Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AUME.V ·

Kintavar intersects hydrothermal-type mineralization at GB1 Zone, Wabash Project

Drill Results

NEWS RELEASE

For immediate distribution

Kintavar intersects hydrothermal-type mineralization at GB1 Zone,

Wabash Project

• 2.64% Cu, 0.72 g/t Au, 16.2 g/t Ag with Cobalt and Vanadium over 0.3m

near surface

Montreal, Qu ebec, April 26, 20 22 – Kintavar Exploration Inc. (the “Corporation” or “ Kintavar”)

(TSX-V: KTR), is pleased to announce the results for its 3 final Wabash drill holes from the drilling

program that was completed in December 2021. These 3 holes targeted the GB1 mineralized zone

that had been identified in the summer of 2021 and subsequently returned high grade results from

surface (see press release September 28, 2021).

The GB1 zone presents a distinct mineralized context that was not previously observed either at

the Mitchi or Wabash properties. The mineralization is associated with sem i-massive sulfides in

veins and veinlets. The mineralization is associated with an IP anomaly of at least 600m and

appears to be getting wider at depth. The exact geological context of mineralization remains to be

clarified with more work, but its characteristics currently are the presence of copper, gold, silver

and even cobalt and vanadium (up to 654ppm and 170 ppm respectively) at a geological contact

of two gneiss units. A total of three holes and a trench have now successfully intersected this unit

confirming that it remains open N-S and at depth.

To better understand the mineralization, the core at WAB -21-18 and WAB -21-19 ha d been

resampled and sent for assays which caused the additional delay in getting the final results. This

allowed management to better evaluate the grade in the actual mineralized intervals without

dilution from the encasing host rock.

The Corporation has now engaged a geophysics contractor to conduct a DeepEM survey which

can better identify massive and semi -massive sulfide mineralization at depth up to 500m. The

survey will help define targets for summer 2022 drilling program and results will be made available

to shareholders accordingly.

MLI Corridor

The same geophysical contractor will help conduct an IP survey on the MLI corridor which will

target the high-grade mineralized horizon intersected in hole WAB-21-21 (1.01% Cu & 19.3 g/t Ag

over 16.8m). All the geophysics work is expected to take place in May 2022 and the data will be

used for the summer 2022 surface and drilling programs.

“We are very encouraged having identified this high-grade hydrothermal-type mineralization that

remains open at depth and N-S. The first shallow investigations were positive, and we believe the

DeepEM survey will provide a better tool to target the widest zones of this mineralization. Having

- 2 -

this new geological context within the sedimentary basin is very encouraging. We are seeing that

multiple events have contributed to metal rich fluids circulation in the area, making the entire

region fertile for base and precious metals. The geophysical program should give us the needed

information to better target both MLI and GB1 mineralization and help us prepare for a successful

summer drilling program.” commented Kiril Mugerman, President & CEO of Kintavar Exploration.

All samples have been sent and prepared (PREP -31) by ALS Global laboratory in Val -d’Or. Gold is

analysed in Val d’Or using fire assay method (AU -AA25) with g ravimetric finish (Au -GRA21) for

samples higher than 0.5 ppm Au. For base metals and silver, the pulp was sent to ALS Global

laboratory in Vancouver for multi -elemental analysis by four acid digestion (ME -ICP61) with ICP-

AES finish. Samples with assays hi gher than 10,000 ppm Cu, Zn or Pb, or 100 ppm Ag were

reanalyzed with over limits methods (CU -OG62, ZN -OG62, PB -OG62, or AG -OG62) at the ALS

Global Vancouver laboratory. Quality controls include systematic addition of blank samples and

certified copper standards to each batch of samples sent to the laboratory.

NI-43-101 Disclosure

Alain Cayer, P.Geo., MSc., Vice-President Exploration of Kintavar, is Qualified Person under NI 43‐

101 guidelines who supervised and approved the preparation of the technical information in this

news release.

