Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ATX.TO ·

ATEX Intersects 146 Meters of 2.00% CuEq at B2B Zone with over 600 Meters of Results Still Pending High-Grade Interval of 54 Meters at 2.50% CuEq Remains Open and Expected to Grow with Further Results and Expand B2B Dimensions

Drill Results

ATEX Intersects 146 Meters of 2.00% CuEq at

B2B Zone with over 600 Meters of Results Still

Pending

High-Grade Interval of 54 Meters at 2.50% CuEq Remains Open

and Expected to Grow with Further Results and Expand B2B

Dimensions

Toronto, Ontario--(Newsfile Corp. - December 18, 2025) -

ATEX Resources Inc. (TSXV: ATX)

(OTCQB: ATXRF)

("

ATEX

" or the "

Company

") is pleased to announce full results for the initial Phase

VI drill hole ATXD25C and partial results for drill hole ATXD26B, the second hole from the current

campaign at the Valeriano Copper-Gold Project ("

Valeriano

" or the "

Project

") located in Atacama

Region, Chile. Drilling commenced in September with six rigs operational on site and has already

achieved half of the 25,000 meters guided for Phase VI. Despite the drill program being ahead of

schedule, assay laboratory turnaround times are currently longer than anticipated due to elevated

seasonal demand across the industry. Results will be released as they are received.

"Initial results for drill hole ATXD26B have delivered another high-grade intercept in the B2B Zone

and further demonstrates potential to enlarge this high-grade target,"

stated Ben Pullinger, President

and CEO of ATEX.

"Results from initial Phase VI drilling at the B2B Zone are improving our

understanding of the high-grade system and confirming potential for growth beyond the 2025 Mineral

Resource Estimate. To date the program has surpassed expected productivity numbers with 12,550m

already completed and over 6,500m of samples currently at the lab."

Highlights include:

ATXD26B

, a daughter hole targeting the

B2B Zone

intersecting

54 metres (

"

m

"

) of 2.50%

copper equivalent (

"

CuEq

"

)

(1.58% copper "

Cu

", 0.88 g/t gold "

Au

") within broader intervals of

146m of 2.00% CuEq

(1.30% Cu, 0.67 g/t Au) and

224m of 1.52% CuEq

(1.02% Cu, 0.49 g/t

Au).

Logged breccia

mineralization intersected in ATXD26B is anticipated to

extend the

current limits of the B2B Zone by 100 meters down dip.

Chalcopyrite and bornite

mineralization with associated brecciation,

characteristic of

the B2B Zone

was intersected from approximately

1,050m to 1,400m downhole,

before

entering well mineralized early porphyry associated with the high-grade trend until the end of

the hole.

Over 600m of assay results for ATXD26B are outstanding with full results

anticipated in January.

Finalized assays from ATXD25C

resulted in an improved intercept of

164m of 2.77% CuEq

(1.69% Cu, 0.97 g/t Au, 5.5 g/t Ag, 43 g/t Mo) vs. 2.72% CuEq previously

i

, including

86m of 3.84%

CuEq

(2.28% Cu, 1.41 g/t Au, 7.9 g/t Ag, 48 g/t Mo) vs. 3.77% CuEq previously, and

40m of

4.83% CuEq

(2.76% Cu, 1.88 g/t Au, 10 g/t Ag, 43 g/t Mo) vs. 4.73% CuEq previously, starting at

1,558m downhole.

The reported intervals are

contained within a broader intercept of 584m at 1.27% CuEq

(0.83% Cu, 0.39 g/t Au, 2.2 g/t Ag, 65 g/t Mo) from 1,302m downhole.

Results

exceed the average B2B Zone grade estimated in the 2025 MRE

highlighting

upside.

The horizontal width of approximated 170m is indicative of

thick, continuous

mineralization

underscoring the potential for

increase in material and tonnage in the

area of this hole

.

Table 1 – Partial Results for ATXD26B & Summary Results for ATXD25C

Hole ID

From

To

Interval

Cu

Au

Ag

Mo

CuEq %

(1)

(m)

(m)

(m)

(%)

(g/t)

(g/t)

(g/t)

ATXD26B

1,014

1,238

224

1.02

0.49

-

-

1.52

Incl.

1,092

1,238

146

1.30

0.67

-

-

2.00

Incl.

1,174

1,228

54

1.58

0.88

-

-

2.50

ATXD25C

1,302

1,886

584

0.83

0.39

2.2

65

1.27

Incl.

1,558

1,722

164

1.69

0.97

5.5

43

2.77

Incl.

