill Results

EE

Goldshore

Intersects

Additional High

-

Grade Shears in the QES Zone

at the Moss Lake

Gold Project

VANCOUVER, B.C.,

November

2

8

,

202

2

:

Goldshore Resources Inc.

(TSXV: GSHR / OTCQB:

GSHRF / FWB: 8X00)

(“

Goldshore

” or the “

Company

”),

is

pleased

to

announce assay

results

from

its

ongoing

100,000

-

meter

drill

program

at

the

Moss

Lake

Project

in

Northwest

Ontario,

Canada (the “

Moss Lake Gold Project

”).

Highlights:

Results for

seven

holes

,

drilled to

expand the coverage of the

high

-

grade shears in the

QES

Zone,

have

confirmed

high

er

-

grade

shear

-

hosted

gold mineralization within

a

large volume of

well

mineralized

diorite

s

. These results are all within the $1500

Whittle pit that constrains the current resource and identifies new h

igh

-

grade

shears.

B

est

intercepts

include

:

o

1.51 g/t Au over 6.0m from 502.0m depth in MQD

-

22

-

075 and

o

1.47 g/t Au over 30.1m from 530

.0

m

o

8.45

g/t Au over 5

.0

m from 576m

depth in MQD

-

22

-

076

including

36.9 g/t Au over 1

.0

m from 577m

o

1.87 g/t Au over

6.75m from 602.25m

o

1.31 g/t Au over 14.15m from 544.0m

depth in MQD

-

22

-

080

o

2.07 g/t Au over 6

.0

m from 422

.0

m depth in MQD

-

22

-

085 and

o

1.07 g/t Au over 15

.0

m from 457

.0

m

o

1.26 g/t Au over 7.15m from 573.85m

o

1.07 g/t Au over 24.7m from 369

.0

m

depth in

MQD

-

22

-

087

and

o

2.15 g/t Au over 5

.0

m from 489

.0

m

o

1.75 g/t Au over 8.05m from 513.95m

o

2.11 g/t Au over 30.75m from 536.9m

including

11.5 g/t Au over 3.1m from 555.2m

o

1.31 g/t Au over 63.6m from 427

.0

m

depth i

n MQD

-

22

-

090A

2.07 g/t Au over 32

.0

m from

439

.0

m

A

new

parallel mineralized shear structure has been

discovered

150m south of the

main QES system containing high grade mineralization within

a

sheared intermediate

volcanic package

with best intercepts of:

o

3.44 g/t Au over 5.8m from 246.4m

depth in MQD

-

22

-

08

0

2

o

1.22 g/t Au over 4.0m from 206.0m depth in MQD

-

22

-

087

o

1.15 g/t Au over 7.3m from 75.0m

depth in MQD

-

22

-

090A

President and CEO Brett Richards stated:

“

The results from these drill holes in the QES Zone are

part of

a

52

-

hole data set that was not included in the recent

mineral r

esource

estimate

. They

confirm our belief that there are additional high

-

grade shear zones within the deposit that will

potential

ly

add to the shear domain component of the

m

ineral

r

esource

that we anticipate will be

prioritized in the mining schedule when we

move towards conducting a preliminary economic

analysis next year.

”

Technical Overview

Figure 1 shows the better

intercepts in pla

i

n view and Figure 2 is a typical section through hole

M

Q

D

-

22

-

0

87

.

Table 1 shows the significant intercepts. Table 2 shows the drill hole locations.

Figure

1

: Drill plan showing

best of several +1 g/t Au intercepts

relative to

shear and intrusion domains

3

Figure

2

: Drill

section through M

Q

D

-

22

-

0

087

relative

to

shear and intrusion domains

Results have been received for six holes that have infilled areas of the QES Zone that are between

sections drilled by historic holes with collar survey problems. As a result, they will replace the low

-

confidence historic holes in

the upcoming resource mod

el update.

A seventh hole was drilled to the southeast of the QES Zone to investigate

two historical showing

along a parallel structure of the QES Zone

but did not intersect significant mineralization.

