Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ASTR.V ·

Astra Trenching Returns 5.0 G/T AuEq over 3.5 Metres and Drilling Commences at Pampa Paciencia, Chile

Drill Results Exploration Programs

ASTRA EXPLORATION INC. (TSX-V: ASTR)

NEWS RELEASE

ASTRA TRENCHING RETURNS 5.0 G/T AUEQ OVER 3.5 METRES AND DRILLING

COMMENCES AT PAMPA PACIENCIA, CHILE

Vancouver, British Columbia – March 14, 2022 – Astra Exploration Inc. (TSX-V: ASTR) (“Astra” or

the “Company”) is pleased to provide an exploration update on Pampa Paciencia , its flagship gold-

silver project in northern Chile (Figure 5).

Highlights

• Delineation of a 600 metre long mineralized vein & breccia structure at the Paciencia and

Paciencia East veins containing wide intervals, up to 28.8 metres of precious metals, including

3.5 metres @ 5.0 grams per tonne (g/t) gold equivalent (AuEq) in trench TRP22-09

• Trenching results and re-logging historical drill core confirms both grade and vein thickness

increasing at depth

• 3,000 metre drill program commenced in February. Approximately 1,500 metres are planned

to test the Paciencia Vein at depth and along strike (Figure 4) with remainder of metres testing

other veins in the North and Central Zone targets .

Astra Exploration’s CEO, Brian Miller commented:

“The Company is making great strides with drilling commencing only one month after public listing.

Preparation ahead of drilling included systematic trenching and re -logging of historic core. This

demonstrates Pampa Paciencia is a large system with wide veins and high grade gold and silver

intercepts.”

“Most exciting is that historic drilling indicates grades are increasing at depth where the Company’s

initial drill holes will test . These are the perfect ingredients for a large, preserved system and the

Company’s maiden drill program will look to step out from open intersections to grow the Pampa

Pacienca mineralization further.”

Exploration Program Discussion

Pampa Paciencia is a 3,840 ha road -access low sulphidation epithermal ( LSE) gold-silver project

located within an active mining district less than 15 kilometr es from two major mines (Sierra Gorda

and Spence) and five kilometres from the Faride LSE mine.

The current exploration program has combined property wide mapping and sampling, geophysical

surveys, and localized trenching with the dual aims of defining a larger district and identifying the

highest priority initial drill targets.

Trenching

A 1,119 m etre trenching program was completed in early 2022 at the Pampa Paciencia project to

map the Paciencia and Paciencia E ast veins, and to confirm underlying magnetic structures

coincident with float Au -Ag anomalies. Trenches were concentrated in the outcropping or

subcropping areas of the North target, with some trenches targeting covered areas. A total of 311

samples were taken with rock saw and pneumatic hammer and sent to ALS lab in Santiago, Chile.

Above the primary drill target systematic trenches at the Paciencia and Paciencia East veins reported

anomalous gold and silver, with best results of of 21.1 metres @ 1.28 g/t AuEq, including 3.5 metres

@ 5 g/t AuEq in trench TRP22-09 (Table 1).

Table 1: Summary of the Au and Ag geochemical results from Phase I trenching program. AuEq calculated

using AuEq_80.

Trenches in covered areas (TRP22-01, TRP21-04 and TRP21-06) failed to reach the bed rock due

to the combined thickness and hardness of the caliche and alluvial sediments cover . Trenches

TRP21-03, TRP21-07 and TPR22-11 did not return significant mineralization.

Trench From To Width (m) g/t Au g/t Ag AuEq

TRP22-01

TRP21-02 46.3 57.3 11.0 0.42 4.18 0.47

including 46.3 48.3 2.0 1.15 5.00 1.22

TRP21-03

TRP21-04

TRP22-05 63.7 72.1 8.4 0.31 2.64 0.34

including 69.7 70.7 1.0 0.90 6.00 0.97

And 81.0 92.5 11.5 0.25 4.55 0.30

including 85.0 86.5 1.5 0.66 13.00 0.82

TRP21-06

TRP21-07

TRP22-08 37.8 38.6 0.8 0.58 1.00 0.60

And 47.0 48.0 1.0 0.63 4.00 0.68

TRP22-09 42.0 50.7 8.7 0.26 1.75 0.29

And 68.5 89.6 21.1 1.15 10.05 1.28

including 74.4 78.3 3.9 1.38 8.31 1.49

and including 84.7 88.2 3.5 4.52 38.86 5.00

TRP22-10 48.5 50.5 2.0 0.98 12.00 1.13

TRP22-11

TRP22-12 50.5 51.5 1.0 0.37 5.00 0.43

TRP21-13 18.4 19.4 1.0 0.55 1.00 0.56

Detailed trench mapping and interpretation of geophysical lineaments reveals that the the surface

expression of the Paciencia vein system is a NW-SE striking fault-related lineament composed mainly

by a late tectonic and hydrothermal breccia with limonitic matrix and clasts of the LSE quartz vein.

This late breccia event is transporting vein clasts to the surface, creating the large amount of vein

float blocks, and diluting the precious metal content of the quartz veins.

