ATEX Reports Maiden Resource Estimates for Valeriano Gold Oxide Deposit and Copper Gold Porphyry Deposit

Resource Estimates

ATEX Resources Inc., 25 Adelaide Street East, Suite 1900, Toronto, Ontario, M5C 3A1

ATEX Reports Maiden Resource Estimates for Valeriano Gold

Oxide Deposit and Copper Gold Porphyry Deposit

VANCOUVER, British Columbia, September 29, 2020 - ATEX Resources Inc. (TSXV:ATX)

("ATEX") is pleased to report initial resource estimates for two deposits on its Valeriano Copper

Gold Project located in Chile’s El Indio Belt. Both resource estimates were completed by SRK

Consulting (Chile) SpA. (“SRK”) on behalf of ATEX and have been prepared in accordance with

the Canadian Institute of Mining and Metallurgy and Petroleum Definition Standards for Mineral

Resources and Mineral Reserves (2014). A National Instrument 43-101 technical report will be

appropriately filed within 45 days of this release.

Highlights

Gold Oxide Epithermal Deposit

• Maiden Gold Oxide Resource Estimate totals 34.4 Mt at 0.528 g/t Au and 2.4 g/t Ag (0.561

g/t Au eq.) in the Inferred Category at a 0.275 g/t Au cut-off grade.

• Contained metal totals 584,684 oz Au and 2,653,895 oz Ag for 621,539 Au eq. oz.

• Resource measures approximately 650 metres by 500 metres in plan extending to an

average depth of 100 metres from surface (see Figures 1 & 2).

• Potential exists for additional near surface gold mineralization.

Copper Gold Porphyry Deposit

• Maiden Copper Gold Porphyry Resource Estimate of 297.3 Mt at 0.59% Cu, 0.193 g/t Au

and 0.90 g/t Ag (0.77% Cu eq.) in the Inferred Category at a cut-off grade of 0.50% Cu.

• Contained metal totals 1.77 Mt Cu, 1.84 M oz Au and 8.62 M oz Ag for 2.30 Mt Cu eq.

• Porphyry mineralization is open in all directions horizontally and to depth (see Figure 3).

• Highest Cu & Au grades are associated with a granodiorite porphyry and breccia bodies

(see Figure 4); drill testing extensions of these bodies is a priority.

Commenting on the maiden resource estimates, Raymond Jannas, ATEX’s CEO stated: “We are

very pleased with the two initial resource estimates prepared by SRK. As we have previously

disclosed, our near-term focus is on outlining an economically viable, heap leachable gold

resource close to surface and our maiden gold oxide resource is a strong step in this direction.

This season, we are planning on additional drilling to confirm and expand on the current resource

and preliminary metallurgical testing of the oxide mineralization has commenced. The drilling and

metallurgical test work are the first steps towards evaluating the possibility of initiating a

preliminary economic assessment.

While our current focus is moving the gold oxide resource forward, the initial porphyry resource

estimate suggests that Valeriano property has the potential to host a significant underground

copper gold porphyry deposit. Currently, the porphyry copper gold mineralization is open

horizontally in all directions and to depth.”

2

Gold Oxide Resource Estimate

An inferred resource of 34.4 million tonnes grading 0.528 grams per tonne (“g/t”) gold (“Au”) and

2.40 g/t silver (“Ag”) for a combined gold equivalent (“Au eq.”) grade of 0.561 g/t has been

estimated for a total of 584,684 ounces (“oz”) of Au and 2,653,895 Ag oz or 621,539 Au eq. oz

(see Table 1 & Figures 1 & 2). The gold oxide resource is associated with high-sulphidation style,

epithermal gold and silver mineralization developed within volcanic and volcaniclastic host rocks

overlying the Valeriano copper gold porphyry system.

Table 1. – Valeriano Gold Oxide Resource Estimate - Inferred

Cut-off

Au

(g/t)

Tonnes

Grade Ounces

Au

(g/t)

Ag

(g/t)

Au Eq.

