Vancouver, April 15, 2019 -- Atico Mining Corporation (the “Company” or “Atico”) (TSX.V:
ATY | OTC: ATCMF) announces its operating results for the three months ended March 31,
2019 from its El Roble mine. Production for the quarter totaled 2.36 million pounds of copper
and 1,552 ounces of gold in concentrates, a decrease of -57% and -45% for copper and gold,
respectively, over the same period in 2018.
“The strike at the El Roble mine has had a significant impact on the Company’s ability to meet
operational objectives in the first quarter. The mine has not operated for over fifty days during
this period and this is directly reflected in this quarter’s results,” said Fernando E. Ganoza, CEO.
“Once the operation resumes and for the remainder of the year, the Company will make its best
effort to minimize the impact of lost production.”
First Quarter Operational Highlights
• Production of 2.36 million pounds of copper contained in concentrates; a decrease of
57% over Q1 2018.
• Production of 1,552 ounces of gold contained in concentrates ; a decrease of 45% over
Q1 2018.
• Average processed tonnes per day of 885, an increase of 9% over Q1 2018.
• Copper head grade of 3.29%, a decrease of 13% over Q1 2018.
• Gold head grade of 2.24 grams per tonne; an increase of 10% over Q1 2018.
• Copper and gold recovery of 91.1% and 60.6%; a decrease of 3% for copper and 5% for
gold respectively over Q1 2018.
Union Negotiations
During the quarter the Company entered into its biennial union negotiations with the miners as
reported in the news release published on February 13, 2019. These negotiations led to a strike
which has stopped almost all Company’s activity at the mine for the remainder of the quarter.
Friday April 12, 2019 marked the sixtieth day of the strike after which, dictated by Colombian
law, a legal mechanism to end th e strike with an arbitrage process began. According to
Colombian Labor Code the process of assembling the arbitrator’s council is anticipated for the
8th working day proceeding April 12, 2019, after which operations should resume within 3
working days.
Despite 20 meetings and 8 complete proposals by the Company to solve the negotiation s
amicably, the strike has lasted longer than anticipated due to unacceptable terms requested by
the union. The arbitration process contemplated in the Colombian Law will now be the solution
Page 2 of 4
to the labor dispute, three arbitrators will decide in the coming months the labor conditions for
the unionized workers.
The Company believes this is a sustainable solution for all stakeholders and sets an important
precedent for future negotiations.
First Quarter Operational Details
Q1 2019
Total
Q1 2018
Total
% Change
Production (Contained in Concentrates)
Copper (000s pounds) 2,362 5,476 -57%
Gold (ounces) 1,552 2,825 -45%
Mine
Tonnes of ore mined 34,796 67,022 -48%
Mill
Tonnes processed 35,581 69,499 -49%
Tonnes processed per day 885 812 9%
Copper grade (%) 3.29 3.80 -13%
Gold grade (g/t) 2.24 2.03 10%
Recoveries
Copper (%) 91.6 94.0 -3%
Gold (%) 60.6 62.8 -4%
Concentrates
Copper and Gold Concentrates (dmt) 4,921 11,474 -57%
Payable copper produced (000s lbs) 2,244 5,202 -57%
Note: Metal production figures are subject to adjustments based on final settlement.
2019 Operational Guidance
The 2019 projections stated below and in January 29, 2019 News Release will be negatively
affected by the ongoing strike at the El Roble mine and will be adjusted by the Company once
operations resume.
The Company set the following objectives for 2019 at the El Roble mine:
Page 3 of 4
• Process between 280,000 and 290,000 tonnes.
• Maintain copper recovery above 93% and 62% for gold.
• Maintain an average copper head grade between 3.4% and 3.6%
• Maintain an average gold head grade between 1.8 g/t and 2.0 g/t
• Increase production between 43,000 and 45,000 dry tonnes of concentrate.
• Maintain production between 9,000 and 9,500 tonnes of copper.
• Maintain production between 10,200 and 10,700 ounces of gold.
• Mantain the mill mechanical availability to 95% with 345 days worked.
• Continue increasing the safety and environmental standards.
El Roble Mine
The The El Roble mine is a high grade, underground copper and gold mine with nominal
processing plant capacity of 850 tonnes per day, located in the Department of Choco in
Colombia. Its commercial product is a copper -gold concentrate. Since obtaining control of the
mine on November 22, 2013, Atico has upgraded the operation from a historical nominal
capacity of 400 tonnes per day.
El Roble has Proven and Probable reserves of 1.47 million tonnes grading 3.40% copper and
1.88 g/t gold, at a cut-off grade of 1.93% copper equivalent as of June 30th, 2018. Mineralization
is open at depth and along strike and the Company plans to further test the limits of the deposit.
On the larger land package, the Company has identified a prospective stratigraphic contact
between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by
Atico geologists for ten kilometers. This contact has been determined to be an important control
on VMS mineralization on which Atico has identified numerous target areas prospective for
VMS type mineralization occurrence, which is the focus of the current surface drill program at
El Roble.
Qualified Person
Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified
person under National Instrument 43-101 standards, is responsible for ensuring that the technical
information contained in this news release is an accurate summary of the original reports and
data provided to or developed by Atico.
About Atico Mining Corporation
Atico is a growth-oriented Company, focused on exploring, developing and mining copper and
gold projects in Latin America. The Company operates the El Roble mine and is pursuing
additional acquisition opportunities. For more information, please visit www.aticomining.com.
Page 4 of 4
ON BEHALF OF THE BOARD
Fernando E. Ganoza
CEO
Atico Mining Corporation
Trading symbols: TSX.V: ATY | OTC: ATCMF
Investor Relations
Igor Dutina
Tel: +1.604.633.9022
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of
the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
No securities regulatory authority has either approved or disapproved of the contents of this news release. The
securities being offered have not been, and will not be, registered under the United States Securities Act of 1933,
as amended (the ‘‘U.S. Securities Act’’), or any state securities laws, and may not be offered or sold in the United
States, or to, or for the account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act)
unless pursuant to an exemption therefrom. This press release is for information purposes only and does not
constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.
Cautionary Note Regarding Forward Looking Statements
This announcement includes certain “forward -looking statements” within the meaning of Canadian securities
legislation. All state ments, other than statements of historical fact, included herein, without limitation the use of
net proceeds, are forward-looking statements. Forward- looking statements involve various risks and uncertainties
and are based on certain factors and assumptio ns. There can be no assurance that such statements will prove to
be accurate, and actual results and future events could differ materially from those anticipated in such statements.
Important factors that could cause actual results to differ materially fro m the Company’s expectations include
uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits;
uncertainty of estimates of capital and operating costs; the need to obtain additional financing to ma intain its
interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting anticipated
program milestones for the Company’s mineral projects; and other risks and uncertainties disclosed under the
heading “Risk Factors” in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities
regulatory authorities on the SEDAR website at www.sedar.com
Non-GAAP Financial Measures
The items marked with a "(1)" are alternative performance measures and readers should refer to Non -GAAP
Financial Measures in the Company's Management's Discussion and Analysis for the nine months ended September
30, 2016 as filed on SEDAR and as available on the Company's website for further details .