Hole # Zones From To Cu - Ag Grades

WAB-21-04 GB1 24 24.5 0.53% Cu, 3.9 g/t Ag and 0.28 g/t Au / 0.50m

WAB-21-18 GB1

59.1 59.4 0.42% Cu & 553 ppm Co / 0.30m

60 60.25 0.31% Cu & 373 ppm Co / 0.25m

60.6 60,85 0.70% Cu & 654 ppm Co / 0.25m

WAB-21-19 GB1-S 17.4 17.7 2.64% Cu, 16.2 g/t Ag, 0.72 g/t Au, 136 ppm Co & 170

ppm V / 0.30m

Table 1: 2021 Wabash drill program – GB1 zone highlights

- 3 -

Figure 1: Wabash Property – Summary of 2021 drilling campaign – MLI Corridor and GB1 zone

(pdf)

- 4 -

About Kintavar Exploration & the Mitchi – Wabash Properties

Kintavar Exploration is a Canadian mineral exploration Corporation engaged in the acquisition,

assessment, exploration and development of gold and base metal mineral properties. Its flagship

project is the Mitchi – Wabash copper -silver district (approx. 3 9 0 00 hectares, 100% owned)

located 100 km north of the town of Mont-Laurier and 15 km East of the town of Parent in Quebec.

Both properties cover an area of more than 300 km2 accessible by a network of logging and gravel

roads with access to hydro-electric power already on site, major regional roads including railroad

and a spur. The propert ies are located in the north -western portion of the central

metasedimentary belt of the Grenville geological province. The projects primarily focus o n

sediment-hosted stratiform copper type mineralization (SSC) but include Iron Oxide Copper Gold

(IOCG) and skarn type targets. Osisko holds a 2% NSR on 27 claims of the southern portion of the

Mitchi property, outside of the sedimentary basin. Kintavar also has exposure in the gold

greenstones of Quebec by advancing the Anik Gold Project in a partnership with IAMGOLD and

several early-stage projects that were optioned by Gitennes Exploration.

Kintavar supports local development in the Mitchi-Wabash region where it owns and operates the

Fer à Cheval outfitter (www.feracheval.ca), a profitable and cashflow generating operation where

it employs local workforce. It as well works with local First Nations to provide training and

employment.

For further information contact:

Kiril Mugerman, President and CEO

Phone: +1 450 641 5119 #5653

Email: [email protected]

Web: www.kintavar.com

Forward looking Statements:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains statements that may constitute “forward -looking information” or “forward looking

statements” within the meaning of applicable Canadian securities legislation. Forward -looking information and

statements may include, among others, statements regarding future plans, costs, objectives or performance of the

Corporation, or the assumptions underlying any of the foregoing. In this news release, words such as “may”, “would”,

“could”, “will”, “likely”, “believe”, “expect”, “anticipate”, “i ntend”, “plan”, “estimate” “target” and similar words and

the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be

read as guarantees of future performance or results, and will not necessarily be a ccurate indications of whether, or

the times at or by which, such future performance will be achieved. No assurance can be given that any events

anticipated by the forward -looking information will transpire or occur, including additional closings of the pr ivate

placement referred to above, or if any of them do so, what benefits the Corporation will derive. Forward -looking

statements and information are based on information available at the time and/or management's good -faith belief

with respect to future ev ents and are subject to known or unknown risks, uncertainties, assumptions and other

unpredictable factors, many of which are beyond the Corporation’s control. These risks, uncertainties and assumptions

- 5 -

include, but are not limited to, those described under “Risk Factors” in the Corporation’s management’s discussion and

analysis for the fiscal year ended December 31, 2021, which is available on SEDAR at www.sedar.com; they could cause

actual events or results to differ materially from those projected in any forward-looking statements. The Corporation

does not intend, nor does the Corporation undertake any obligation, to update or revise any forward -looking

information or statements contained in this news release to reflect subsequent information, events or c ircumstances

or otherwise, except if required by applicable laws.