1,558

1,644

86

2.28

1.41

7.9

48

3.84

Incl.

1,604

1,644

40

2.76

1.88

10.0

43

4.83

(1) CuEq calculated using recoveries assumed in 2025 MRE (see Company news dated September 23, 2025) using the formula: Cu (%) +

1.04991243188302 x Au (g/t) + 0.00824244819238401 x Ag (g/t) + 0.000357909627766355 * Mo (g/t).

(2) CuEq reported assuming metal prices of US$2,750/oz Au, US$3.80/lb Cu, US$27/oz Ag, and US$22/lb Mo.

(3) CuEq reported assuming recoveries of Cu 94%, Au 95%, Ag 80% and Mo 64%.

(4) ATXD25C and ATXD26B were composited at a cut-off of 0.3% CuEq with a maximum internal dilution of 18m representing 26m of late-porphyry

dykes intersected at 1,532m in ATXD25C.

(4) Ag and Mo pending for released ATXD26B intersections with 634m of assays pending to the end of the hole. 4m of drill core was not recovered

between 1,140m and 1,144m in a fault zone.

(5) Horizontal width of mineralized ATXD25C intersection 1,558m to 1,722m is approximately 170m.

Figure 1. Long-Section of B2B and Porphyry Models

ii

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6303/278586_c0873ae6844ea848_001full.jpg

Figure 2. Plan Map of Phase VI Drill Holes

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6303/278586_c0873ae6844ea848_002full.jpg

Phase VI Drill Program Update

The Phase VI drill program has six diamond drill rigs currently active on site and has already achieved

half of the targeted 25,000 metres of exploration drilling prioritizing the high-grade B2B Zone and similar

nearby high-grade breccia targets. Details of drill holes currently in progress as part of the ongoing

exploration program are provided below. Assay results will be reported as they are finalized and

received from the laboratory.

B2B Zone

ATXD31A

is evaluating northwest lateral continuity at the lower elevation of B2B Zone, with the

potential to extend into the high-grade core of the porphyry system.

In Progress.

ATXD32

is testing the B2B Zone approximately 65m north of ATXD23A to confirm high-grade

mineralization along strike.

Assays Pending.

ATXD25D

is testing the northwest strike extension of the B2B Zone, in the upper part of the

breccia system.

In Progress.

New High-Grade Breccia Targets

ATXD34A

is testing a B2B-like target, "B3B", for potential high-grade mineralization 130m to the

east of B2B.

In Progress.

ATXD35

is testing B3B for potential high-grade mineralization to the east of the B2B Zone.

In

Progress.

ATXD30

is testing B2B-like mineralization labeled "

B4B

" at the northern border limits. The drill

hole is approximately 600 metres to the northeast of the B2B Zone.

Assays Pending.

ATXD36

is designed to evaluate a newly defined magnetic anomaly labeled "

B5B

", targeting a

potential breccia body located northeast of ATXD30.

In Progress.

ATXD33

is targeting an untested B2B-like geophysical anomaly to the southeast, which is

approximately 1 km from the mineralized center.

Assays Pending.

Quality Control & Quality Assurance

Drill holes are collared with a PQ drill bit, reduced to HQ and, sequentially, to NQ as the drill holes

progressed deeper. Drill core produced by the drill rigs was extracted from the core tubes by the drill

contractor under the supervision of ATEX employees, marked for consistent orientation and placed in

core boxes with appropriate depth markers added. Full core boxes were then sealed before being

transported by ATEX personnel to the Valeriano field camp. Core at the field camp is processed, quick

logged, checked for recovery, photographed, and marked for specific gravity, geotechnical studies and

for assays. From camp, the core is transferred to a secure core-cutting facility in Vallenar, operated by

IMG, a third-party consultant. Here, the core trays are weighed before being cut using a diamond saw

under ATEX personnel oversight. ATEX geologists working at this facility double-check the selected

two-metre sample intervals, placing the samples in seal bags and ensuring that the same side of the

core is consistently sampled. Reference numbers are assigned to each sample and each sample is

weighed. The core trays with the remaining half-core are weighed and photographed. Additionally, core

logs are updated, and specific gravity and geotechnical samples are collected. The remaining core is

stored in racks at the Company's secure facility in Vallenar.

From Vallenar samples are sent to an ALS preparation facility in Copiapo. ALS is an accredited

laboratory which is independent of the Company. The prepared samples were sent to the ALS assay

laboratories in either Santiago, Chile or Lima, Peru for gold (Au-AA24), copper (Cu-AA62), molybdenum

(Mo-AA62) and silver (Ag-AA62) assays as well as and multi-element ICP (ME-MS61) analysis. No data

quality problems were indicated by the QA/QC program.