As with the historic holes, these holes intersected s

everal broad zones of low

-

grade mineralization

within the altered diorite intrusion host. Examples include

0.77 g/t Au over 83m from 493m

depth

in MQD

-

22

-

075

;

0.41 g/t Au over 32.45m from 437.55m

and

0.71 g/t Au over 131.1m from 493m

in MQD

-

22

-

076

;

0.54 g/t Au over 102m from 476m

and

0.39 g/t Au over 27.95m from 643m in

MQD

-

22

-

080

;

0.78 g/t Au over 70m from 419m

and

0.5

0

g/t Au over 28.75m from 521.25m in

MQD

-

22

-

085

;

0.50 g/t Au over 115.9m from 408.1m

in MQD

-

22

-

087

; and

0.48 g/t Au

over

27.45m from 552.05m in MQD

-

22

-

090A

.

All these low

-

grade zones occur as envelopes to higher

-

grade structures that form a three

-

dimensional, anastomosing shear network that has developed in response to strain on the altered

diorite intrusion. Results in

clude the broad zones of +1 g/t Au mineralization shown in the

highlights (e.g.,

1.31 g/t Au over 63.6m from 427m

depth in MQD

-

22

-

090A

) and several narrow

high

-

grade intervals, including

10.1 g/t Au over 0.7m from 545.8m

and

36.9 g/t Au over 1m from

577m

i

n MQD

-

22

-

076

;

10

.0

g/t Au over 1m from 427m in MQD

-

22

-

085

;

20.6 g/t Au over 0.9m

from 370.65m

,

28.3 g/t Au over 0.3m from 540.3m

and

11.5 g/t Au over 3.1m from 555.2m

in

MQD

-

22

-

087

; and

19.4 g/t Au over 1.15m from 455.85m

in MQD

-

22

-

090A

.

An

additional parallel shear was discovered

within the

intermediate

volcanic package

approximately 150m south of the main QES system which contains broad intercepts of low

-

grade

mineralization including

0.91 g/t over 24.8m from 246.4m

in MQD

-

22

-

08

0;

0.33 g/t

over 45.7m

from 150.0m in MQD

-

22

-

085

;

0.42 g/t over 39.0m from 189.0m in MQD

-

22

-

087

containing internal

4

higher grade intercepts including

3.44 g/t Au over 5.8m from 246.4m

depth in MQD

-

22

-

08

0

; 1

.22

g/t Au over 4.0m from 206.0m depth in MQD

-

22

-

087;

1.15 g/t Au over 7.3m from 75.0m

depth in

MQD

-

22

-

090A

.

Importantly, these intercepts have identified additional high

-

grade shears not modelled in the

recent Mineral Resource.

Pete Flindell, VP Explorat

ion for Goldshore, said

,

“

These drill results confirm

high

-

grade shears

that we have modelled at the QES Zone and confirmed additional shears that we

expect to

include

in the next

m

ineral

r

esource update early next year

.”

Table

1

: Significant downhole gold intercepts

HOLE ID

FROM

TO

LENGTH

(m)

TRUE

WIDTH (m)

CUT

GRADE

(g/t Au)

UNCUT

GRADE

(g/t Au)

