Atico Produces 4.95 Million Pounds of Cu and 2,733 Ounces of Au in Second Quarter 2020
Page 1 of 4
Atico Produces 4.95 Million Pounds of Cu and 2,733 Ounces of Au in Second
Quarter 2020
Vancouver, July 14, 2020 -- Atico Mining Corporation (the “Company” or “Atico”) (TSX.V:
ATY | OTC: ATCMF) announces its operating results for the three months ended June 30, 2020
from its El Roble mine. Production for the quarter totaled 4.95 million pounds of copper and
2,733 ounces of gold in concentrates, an increase of 57% for copper and an increase of 29% for
gold over the same period in 2019.
“We are pleased to report production results in line with our 2020 objectives while the mine
continued to operate under strict preventative protocols and health policies. To date, we have no
confirmed cases of the COVID -19 at the mine site ” said Fernando E. Ganoza, CEO. “We
continue to put tremendous emphasis on the health and safety of all of our employees while at
the same time keeping a focus on delivering our 2020 production guidance.”
Second Quarter Operational Highlights
• Production of 4.95 million pounds of copper contained in concentrates ; an increase of
57% over Q2 2019.
• Production of 2,733 ounces of gold contained in concentrates ; an increase of 29% over
Q2 2019.
• Average processed tonnes per day of 903, an increase of 8% over Q2 2019.
• Copper head grade of 3.38%, an increase of 3% over Q2 2019.
• Gold head grade of 2.02 grams per tonne; a decrease of 13% over Q2 2019.
• Copper and gold recover y of 92.7% and 58.6%; an increase of 1% for copper and no
significant change for gold over Q2 2019.
Second Quarter Operational Review
Overall production was in line with C ompany budget for the second quarter. The increase in
most output metrics for the quarter is explained by the mine operating for the full quarter relative
to Q 2-2019 where the operation was stopped during the 2019 miners strike. The operation
remains on track to deliver on set guidance throughout the remainder of the year.
The Company continues to closely monitor developments around the COVID-19 pandemic and
continues to maintain strict preventative measures at the El Roble mine site, La Plata project, as
well as our corporate offices to safeguard the health of its employees, while continuing to
operate effectively and responsibly in its communities.
Page 2 of 4
Second Quarter Operational Details
Q2 2020
Total
Q2 2019
Total
% Change
Production (Contained in Concentrates)
Copper (000s pounds) 4,952 3,157 57%
Gold (ounces) 2,733 2,116 29%
Mine
Tonnes of ore mined 76,825 47,321 62%
Mill
Tonnes processed 71,804 47,534 51%
Tonnes processed per day 903 839 8%
Copper grade (%) 3.38 3.28 3%
Gold grade (g/t) 2.02 2.34 -13%
Recoveries
Copper (%) 92.7 91.7 1%
Gold (%) 58.6 58.4 Nil
Concentrates
Copper and Gold Concentrates (dmt) 10,828 6,561 65%
Payable copper produced (000s lbs) 4,704 2,999 57%
Note: Metal production figures are subject to adjustments based on final settlement.
Concentrate Inventory
The number of shipments the Company can export in any given quarter depends on several
variables some of which the Company does not control, hence there may be an inherent
variability in tonnes shipped quarter to quarter.
Q2 2020 Total
Amounts in dry metric tonnes
Opening inventory 4,435
Production 10,828
Sales 10,001
Number of shipments 1
Closing inventory 5,262
Note: Concentrate figures are subject to adjustments based on final settlement.
Page 3 of 4
El Roble Mine
The El Roble mine is a high grade, underground copper and gold mine with nominal processing
plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its
commercial product is a copper-gold concentrate.
Since obtaining control of the mine on November 22, 201 3, Atico has upgraded the operation
from a historical nominal capacity of 400 tonnes per day.
El Roble has Proven and Probable reserves of 1.47 million tonnes grading 3.40% copper and
1.88 g/t gold, at a cut-off grade of 1.93% copper equivalent as of June 30th, 2018. Mineralization
is open at depth and along strike and the Company plans to further test the limits of the deposit.
On the larger land package, the Company has identified a prospective stratigraphic contact
between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by
Atico geologists for ten kilometers. This contact has been determined to be an important control
on VMS mineralization on which Atico has identified numerous target areas prospective for
VMS type mineralization occurrence, which is the focus of the current surface drill program at
El Roble.
Qualified Person
Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified
person under National Instrument 43-101 standards, is responsible for ensuring that the technical
information contained in this news release is an accurate summary of the original reports and
data provided to or developed by Atico.
About Atico Mining Corporation
Atico is a growth-oriented Company, focused on exploring, developing and mining copper and
gold projects in Latin America. The Company generates significant cash flow through the
operation of the El Roble mine and is developing it’s high -grade La Plata VMS project in
Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities.
For more information, please visit www.aticomining.com.
Page 4 of 4
ON BEHALF OF THE BOARD
Fernando E. Ganoza
CEO
Atico Mining Corporation
Trading symbols: TSX.V: ATY | OTC: ATCMF
Investor Relations
Igor Dutina
Tel: +1.604.633.9022
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of
the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
No securities regulatory authority has either approved or disapproved of the contents of this news release. The
securities being offered have not been, and will not be, registered under the United States Securities Act of 1933,
as amended (the ‘‘U.S. Securities Act’’), or any state securities laws, and may not be offered or sold in the United
States, or to, or for the account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act)
unless pursuant to an exemption therefrom. This press release is for information purposes only and does not
constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.
Cautionary Note Regarding Forward Looking Statements
This announcement includes certain “forward -looking statements” within the meaning of Canadian securities
legislation. All statements, other than statements of historical fact, included herein, without limitation the use of
net proceeds, are forward-looking statements. Forward- looking statements involve various risks and uncertainties
and are based on certain factors and assumptions. There can be no assurance that such statement s will prove to
be accurate, and actual results and future events could differ materially from those anticipated in such statements.
Important factors that could cause actual results to differ materially from the Company’s expectations include
uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits;
uncertainty of estimates of capital and operating costs; the need to obtain additional financing to maintain its
interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting anticipated
program milestones for the Company’s mineral projects; the world -wide economic and social impact of COVID -
19 is managed and the duration and extent of the coronavirus pandemic is minimized or not long-term; disruptions
related to the COVID-19 pandemic or other health and safety issues, or the responses of governments, communities,
the Company and others to such pandemic or other issues; and other risks and uncertainties disclosed under the
heading “Risk Factors” in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities
regulatory authorities on the SEDAR website at www.sedar.com