Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ATY.V ·

Atico Reports Multiple High Grade Intercepts up to 20.70m of 5.76% Cu, 4.46 g/t Au and 11.50m of 8.16% Cu, 8.09 g/t Au and Continues to Extend the Ore Body at El Roble Mine in Colombia

Drill Results

Atico Reports Multiple High Grade Intercepts up to 20.70m of 5.76% Cu, 4.46 g/t

Au and 11.50m of 8.16% Cu, 8.09 g/t Au and Continues to Extend the Ore Body

at El Roble Mine in Colombia

VANCOUVER, British Columbia, April 04, 2024 -- Atico Mining Corporation (TSX.V: ATY | OTCQX: ATCMF) (“Atico” or the

“Company”) is pleased to announce positive results for the latest 49 drill holes being carried out in an area of historical mining

to expand tonnage at the El Roble mine. In addition, the Company reports the results for sixteen diamond drill core holes (see

first table below), which included 20.70m of 5.76% Cu, 4.46 g/t Au and 11.50m of 8.16% Cu, 8.09 g/t Au. Ore grade intercepts

in another fourteen drill holes are also reported over narrower widths of approximately 1 to 2 meters in areas with limited drilling

which highlights the possibility of further extending the ore body with additional drill programs.

“We continue to see very encouraging results with high grade intercepts from our mine vicinity drill campaign aimed at infilling

known areas of mineralization while at the same time looking for extension of the main historic massive sulphide bodies at the

El Roble deposit. This area was mined by operators previous to Atico obtaining control of the mine on November 22, 2013,”

said Fernando E. Ganoza, CEO. “These strong assay results continue to increase confidence in our view that additional high-

grade copper and gold mineralization remains both within the historically defined bodies and beyond the previously outlined

mineralized shell and are open at depth and along strike. The drill campaign is planned to continue throughout 2024 while in

parallel the Company is working on an updated resource estimate and will make this available shortly.”

Exploration Drilling Results Include:

Hole From (m) To (m) Interval (m) Cu (%) Au (g/t)

ATD-0224 222.00 226.00 4.00 5.33 5.92

ATD-0225 30.40 34.90 4.50 5.24 6.77

ATD-0228 136.70 139.00 2.30 17.15 3.19

ATD-0229 25.50 37.90 12.40 4.45 1.55

ATD-0231 29.70 33.10 3.40 4.31 5.11

ATD-0235 27.50 35.40 7.90 5.07 4.18

ATD-0238 42.10 47.80 5.70 5.61 9.97

ATD-0240 104.80 114.10 9.30 6.09 5.51

ATD-0240 124.00 125.80 1.80 16.97 2.20

ATD-0249 46.15 52.30 6.15 4.57 3.04

ATD-0250 48.20 64.70 16.50 2.66 4.11

ATD-0251 53.90 57.40 3.50 0.59 12.95

ATD-0252 38.60 50.10 11.50 8.16 8.09

ATD-0253 43.40 45.65 2.25 6.36 10.39

ATD-0260 41.20 48.70 7.50 2.71 9.57

ATD-0261 59.10 66.20 7.10 4.16 8.53

ATD-0261 46.20 52.00 5.80 5.71 6.05

ATD-0262 58.15 78.85 20.70 5.76 4.46

True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 90% and 95% of the drill intercept.

Exploration Drilling Program

The goal of the current surface and underground drilling program at the El Roble mine is to define zones of mineralization

within the extent of main historic massive sulphide body that were not exploited by previous operators and also to expand the

historically identified resource. During the first quarter of 2023, the Company began this drill infill program to test the main

mineralized body and the immediately adjacent area with a total of 7,880 meters of drilling in 77 holes. The drill campaign will

be continued during 2024 and results for the drill holes will be reported as the assay results for mineralized intercepts are

received.

El Roble Mine

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes

per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal

capacity of 400 tonnes per day.

El Roble has Proven and Probable reserves of 1.00 million tonnes grading 3.02% copper and 1.76 g/t gold, at a cut-off grade of

1.3% copper equivalent with an effective date of September 30, 2020. Mineralization is open at depth and along strike and the

Company plans to further test the limits of the deposit.

On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black

and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been

determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective

for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

Qualified Person

Garth Graves, P. Geo.

Garth Graves, P. Geo., consultant geologist for Atico Mining Corporation and a qualified person in accordance with National

Instrument 43-101 has reviewed and approved the technical information contained in this news release.

About Atico Mining Corporation

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America.

The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La

Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more

information, please visit www.aticomining.com .

ON BEHALF OF THE BOARD

Fernando E. Ganoza

CEO

Atico Mining Corporation

Trading symbols: TSX.V: ATY | OTCQX: ATCMF

Investor Relations

Igor Dutina

Tel: +1.604.633.9022

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities

being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the

‘‘U.S. Securities Act’’), or any state securities laws, and may not be offered or sold in the United States, or to, or for the

account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption

therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an

offer to buy any securities of the Company in any jurisdiction.

Cautionary Note Regarding Forward Looking Statements

This announcement includes certain “forward-looking statements” within the meaning of Canadian securities legislation. All

statements, other than statements of historical fact, included herein, without limitation the use of net proceeds, are forward-

looking statements. Forward- looking statements involve various risks and uncertainties and are based on certain factors and

assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events

could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ

materially from the Company’s expectations include uncertainties relating to interpretation of drill results and the geology,

continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the need to obtain additional

financing to maintain its interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting

anticipated program milestones for the Company’s mineral projects; and other risks and uncertainties disclosed under the

heading “Risk Factors” in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities regulatory

authorities on the SEDAR website at www.sedar.com