MQD

-

22

-

075

243.00

264.00

21.00

15.4

0.47

0.47

including

254.00

256.40

2.40

1.8

1.54

1.54

468.00

476.90

8.90

6.8

0.45

0.45

493.00

576.00

83.00

64.6

0.77

0.77

including

502.00

508.00

6.00

4.6

1.51

1.51

and

530.00

560.10

30.10

23.5

1.47

1.47

595.25

610.00

14.75

11.7

0.54

0.54

including

596.00

599.00

3.00

2.4

1.13

1.13

MQD

-

22

-

076

192.00

196.00

4.00

2.8

0.46

0.46

214.00

216.00

2.00

1.4

0.39

0.39

355.00

358.15

3.15

2.4

0.38

0.38

437.55

470.00

32.45

25.0

0.41

0.41

including

453.00

456.70

3.70

2.9

1.52

1.52

483.50

489.40

5.90

4.6

0.35

0.35

493.00

624.10

131.10

103.8

0.71

0.77

including

545.80

546.50

0.70

0.6

10.1

10.1

and

576.00

581.00

5.00

4.0

7.07

8.45

including

577.00

578.00

1.00

0.8

30.0

36.9

and

602.25

609.00

6.75

5.4

1.87

1.87

641.00

644.00

3.00

2.4

0.46

0.46

MQD

-

22

-

080

82.75

86.60

3.85

2.6

0.35

0.35

131.40

143.75

12.35

8.5

0.63

0.63

181.30

187.80

6.50

4.6

0.40

0.40

209.90

220.85

10.95

7.7

0.57

0.57

246.40

271.20

24.80

17.7

0.91

0.91

including

246.40

252.20

5.80

4.1

3.44

3.44

355.00

369.00

14.00

10.2

0.57

0.57

including

361.70

363.70

2.00

1.5

1.67

1.67

382.00

385.45

3.45

2.5

0.63

0.63

398.50

401.30

2.80

2.1

0.58

0.58

5

418.00

421.00

3.00

2.2

0.54

0.54

429.20

434.00

4.80

3.6

0.35

0.35

458.00

460.70

2.70

2.0

0.59

0.59

476.00

578.00

102.00

79.7

0.54

0.54

including

524.00

528.00

4.00

3.1

1.32

1.32

and

544.00

558.15

14.15

11.2

1.31

1.31

613.00

616.00

3.00

2.4

0.37

0.37

624.10

633.00

8.90

7.3

0.30

0.30

643.00

670.95

27.95

23.1

0.39

0.39

MQD

-

22

-

085

63.60

74.10

10.50

7.1

0.38

0.38

116.15

118.35

2.20

1.5

1.57

1.57

150.00

195.70

45.70

32.2

0.33

0.33

248.00

250.00

2.00

1.4

0.39

0.39

256.00

258.00

2.00

1.4

0.41

0.41

284.80

288.05

3.25

2.4

0.91

0.91

including

286.00

288.05

2.05

1.5

1.30

1.30

337.00

342.00

5.00

3.7

0.30

0.30

362.00

371.65

9.65

7.2

0.31

0.31

382.45

388.00

5.55

4.1

0.30

0.30

390.80

410.90

20.10

15.0

0.31

0.31

419.00

489.00

70.00

53.1

0.78

0.78

including

422.00

428.00

6.00

4.5

2.07

2.07

including

427.00

428.00

1.00

0.8

10.0

10.0

and

443.00

446.00

3.00

2.3

1.09

1.09

and

457.00

472.00

15.00

11.4

1.07

1.07

and

481.00

485.00

4.00

3.1

2.10

2.10

506.00

508.00

2.00

1.5

0.67

0.67

521.25

550.00

28.75

22.4

0.50

0.50

573.85

581.00

7.15

5.7

1.26

1.26

665.20

671.55

6.35

5.1

0.35

0.35

MQD

-

22

-

087

78.00

81.55

3.55

2.4

0.43

0.43

92.00

109.00

17.00

11.6

0.33

0.33

189.00

228.00

39.00

27.3

0.42

0.42

including

206.00

210.00

4.00

2.8

1.22

1.22

249.75

261.00

11.25

8.0

0.49

0.49

289.50

298.70

9.20

6.6

0.42

0.42

including

294.50

296.65

2.15

1.6

1.07

1.07

342.00

349.65

7.65

5.6

0.40

0.40

369.00

393.70

24.70

18.2

1.07

1.09

including

370.65

371.55

0.90

0.7

20.6

20.6

408.10

524.00

115.90

87.3

0.50

0.50

including

425.30

429.50

4.20

3.1

1.28

1.28

and

489.00

494.00

5.00

3.8

2.15

2.15

and

513.95

522.00

8.05

6.1

1.75

1.75

6

536.90

567.65

30.75

23.6

2.11

2.11

including

539.55

567.65

28.10

21.6

2.23

2.23

including

540.30

540.60

0.30

0.2

28.3

28.3

and

555.20

558.30

3.10

2.4

11.5

11.5

579.00

592.00

13.00

10.1

0.37

0.37

628.65

634.00

5.35

4.2

0.48

0.48

MQD

-

22

-

090A

75.00

82.30

7.30

3.8

1.15

1.15

including

78.00

81.55

3.55

1.8

2.05

2.05

94.00

98.00

4.00

2.1

0.54

0.54

133.00

146.00

13.00

7.0

0.35

0.35

193.00

196.00

3.00

1.6

0.39

0.39

227.70

230.60

2.90

1.6

0.53

0.53

238.55

240.85

2.30

1.3