Figure 1: Phase I trenching program detail at Paciencia and Paciencia East vein areas.

Figure 2: Paciencia vein system (thick black dashed line) at the North Zone target area with detail of the

mineralization mapped with trenches on top of ground map (TDR map).

Relogging of DDH cores from holes PP15 -005, PP15-006 and PP15 -007 confirmed that the vein

breccias are more abundant at surface and the quartz veins are thicker and more continuous at depth

(Figure 3).

Reverse circulation d rilling commenced in February at Pampa Paciencia, with 50% of the 3,000

metres program stepping out from known mineralization on the Paciencia vein (Figure 4). The rest of

the program will be testing Paciencia Este vein, Paciencia Oeste vein,and geophysical anomalies in

the North Zone and the Central Zone (refer to February 17 news release) target.

The Company is stepping out in 35-50 metre steps from previous drilling including hole PP15-007

which returned 3.75 metres @ 8.29 g/t AuEq and hole PP15-006 which returned 2.1 metres @ 8.49

g/t AuEq. This drilling indicates to company geologists that mineralization is getting stronger in the

deepest holes, that the mineralization is likely to be fully preserved and that previous drilling was too

widely spaced to accurately define the shoots of mineralization that occurs in epithermal veins like

those at Pampa Pacienca.

Figure 3: Cross section from Figure 1 showing the different proportion of breccias and veins with depth.

Figure 4: Longitudinal section from Figure 1 of the Paciencia vein. Triangles are previous trenches and drill

holes, green circles are proposed drill program. Values in gold equivalent grams per tonne per metre

indicating system strengthening to depth.

Figure 5: Location of the Pampa Paciencia flagship project in the Paleocene Belt.

Sampling Procedures

Trench samples were sampled, bagged, and tagged by Astra´s geologists and then delivered in two

separate batches to the ALS sample preparation laboratory in Santiago. The first group was

delivered by Company personnel directly to the lab, while the second group was sent to the lab by

courier. The geologists placed a series of blind blanks, standards and sample duplicates in the

sample shipments as part of the Company’s QA/QC protocol. The QA/QC results were checked

and verified before any sample results were accepted to the assay database. Samples were

prepared with PREP 31B code, and then analyzed with fire assay for gold (Au-AA24), acid

digestion for silver (Ag-AA62), and multi elements by ICP (ME-ICP61).

Qualified Person Statement

The technical data and information as disclosed in this report has been reviewed and approved by

Darcy Marud. Mr. Marud is a Practicing Member of the Association of Professional Geoscientists of

Ontario and is a qualified person as defined under the terms of National Instrument 43 -101

– Standards of Disclosure for Mineral Projects.

About the Company

Astra Exploration Inc. is a n exploration company based out of Vancouver, BC. Astra is engaged in

the acquisition, exploration and development of epithermal gold -silver prop erties in Chile and is

building a portfolio of high -quality projects. Astra’s current focus is the development of the Pampa

Paciencia Project . Additional information is available on the Compnay’s website at www.astra -

exploration.com

For further information please contact:

Brian Miller

Chief Executive Officer

Tel. 604.428.0939

Email: [email protected]

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the

TSXV) accepts responsibility for the adequacy or accuracy of this release.

Mineralization hosted on adjacent and/or nearby and/or geologically similar properties is not

necessarily indicative of mineralization hosted on the Company’s properties.

This news release may contain certain “Forward -Looking Statements” within the meaning of the

United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities

laws. When or if used in this news releas e, the words “anticipate”, “believe”, “estimate”, “expect”,

“target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking

statements or information. These forward -looking statements or information may relate to the

Company’s business activities; exploration on the Company’s properties ; and marketing initiatives .

Such statements represent the Company’s current views with respect to future events and are

necessarily based upon a number of assumptions and estimates that, while considered reasonable

by the Company, are inherently subject to significant business, economic, competitive, political and

social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause

results, performance o r achievements to be materially different from the results, performance or

achievements that are or may be expressed or implied by such forward -looking statements. Such

factors include, without limitation: development of the industry in which the Company operates; risks

associated with the conduct of the Company's business activities; risks relating to reliance on the

Company's management team and outside contractors; currency fluctuations; risks regarding the

failure to generate sufficient cash flow from operations; laws and regulations governing the industry

in which the Company operates; the ability of the communities in which the Company operates to

manage and cope with the implications of COVID -19; the economic and financial implications of

COVID-19 to the Company; operating or technical difficulties; employee relations, labour unrest or

unavailability; stock market volatility; conflicts of interest among certain directors and officers; lack of

liquidity for shareholders of the Company; litigation risk; and other risk factors disclosed in the

Company’s public disclosure documents available on the Company’s profile at www.sedar.com.

Readers are cautioned against attributing undue certainty to forward-looking statements or forward-

looking information. Altho ugh the Company has attempted to identify important factors that could

cause actual results to differ materially, there may be other factors that cause results not to be

anticipated, estimated or intended. The Company does not intend, and does not assume a ny

obligation, to update these forward -looking statements or information to reflect changes in

assumptions or changes in circumstances or any other events affecting such statements and

information other than as required by applicable laws, rules and regulations.