(g/t) Au Ag Au Eq.

0.200 62,819,175 0.395 2.16 0.425 797,662 4,361,385 858,244

0.225 51,842,530 0.434 2.22 0.464 722,647 3,691,909 773,917

0.250 41,119,097 0.485 2.32 0.517 641,089 3,065,582 683,664

0.275 34,435,360 0.528 2.40 0.561 584,684 2,653,895 621,539

0.300 28,900,615 0.574 2.44 0.608 533,581 2,269,764 565,106

0.350 20,891,789 0.670 2.56 0.706 450,033 1,719,813 473,922

0.400 15,750,241 0.767 2.61 0.804 388,574 1,321,227 406,924

1. Mineral resources are not confined by economic or mining parameters.

2. Cut-off grades are for reporting purposes only and no economic conditions are implied.

3. Au equivalent grades are calculated based upon a Au price of $1,800 per oz and a Ag price of $25.00 per oz (all

prices in US$). Minor discrepancies may exist due to rounding. Metal recoveries were not considered.

4. Formula for Au Eq.% calculation: 𝐴𝑢#$(𝑔/𝑡)=𝐴𝑢+/,+.+//0∗.+23456

.823456

5. Tonnage and grade estimates are in metric units. Contained gold ounces are reported as troy ounces.

6. Estimated copper grades, at the 0.275 g/t cut-off grade, are 0.06%.

A preliminary metallurgical testing program, comprising up to 6 bottle roll tests undertaken on

available coarse rejects of sampled drill core from previous drill programs, has commenced. The

metallurgical test work will determine preliminary gold recoveries, leaching time (leach kinetics)

and approximate amount of consumables required. It is expected that the initial results from the

test work will be available early in 2021.

Copper Gold Porphyry Resource Estimate

Underlying and separate from the gold oxide resource and below the high-sulphidation style

alteration, lies the Valeriano copper gold porphyry mineralization which has been estimated to

host an initial inferred resource of 297.30 million tonnes grading 0.59% copper (“Cu”), 0.193 g/t

Au and 0.90 g/t Ag (copper equivalent (“Cu eq.”) grade of 0.77%) for an estimated 1.77 million

tonnes of contained Cu, 1.844 million oz of contained Au and 8.62 million oz of contained Ag (see

Table 2 & Figure 3) or 2.3 million tonnes Cu eq. The porphyry resource has been tested by four

drill holes and is open horizontally in all directions and to depth.

3

Table 2. – Valeriano Copper-Gold Porphyry Resource Estimate – Inferred

Cut-off

Cu

(%)

Tonnes

(millions)

Grade Contained Metal

Cu

(%)

Au

(g/t)

Ag

(g/t)

Cu Eq.

(%)

Cu

(tonnes)

Au

(oz)

Ag

(oz)

Cu Eq.

(tonnes)

0.2 684.58 0.49 0.163 0.91 0.64 3,321,772 3,590,244 20,039,444 4,374,922

0.3 645.33 0.50 0.167 0.91 0.66 3,225,909 3,473,140 18,882,439 4,242,805

0.4 515.43 0.53 0.180 0.97 0.70 2,746,126 2,986,710 16,030,960 3,619,818

0.5 297.30 0.59 0.193 0.90 0.77 1,766,743 1,844,884 8,621,904 2,301,579

0.6 142.93 0.65 0.198 0.81 0.83 926,661 908,024 3,730,162 1,187,958

0.7 15.74 0.73 0.235 0.91 0.95 115,180 118,723 458,731 149,235

1. Mineral resources are not confined by economic or mining parameters.

2. Cut-off grades are for reporting purposes only and no economic conditions are implied.

3. Cu equivalent grades are calculated based upon a Cu price of $3.00 per pound, Au price of $1,800 per oz and Ag price of $25.00

per oz (all prices in US$). Minor discrepancies may exist due to rounding. Metal recoveries were not considered.