0.42

0.42

245.00

252.25

7.25

4.0

0.35

0.35

287.35

292.75

5.40

3.0

0.44

0.44

427.00

490.60

63.60

37.7

1.31

1.31

including

427.00

429.00

2.00

1.2

1.10

1.10

and

439.00

471.00

32.00

19.0

2.07

2.07

including

455.85

457.00

1.15

0.7

19.4

19.4

503.85

508.00

4.15

2.5

0.73

0.73

519.00

541.00

22.00

13.3

0.35

0.35

including

525.00

527.00

2.00

1.2

1.47

1.47

552.05

579.50

27.45

16.8

0.48

0.48

including

574.00

576.00

2.00

1.2

1.14

1.14

Intersections calculated above a

t

0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste

interval of 10 metres. Shaded intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold

are those with a grade thicknes

s factor exceeding 20 gram x metres / tonne gold. True widths are approximate

and assume a subvertical body.

Table

2

: Location of drill holes in this press release

HOLE

EAST

NORTH

RL

AZIMUTH

DIP

EOH

MQD

-

22

-

075

670,308

5,379,250

443

336

°

-

47

°

675.1

MQD

-

22

-

076

670,379

5,379,296

442

338

°

-

47

°

651

.0

MQD

-

22

-

080

670,462

5,379,398

450

335

°

-

50

°

675.05

MQD

-

22

-

083

670,667

5,379,431

433

156

°

-

50

°

630.1

MQD

-

22

-

085

670,636

5,379,537

441

336

°

-

49

°

675

.0

MQD

-

22

-

087

670,546

5,379,463

449

336

°

-

49

°

675

.0

MQD

-

22

-

090A

670,654

5,379,625

429

346

°

-

60

°

606

.0

Approximate collar c

oordinates in NAD 83, Zone 15N

7

Analytical and QA/QC Procedures

All samples were sent to ALS Geochemistry in Thunder Bay for

preparation and analysis was

performed in the ALS Vancouver analytical facility. ALS is accredited by the Standards Council of

Canada (SCC) for the Accreditation of Mineral Analysis Testing Laboratories and CAN

-

P

-

4E

ISO/IEC 17025. Samples were analyzed for

gold via fire assay with an AA finish (“Au

-

AA23”) and

48 pathfinder elements via ICP

-

MS after four

-

acid digestion (“ME

-

MS61”). Samples that assayed

over 10 ppm Au were re

-

run via fire assay with a gravimetric finish (“Au

-

GRA21”).

In addition to ALS

quality assurance / quality control (“QA/QC”) protocols, Goldshore has

implemented a quality control program for all samples collected through the drilling program. The

quality control program was designed by a qualified and independent third party, with

a focus on

the quality of analytical results for gold. Analytical results are received, imported to our secure on

-

line database and evaluated to meet our established guidelines to ensure that all sample batches

pass industry best practice for analytical qu

ality control. Certified reference materials are

considered acceptable if values returned are within three standard deviations of the certified value

reported by the manufacture of the material. In addition to the certified reference material, certified

bl

ank material is included in the sample stream to monitor contamination during sample

preparation. Blank material results are assessed based on the returned gold result being less

than ten times the quoted lower detection limit of the analytical method. The

results of the on

-

going analytical quality control program are evaluated and reported to Goldshore by Orix

Geoscience Inc.

About Goldshore

Goldshore is an emerging junior gold development company, and owns the Moss Lake Gold

Project located in Ontario.

We

sdome Gold Mines Ltd.

is currently a

large

shareholder of

Goldshore with an approximate

2

7

%

equity

position in the Company.

Well

-

financed and

supported by an industry

-

leading management group,

board of directors and advisory board,

Goldshore is positioned to advance the Moss Lake Gold Project through the next stages of

exploration

and development

.

