Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ASTR.V ·

Astra Exploration completes Phase II drilling and Extends Pacienca Vein to 2.1km with Assays Expected in September

Exploration Programs

ASTRA EXPLORATION INC. (TSX-V: ASTR, OTCQB: ATEPF)

NEWS RELEASE

Astra Exploration completes Phase II drilling and Extends Pacienca Vein to 2.1km with

Assays Expected in September

Vancouver, British Columbia – August 23, 2022 – Astra Exploration Inc. (TSX-V: ASTR, OTCQB:

ATEPF) (“Astra” or the “Company”) is pleased to announce that it has completed 3,976 metres of

RC drilling in 15 holes at its Pampa Paciencia Project located in Northern Chile.

Highlights

• 100% of holes intersected quartz veins, stockworks or veinlets close to target depths

• 11 holes were drilled to expand mineralization beneath the Phase I program

• 4 holes into blind geophysical targets including the newly discovered Tormenta Vein

• Tormenta Vein is a splay off the main Paciencia Vein with two holes returning 6 and 28

metre-wide downhole intervals (5 and 10 metres estimated true widths, respectively)

Brian Miller, CEO of Astra commented:

“The Phase II drilling program has delivered a significant increase in vein strike from 1.4 to 2.1

kilometres with the discovery of new veins including the Tormenta Vein. The continuity of veins in the

Paciencia Vein System was confirmed at depths of 100 metres below previous drilling, where

Company geologists believe some of the best drill targets exist , and further confirms our view that

we are only just starting to define the mineralized footprint of the Paciencia Vein Field. Further, Astra’s

team has completed another campaign of drilling on time and budget with an estimated all -in drill

cost of approximately CAD$200 per metre.”

Drilling Details

The Phase II program consisted of 3,976 metres of RC drilling in 15 holes, all in the North Zone

target area (Figure 1).

The primary focus was to test the Paciencia Vein System at depth in the two defined high-grade

zones defined earlier this year in the Phase I drill program (Figure 2). Eleven holes were drilled into

known veins, with 4 holes directed to Paciencia Oeste vein segment, 3 to Paciencia and 4 to

Paciencia Este segment.

Drill results from the Phase II program confirm the continuity of the quartz veins at depth in the

Paciencia Vein System, which is a low-sulphidation epithermal (LSE) vein structure averaging 10-

15 metres thickness over a strike length of approximately 1.4 kilometres. Some deeper holes in the

Paciencia and Paciencia Este vein segments are showing a change in the dip and thickness of the

vein.

Secondary targets consisted of other vein structures discovered during the Phase I drill program.

These include blind magnetic low anomalies and newly interpreted vein structures from other

geophysical targets, in particular WNW, E-W to ENE-striking magnetic lineaments related with low

magnetic regional anomalies (Figure 1). All holes intersected quartz veins, stockworks or veinlets at

depth in agreement with the magnetic low anomalies. A new WNW-ESE vein (Tormenta vein) was

intersected in hole PPRC22-46 with a 28 metre-thick downhole interval (10 metres estimated true

width) and is interpreted to extend west to a six metre-thick downhole interval (5 metres estimated

true width) at hole PPRC22-55. Hole PPRC22-54 intersected quartz veinlets and is interpreted to

extend west to hole PPRC-22-38 (discovered in Phase I) in a new ENE-WSW vein structure.

Figure 1: Regional ground magnetics map of the Phase II drill hole locations (yellow dots) in the

North Zone. White dots represent Phase I hole locations. Black dots are historical holes.

Figure 2: Longitudinal section of the Paciencia Vein System with the 11 Phase II deep drill holes.

Figure 3: Location of the Pampa Paciencia Project in the Paleocene Belt of Northern Chile.

About Pampa Paciencia

Pampa Paciencia is a 3,840 hectare road -access LSE gold -silver project located within an active

mining district less than 15 kilometres from two major mines (Sierra Gorda and Spence) and five

kilometres from the Faride LSE mine (Figure 3).

Astra has completed property wide mapping and sampling, geophysical surveys, and localized

trenching, and in doing so has defined a vein boulder field over approximately 75% of the project

area. The veins do not outcrop as the majority of the project area is covered by a thin layer of gravels

and caliche but the vein float can be used to identify areas of high prospectivity.

About the Company

Astra Exploration Inc. is a n exploration company based out of Vancouver, BC. Astra is engaged in

the acquisition, explo ration and development of epithermal gold -silver properties in Chile and is

building a portfolio of high -quality projects. Astra’s current focus is the development of the Pampa

Paciencia Project.

For further information please contact:

Brian Miller

Chief Executive Officer

Tel. 604.428.0939

Email: [email protected]

OR

Nikki McEachnie

Manager of Investor Relations, Marketing & Business Development

Tel: 416.209.4940

Email: [email protected]

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the

TSXV) accepts responsibility for the adequacy or accuracy of this release.

Mineralization hosted on adjacent and/or nearby and/or geologically similar properties is not

necessarily indicative of mineralization hosted on the Company’s properties.

This news release may contain certain “Forward -Looking St atements” within the meaning of the

United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities

laws. When or if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”,

“target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking

statements or information. These forward -looking statements or information may relate to the

Company’s business activities; exploration on the Company’s properties; and m arketing initiatives.

Such statements represent the Company’s current views with respect to future events and are

necessarily based upon a number of assumptions and estimates that, while considered reasonable

by the Company, are inherently subject to sign ificant business, economic, competitive, political and

social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause

results, performance or achievements to be materially different from the results, performance or

achievements that are or may be expressed or implied by such forward -looking statements. Such

factors include, without limitation: development of the industry in which the Company operates; risks

associated with the conduct of the Company's business activities; risks relating to reliance on the

Company's management team and outside contractors; currency fluctuations; risks regarding the

failure to generate sufficient cash flow from operations; laws and regulations governing the industry

in which the Company opera tes; the ability of the communities in which the Company operates to

manage and cope with the implications of COVID -19; the economic and financial implications of

COVID-19 to the Company; operating or technical difficulties; employee relations, labour unre st or

unavailability; stock market volatility; conflicts of interest among certain directors and officers; lack of

liquidity for shareholders of the Company; litigation risk; and other risk factors disclosed in the

Company’s public disclosure documents ava ilable on the Company’s profile at www.sedar.com.

Readers are cautioned against attributing undue certainty to forward-looking statements or forward-

looking information. Although the Company has attempted to identify important factors that could

cause actu al results to differ materially, there may be other factors that cause results not to be

anticipated, estimated or intended. The Company does not intend, and does not assume any

obligation, to update these forward -looking statements or information to refle ct changes in

assumptions or changes in circumstances or any other events affecting such statements and

information other than as required by applicable laws, rules and regulations.