4. Formula for Cu Eq.% calculation: C𝑢#$(%)=:8_<<=

>?,???+ .8//0∗.823456

AA.?CDA∗E>.?>EF∗:823456

+ .+//0∗.+23456

AA.?CDA∗E>.?>EF∗:823456

5. Tonnage and grade estimates are in metric units. Contained gold ounces are reported as troy ounces.

Resource Estimation Methodology

The Gold Oxide Resource Estimate (see Figures 1 & 2) is based upon 4,455 metres in 55 drill

holes (1,148 metres in 19 diamond drill holes and 3,307 metres in 36 reverse circulation drill

holes) from the 1990’s Barrick Gold Corp. (“Barrick”) and Phelps Dodge Corporation (“Phelps

Dodge”) exploration programs and from Hochschild Mining plc’s (“Hochschild”) 2011 to 2013

drilling programs. A total of 2,209 composites were used in the estimation, virtually all 2 metres

length. The resource estimation units are based on ATEX’s three-dimensional models for lithology

and mineralization (see Figures 4 & 5, respectively) that were built using geological units from

Hochschild’s core logging and taking into account structure controls and correlogram reach.

The Gold Oxide Resource Estimate lies within the oxide 3-D shell and is confined to three volcanic

and volcaniclastic units (sandstone, agglomerate and rhyolite). The majority of the Oxide

Resource extends to depths of approximately 100 metres below surface, locally extending

deeper. Within the rhyolite sequence, the Oxide Resource is restricted to upper 85 metres of the

rhyolite unit as statistical analyses shows that the gold grade drops significantly below that

horizon.

After geostatistical analysis of the gold grades within the 3-D estimation units, and prior to the

resource estimation, mineralized versus non-mineralized material was defined by indicator kriging

for each unit. Variography was analyzed by means of correlogram maps, down the hole

correlograms and directional correlograms. Final results indicated an overall horizontal isotropy

and vertical anisotropy. The resource was estimated via Ordinary Kriging in 4 passes. Samples

assaying greater than 4.00 g/t Au in agglomerate, 1.65 g/t Au in upper rhyolite and 0.29 g/t Au in

sandstone were capped. The resulting 10 x 10 x 10-metre block model was validated by means

of global and conditional bias assessments as well as by drift analyses.

The Copper Gold Porphyry Resource Estimate (see Figure 3) is based upon 2,701 metres of

diamond drilling in four drill holes completed by Hochschild. A total of 1,353 composites were

used in the estimation, almost all with a length of 2 metres. The Porphyry Resource is limited to

4

the zone of dominant chalcopyrite copper mineralization. The three-dimensional chalcopyrite

model was built using Hochschild core logging information taking into account structure controls.

The chalcopyrite 3D shell was separated in two units: 1) higher grade being hosted within the

granodiorite porphyry and the south breccia (“Cpy_gd_bx”); and 2) moderate grade within all other

intrusives, breccias and rhyolite host rock (“Cpy_other”). After geostatistical analysis of copper

grades within the 3-D estimation units, and prior to the resource estimation/calculation,

mineralized versus non-mineralized material was defined by indicator kriging for each unit.

Variography was analyzed by means of correlogram maps, down the hole correlograms and

directional correlograms. Final results indicated an overall horizontal isotropy and vertical

anisotropy. The resource was estimated via Ordinary Kriging in 4 passes. Samples assaying

greater than 1.2% Cu in Cpy_gd_bx and 1.0% Cu in Cpy_other were capped. Gold grades were

capped in the chalcopyrite shell by host-rock: 0.80 g/t Au (granodiorite), 0.53 g/t Au (rhyolite,

diorite porphyry & breccia) and 0.47 g/t Au (south breccia & PQDH). The resulting 10 x 10 x 10-

metre block model was validated by means of global and conditional bias assessments as well

as by drift analyses.

No specific gravity measurements have been completed on mineralized material from either the

oxide gold resource or the copper gold porphyry resource. An estimated specific gravity of 2.5

has been used for both resource estimates. Samples for specific gravity analyses are currently

be collected from drill core from the 2012 – 2014 drilling program.