About the Moss Lake Gold Project

The Moss Lake Gold Project is located approximately 100 km west of

the city of Thunder Bay,

Ontario. It is accessed via Highway 1

1

which passes within 1 km of the property boundary to the

north.

The Moss Lake Gold Project covers 14,292 hectares and consists of 282 unpatented and

patented mining claims.

The Moss Lake Gol

d Project hosts a number of gold and base metal rich deposits including the

Moss Lake Deposit

(Table 3)

, the East Coldstream Deposit (

T

able

4

), the historically producing

North Coldstream Mine (

T

able 5

), and the Hamlin Zone, all of which occur over a mineralized

trend exceeding 20 km in length.

The Moss Lake Deposit hosts

an estimated

inferred mineral resource of

4.17

Moz Au (see

Goldshore’

s news release dated November 15

, 2022).

A technical report is b

eing prepared in

accordance with National Instrument 43

-

101 (

“

NI 43

-

101

”

) and will be available on the Company's

website and SEDAR

within

45 days of November 1

5

, 2022.

8

A historical mineral resource estimate (the “

East Coldstream Historical

Estimate

”) was

completed on the East Coldstream Deposit in 2011 by Foundation Resources Inc.

2

,3

The East

Coldstream Deposit is a shear

-

hosted disseminated

-

style gold deposit which locally outcrops at

surface. It has been drilled over a 1.3 km length and to

depths of 200 m with 138 holes completed

between 1988 and 2017. The deposit remains largely open at depth and may have the potential

for expansion along strike.

Historic drill hole highlights from the East Coldstream Deposit include

4.86 g/t Au over 27.3

m in C

-

10

-

15.

The historically producing North Coldstream Mine is reported to have produced significant

amounts of copper, gold and silve

r

4

from mineralization with potential iron

-

oxide

-

copper

-

gold

deposit style affinity. The exploration potential immediat

ely surrounding the historic mining area

is not currently well understood and historic data compilation is required.

The Hamlin Zone is a significant occurrence of copper and gold mineralization, and also of

potential iron

-

oxide

-

copper

-

gold deposit style a

ffinity. Between 2008 and 2011, Glencore tested

Hamlin with 24 drill holes which successfully outlined a broad and intermittently mineralized zone

over a strike length of 900 m.

Historic drill hole highlights from the Hamlin Zone include 0.9 g/t Au

and 0.3

5% Cu over 150.7 m in HAM

-

11

-

75.

The Moss Lake, East Coldstream and North Coldstream deposits sit on a mineral trend marked

by a regionally significant deformation zone locally referred to as the Wawiag Fault Zone in the

area of the

Moss Lake

Deposit

. This deformation zone occurs over a length of approximately 20

km on the Moss Lake Gold Project and there is an area spanning approximately 7 km between

the Moss Lake and East Coldstream deposits that is significantly underexplored.

T

able

3

:

Mineral Resource Estimate (Moss Lake Deposit)

1

Inferred Resources (Domains)

Tonnes

(Mt)

Grade

(g/t Au)

Contained Metal

(Moz AU)

Shear

34.7

2.0

2.20

Intrusion

87

0.7

1.97

TOTAL

121.7

1.1

4.17

Notes:

(1

)

The Moss Lake Deposit hosts an estimated inferred mineral resource of 4.17Moz Au (see Goldshore’s news release

dated November 15, 2022). A technical report is being prepared in accordance with

NI 43

-

101

and will be available on the

Company's website and

SEDAR within 45 days of November 15, 2022.

T

able

4

: Historical Mineral Resources

(East Coldstream Deposit)

2

,3

INDICATED

INFERRED

Tonnes

Grade (g/t

Au)

Oz Au

Tonnes

Grade (g/t

Au)

Oz Au

East Coldstream Total

3,516,700

0.85

96,400

30,533,000

0.78

763,276

Notes:

(2

)

Source: McCracken, T. “Technical Report and Resource Estimate on the Osmani Gold Deposit, Coldstream Property,

Northwestern Ontario”, prepared for Foundation Resources Inc. and Alto Ventures Ltd.

The East Coldstream