Athena GOLD Significantly Expands Laird Lake and Excelsior Springs Projects
ATHENA GOLD SIGNIFICANTLY EXPANDS LAIRD LAKE AND EXCELSIOR SPRINGS PROJECTS
White Rock, BC --- Accesswire --- July 31, 2025 - Athena Gold Corporation (CSE: ATHA) (OTCQB: AHNRF) (“Athena”
or the “Company”) is pleased to announce a significant expansion of its flagship Laird Lake gold project in Ontario’s
prolific Red Lake Gold District, alongside an update on its Excelsior Springs project in Esmeralda County, Nevada.
Laird Lake Project Expansion and Till Program Update
Athena has expanded its Laird Lake project by approximately 24% through the acquisition of an additional 995
hectares via map staking, increasing the total land package to approximately 5,155 hectares. The new claims were
staked in response to encouraging initial results from the 2025 field season, which highlighted favourable trending
structures trending westwards. Located approximately 10 km west of West Red Lake Gold Mines’ Madsen mine and
34 km northwest of Kinross Gold’s Great Bear project, Laird Lake spans over 10 km of the prospective Balmer -
Confederation Assemblage contact, positioning it as a cornerstone of Athena’s exploration portfolio (Figure 1).
Figure 1: Regional map of Red Lake Gold District, showing newly expanded Laird Lake project.
The Company has received initial results from its recently completed till sampling program at Laird Lake, initiated in
May 2025, which involved the collection of 2,048 till and QAQC samples (see press release dated July 14, 2025). The
program, designed to identify gold-in-till anomalies and refine high-priority drill targets, utilized a grid spacing of 100
m x 100 m within the Balmer and Confederation assemblages and 200 m x 200 m in surrounding felsic intrusive
bodies. The Company is encouraged by the initial results and anticipates providing a comprehensive update to the
market once the full suite of assays has been received and analyzed, expected in late summer 2025. The results are
expected to inform follow-up fieldwork and help define drill targets for a planned winter drilling program.
Excelsior Springs Project Expansion and Exploration Update
Athena is pleased to provide an update on its Excelsior Springs project in Nevada, under an option agreement with
Firetail Resources Limited (ASX: FTL) ("Firetail") (see press release dated June 2, 2025). The project land package has
been significantly expanded through the staking of an additional 115 unpatented mining claims , increasing its size
more than 50% to over 2,500 hectares. The new claims were targeted based on mapping that indicated the presence
of Tertiary felsic intrusive rocks and cover multiple undocumented small -scale workings (see Firetail press release
dated July 25, 2025). The new claims are 100% owned by Athena and included in the option agreement.
Firetail recently announced that it has advanced exploration at the Excelsior Springs project through reprocessing of
magnetics, IP/resistivity, and CSAMT geophysical data, interpreting a >5 km fluid conduit for gold within the Buster
Trend and intrusion -related gold targets. Field mapping and sampling revealed further undocumented workings,
including an adit within the Buster Trend with mineralization appearing 2-3 m wide . Firetail conducted channel
sampling over this previously untested target with assays pending. A 3D underground survey of the Buster and Blue
Dick mines is complete, with processing pending. Firetail’s initial diamond drilling program is expected to commence
in Q3 2025 (see Firetail press release dated July 29, 2025 ). Athena continues to support Firetail’s systematic and
technology-driven approach to unlocking the project’s potential.
Qualified Person
Technical information in this news release pertaining to the Laird Lake project has been reviewed and approved by
Benjamin Kuzmich, P .Geo., a geoscientist and qualified person for the purposes of National Instrument 43-101.
About Athena Gold Corporation
Athena Gold is engaged in the business of mineral exploration and the acquisition of mineral property assets. Its
objective is to locate and develop economic precious and base metal properties of merit and to conduct additional
exploration drilling and studies on its projects across North America. Athena Gold’s Laird Lake project is situated in
the Red Lake Gold District of Ontario, covering over 5,000 hectares along more than 10 km of the Balmer -
Confederation Assemblage contact, where recent surface sampli ng results returned up to 373 g/t Au. This
underexplored area is road-accessible, located about 10 km west of West Red Lake Gold’s Madsen mine and 34 km
northwest of Kinross Gold's Great Bear project. Meanwhile, its Excelsior Springs Au-Ag project is located in the prolific
Walker Lane Trend in Nevada, where it is currently under option by Firetail Resources Limited. Excelsior Springs spans
over 2,500 hectares and covers at least three historic mines. Athena Gold also holds a 100% interest in its Oneman
Lake Au-VMS project in Ontario and its Crow Springs Au-Cu project in Nevada.
For further information about Athena Gold Corporation, please visit www.athenagoldcorp.com.
On Behalf of the Board of Directors
Koby Kushner
President and Chief Executive Officer, Athena Gold Corporation
For further information, please contact:
Athena Gold Corporation
Koby Kushner, President and Chief Executive Officer
Phone: 416-846-6164
Email: [email protected]
CHF Capital Markets
Cathy Hume, CEO
Phone: 416-868-1079 x 251
Email: [email protected]
Forward-Looking Statements
This press release contains forward -looking statements and forward -looking information (collectively, "forward -looking
statements") within the meaning of applicable Canadian and US. securities laws. All statements, other than statements of historical
fact, included herein, including, without limitation, statements regarding future exploration plans, future results from exploration,
and the anticipated business plans and timing of future activities of the Company, are forward -looking statements. Although the
Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correc t.
Forward-looking statements are typically identified by words such as: "believes", "will", "expects", "anticipates", "intends",
"estimates", ''plans", "may", "should", ''potential", "scheduled", or variations of such words and phrases and similar expres sions,
which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieve d. In
making the forward -looking statements in this press release, the Company has applied several material assumptions, including
without limitation, that there will be investor interest in future financings, market fundamentals will result in sustained p recious
metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the futu re
exploration and development of the Company's projects in a timely manner.
The Company cautions investors that any forward -looking statements by the Company are not guarantees of future results or
performance, and that actual results may differ materially from those in forward-looking statements.
Readers are cautioned not to place undue reliance on forward -looking statements. The Company undertakes no obligation to
update any of the forward-looking statements in this press release or incorporated by reference herein, except as otherwise stated.
Neither the Canadian Securities Exchange nor its regulation services provider accepts responsibility for the adequacy or
accuracy of this release.