Given the current drill density for the Porphyry Resource, partial lack of data for complete QA/QC

analyses in the Oxide Resource and absence of specific gravity data, both resource estimates

have been classified as inferred.

Quality Assurance / Quality Control Program

The diamond drilling core from Hochschild’s 2011 to 2013 drilling campaign were collected and

sampled under the direct supervision of Hochschild’s staff. Diamond drill core was placed in core

boxes at the drill site, appropriately tagged, secured and transported to the Hochschild’s

exploration camp. Drill core was logged, marked, on average, at 2 metre intervals for sampling

and split longitudinally with a diamond drill saw. One half of the core was bagged and sample

tags attached and the second half of the core was returned to the core boxes. All samples were

appropriately labelled and transported by truck by Hochschild personnel to the ALS Chemex

laboratory located in Coquimbo, Chile. ALS Chemex-Coquimbo carried out preparation, chemical

analyses and QA/QC. The preparation protocol (PREP-31B) consisted of crushing 70% to less

than 2 mm (-10#), rotary split of 1 kg and pulverization to better than 85% passing 75 microns (-

150#). Gold was analyzed via 50-gram fire assay and AA. Thirty-five additional elements, which

included Cu, Ag, molybdenum and arsenic were assayed using aqua regia digestion and ICP-

AES analysis (protocol ME-ICP41).

Hochschild´s QA/QC protocol for drill hole samples included field, coarse reject and pulp

duplicates of samples, blanks, and Au and Cu standards. At least 20% of the samples were sent

for assay comprised quality assurance duplicates, blanks and standards.

ATEX reviewed QA/QC data obtained during Hochschild’s 2011-2013 drilling campaigns. A total

of 7,397 drillhole samples were collected in holes VALDD-01 through VALDD-16. Details are as

follow:

• Field, coarse reject and pulp duplicates totalled 890 Au assays of which 342 were assayed

for Cu.

• A total of 345 standards were inserted; 323 Au standards and 22 Cu standards.

5

• A total of 628 coarse (-10#) and fine (-150#) blanks were assayed.

Overall conclusions drawn from the QA-QC analyses are as follows:

• Analyses of duplicates show good precision indicating that the protocols used for sample

preparation and assaying were adequate.

• Analyses of standards used during exploration show good accuracy, however, one Au

standard showed a consistent negative basis (-15.77%).

• Analyses of blanks showed no serious contamination problems between samples.

The overall conclusion is that the available QA-QC data generated by Hochschild for the Valeriano

drill program meets acceptability criteria for the stage of the project and the exploration data can

be used for modeling and estimation of inferred resources.

There is no QA/QC data available from the Phelps Dodge drilling program. From drill logs, it is

apparent that diamond core was sampled based upon geological controls in areas of potential

mineralization and was sampled and assayed at 1-metre intervals in areas of no apparent

mineralization. Drill core recovery appears to have been good. The sampling protocol resulted

in variable sample lengths in areas of interest typically from 10 to 50 centimeters. In the case of

reserve circulation drill holes, sampling was completed at 1-metre intervals and the entire drill

hole was sampled and assayed. There is no information available regarding the sample

preparation or assaying methods used by Phelps Dodge.

There is no QA/QC data available and little sample or assaying methodology information available

from the Barrick reverse circulation drilling program other than sampling was undertaken at 1-

metre intervals and sampling commenced at the beginning of the drill holes.

Considering the seniority of the companies and the professionals involved at the time, there is no

apparent reason to question the validity of the Phelps Dodge or Barrick assaying information. The

assay results are internally consistent within the oxide resource area, geologically reasonable for

the type of deposit and intensity of mineralization, and are comparable to the assay results

returned by Hochschild drilling in the same area. It is therefore considered reasonable that these

results be included in the estimation of an inferred resource on an early stage exploration property.