Qualified Person

Mr. Ben Pullinger, P.Geo., registered with the Professional Geoscientists Ontario, is the Qualified

Person, as defined by National Instrument 43-101 - Standards for Disclosure for Mineral Projects, for the

Valeriano Copper Gold Porphyry Project. Mr. Pullinger is not considered independent under NI 43-101

as he is President and CEO of ATEX. He has reviewed and approved the disclosure of the scientific

and technical information contained in this press release.

About ATEX

ATEX is exploring the Valeriano Copper-Gold Project which is located within the emerging copper gold

porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga

Gold Porphyry Belt to the north, located in the Atacama Region, Chile. This emerging belt, informally

referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of

development including, Filo del Sol (Lundin Mining/BHP), Josemaria (Lundin Mining/BHP), Lunahausi

(NGEx Minerals), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick).

Valeriano hosts a large, high-grade, copper-gold porphyry Mineral Resource: an Indicated Resource of

475 Mt at 0.88% CuEq (0.58% Cu, 0.25 g/t Au, 1.39 g/t Ag and 70.4 g/t Mo) at a cutoff grade of 0.35%

Cu, and an Inferred resource of 1,511 Mt at 0.75% CuEq (0.50% Cu, 0.20 g/t Au, 1.16 g/t Ag and 70.6

g/t Mo) at a cut-off grade of 0.35% Cu, as reported on September 23, 2025.

For further information, please contact:

Ben Pullinger,

President and CEO

Email:

[email protected]

Aman Atwal,

Vice President, Business Development and Investor Relations

Email:

[email protected]

1-647-398-9405

or visit ATEX's website at

www.atexresources.com

.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

This news release contains forward-looking statements, including predictions, projections, and

forecasts. Often, but not always, forward-looking statements can be identified by the use of words such

as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates",

"forecasts", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation

of such words and phrases or state that certain actions, events or results "may", "could", "would", "might"

or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks,

future events, conditions, uncertainties and other factors which may cause the actual results,

performance or achievements to be materially different from any future results, prediction, projection,

forecast, performance or achievements expressed or implied by the forward-looking statements.

Such forward-looking statements include, among others: statements regarding plans for the evaluation of

exploration properties including the Valeriano Copper Gold Project; the success of evaluation plans; the

success of exploration activities especially to the significant expansion of the high-grade corridor; mine

development prospects; potential for future metals production; changes in economic parameters and

assumptions; all aspects related to the timing and extent of exploration activities, including the Phase V

and Phase VI programs contemplated in this press release; timing of receipt of exploration results; the

interpretation and actual results of current exploration activities and mineralization; changes in project

parameters as plans continue to be refined; the results of regulatory and permitting processes; future

metals price; possible variations in grade or recovery rates; failure of equipment or processes to

operate as anticipated; labour disputes and other risks of the mining industry; the results of economic

and technical studies; delays in obtaining governmental and local approvals or financing or in the

completion of exploration; timing of assay results; as well as those factors disclosed in ATEX's publicly

filed documents.

Although ATEX has attempted to identify important factors that could cause actual actions, events or

results to differ materially from those described in forward-looking statements, there may be other factors

that cause actions, events or results not to be as anticipated, estimated or intended. There can be no

assurance that forward-looking statements will prove to be accurate, as actual results and future events

could differ materially from those anticipated in such statements. Accordingly, readers should not place

undue reliance on forward-looking statements.

Neither the TSX Venture Exchange nor its regulation services provider has reviewed or

accepts

responsibility for the adequacy or accuracy of the content of this news release.

i

See news release titled "ATEX Drills New Highest-Grade Intercept In First Phase VI Drill Hole Hitting 164 Metres Of 2.72% CuEq Including 40

Metres Of 4.73% CuEq In The B2B Zone", reported on October 21, 2025.

ii

See news release titled "

ATEX Completes Phase V Program Ending in High-Grade B2B Mineralization – Strategic Objectives Achieved With

Resource Update Expected in 2H 2025

" reported on July 30, 2025 for ATXD23A and ATXD29A details. See news release titled "

ATEX

Demonstrates Scalability and Discovers Overprinting High-Grade System in Phase IV Drill Program

" reported on June 25, 2024 for ATXD26

details. CuEq for all three holes calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) using the following

formula: CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) +(94.6503085864 * Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/278586