Details of historical exploration, including drilling, sampling and assaying, together with ATEX’s

QA-QC analysis and commentary are available in the “NI 43-101 TECHNICAL REPORT ON THE

VALERIANO PROJECT, ATACAMA REGION, CHILE” dated November 25, 2020 and filed at

www.sedar.com.

NI 43-101 Disclosure

SRK Consulting (Chile) SpA. undertook to prepare and is responsible for the resource estimate.

Joled Nur, Civil Mining Engineer, SRK Consulting (Chile) SpA and a member of the Public

Register of Competent Persons in Mining Resources and Reserves of Chile, No. 181, is the

independent qualified person (“QP”), as defined by National Instrument 43-101 Standards for

Disclosure for Mineral Projects, who prepared the resource estimates. Mr. Nur has reviewed and

approved the disclosure related to the resource estimates within this press release.

David Hopper, the independent QP for the Valeriano Project, is a Chartered Geologist of the

Geological Society of London, Fellow No. 1030584. Mr. Hopper has reviewed and approved the

technical disclosure within this press release.

6

The Valeriano resource estimates have been prepared under Canadian Institute of Mining,

Metallurgy and Petroleum Definition Standards (2014).

About ATEX Resources Inc.

ATEX is a mineral exploration company focused on the acquisition, development and

monetization of projects throughout the Americas. ATEX’s flagship property is the Valeriano

Copper Gold Project located in the northern portion of Chile’s prolific El Indio Belt.

On behalf of ATEX Resources Inc.

Dr. Raymond Jannas

For more information, email [email protected] or call 1-647-287-3778.

Forward Looking Information - This news release contains forward-looking statements, including

predictions, projections and forecasts. Forward-looking statements include, but are not limited to: plans for

the evaluation of the Valeriano property; the success of evaluation plans; the success of exploration

activities; mine development prospects; and, potential for future metals production. Often, but not always,

forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or

"does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates",

"does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain

actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and

other factors which may cause the actual results, performance or achievements to be materially different

from any future results, prediction, projection, forecast, performance or achievements expressed or implied

by the forward-looking statements. Such factors include, among others, changes in economic parameters

and assumptions, the interpretation and actual results of current exploration activities; changes in project

parameters as plans continue to be refined; the conversion of inferred resources to the measured and

indicated category; the results of regulatory and permitting processes; future metals price; possible

variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour

disputes and other risks of the mining industry; the results of economic and technical studies, delays in

obtaining governmental approvals or financing or in the completion of exploration, as well as those factors

disclosed in ATEX's publicly filed documents.

Although ATEX has attempted to identify important factors that could cause actual actions, events or results

to differ materially from those described in forward-looking statements, there may be other factors that

cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance

that forward-looking statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue reliance

on forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.

7

Figure 1. Plan View showing the outlines of the gold mineralization projected from the 4200-metre elevation inferred

resource block model (Figure 2). The NW-SE A-A’ Section (Figure 2 – Gold Oxide Inferred Block Model Section) is

indicated by a solid black and the NW-SE B-B’ Section (Figures 3, 4 & 5 – copper gold porphyry related sections) is

indicated by a dashed black line. RDH refers to reverse circulation drill holes; DDH & VALDD refer to diamond drill

holes. Drill holes completed by: Phelps Dodge - DDH-V1 to 9 & RDH-V10 to 25; Barrick - RDH-V26 to 45; Hochschild

- VALDD-01 to 16.

8

Figure 2. NW-SE Block Model Section (A – A’, figure 1) looking NE through the gold oxide inferred resource block

model. The 4200m elevation (Figure 1) is indicated by a dashed black line. Drill hole traces have a 50 m of influence

on each side. RDH refers to Reverse circulation drill holes; DDH & VALDD refer to diamond drill holes. Drill holes

completed by: Phelps Dodge - DDH-V1 to 9 & RDH-V10 to 25; Barrick - RDH-V26 to 45; Hochschild - VALDD-01 to

16.