AVINO ANNOUNCES Q2 2023 PRODUCTION RESULTS

Avino Silver & Gold Mines Ltd. (ASM: TSX/NYSE American, GV6: FSE, “Avino” or “the Company”) achieved

production results of 587,317 silver equivalent ounces, bringing the 12-month trailing total to 2. 8 million silver

equivalent ounces from the Avino Mine.

Production Highlights – Q2 2023 (Compared to Q2 2022)

• Silver equivalent production decreased 10% to 587,317 oz

• Silver production increased 3% to 232,417 oz

• Copper production decreased 12% to 1.45 million lbs

• Gold production increased 13% to 1,520 oz

• Mill throughput increased by 33% to 157,371 tonnes

Avino Mine Production – Three and Six Months Ended June 30, 2023

“The Avino Mine continued to provide stable production results in the second quarter of 2023, albeit impacted by

mining in lower grade areas and certain mill equipment delivery delays, which are now behind us,” said David

Wolfin, President and CEO of Avino. “These challenges provided us with the opportunity to implement upgrades

to the haulage ramp that has since allowed us to exceed original underground maximum haulage rates. With these

upgrades, we expect production to catch up to our internal guidance in the second half of the year. On the

exploration side, we are thrilled with the outstanding drill results from below Level 17 released earlier this month

which further demonstrates that the Avino Mine continues to get better as we explore at depth. Finally, we remain

focused on the execution of our 5-year growth plan.”

Q2

2023

Q2

2022 Change H1

2023

H1

2022 Change

157,371 118,224 33% Total Mill Feed (dry tonnes) 311,119 229,362 39%

53 65 -19% Feed Grade Silver (g/t) 52 58 -10%

0.44 0.46 -3% Feed Grade Gold (g/t) 0.51 0.38 36%

0.49 0.69 -28% Feed Grade Copper (%) 0.48 0.63 -23%

87% 91% -5% Recovery Silver (%) 88% 91% -4%

68% 78% -13% Recovery Gold (%) 73% 77% -6%

84% 92% -8% Recovery Copper (%) 84% 90% -7%

232,417 225,537 3% Total Silver Produced (oz) 466,755 389,895 20%

1,520 1,350 13% Total Gold Produced (oz) 3,805 2,151 77%

1,445,552 1,644,342 -12% Total Copper Produced (Lbs) 2,843,189 2,861,691 -1%

587,317 649,569 -10% Total Silver Equivalent Produced (oz)1 1,265,564 1,107,367 14%

N E W S R E L E A S E

July 20, 2023 – Avino Silver & Gold Mines Ltd. – News Release

Avino Announces Q2 2023 Production Results

Page 2

2023 Second Quarter Highlights

• Steady Production at Avino: Silver equivalent production of 587,317 ounces is another consistent quarter of

mining operations . Production decreased when compared to recent quarters , primarily due to mine

sequencing of certain lower grade zone s of the Avino Mine along with supply chain issues for some

maintenance parts that effected recovery in the mill.

• Avino Announced Best Drill Intercept in Company History: On July 5, 2023, the Company released the results

of three holes from below Level 17, the current deepest workings at the Elena Tolosa (“ET”) area of the Avino

system. Drill Hole ET-23-09 showed 57 metres true width of mineralization and is a step-out 50 metres to the

west of Avino’s most westerly drill hole at 200 metres downdip below Level 17. This mineralized intercept is

exceptionally wide and has very high silver, gold and copper grades . The vein system continues to be open

along strike and at depth.

• Announced ET Area Drilling Results: On May 23, 2023, Avino announced drill results from 10 drill holes from

below Level 17, the current deepest workings at the mine. The current drill campaign shows the continuity of

the Avino Vein to be at least 1,100 metres downdip from surface outcrop.

• Metallurgical Testing Completed at the Oxide Tailings Project: On April 5, 2023 , Avino announced

metallurgical results from the testwork program that was completed and will form the basis of the metallurgical

analysis in a Pre-Feasibility Study (“PFS”) on the project. This Project has been in our portfolio for many years

and factors prominently into our 5-year growth plan to become an intermediate silver producer in Mexico.

These results also build on the studies in the 2017 Preliminary Economic Assessment (“PEA”) and increase the

level of confidence in the Project through the extensive testwork completed. In the recent update, The Oxide

Tailings mineral resource was increased by 407% in the measured and indicated categories to total 5.7 million

tonnes, and an increase of 287% to the silver equivalent ounces resulting in 17.4 million.

• Dry Stack Tailings Facility Completed and Operational: Avino’s tailings management system is based on our

commitment to safety and environmental stewardship. We approach our tailings management with respect

for the people in our communities and the environment. When we consider our environmental approach, we

strive to meet or exceed expectations while being guided by best practice standards globally. For those reasons

we selected dry stack and constructed a dry stack tailings facility which is now complete and fully operational.

The conveyor system is installed and is currently transporting the pressed dry tailings to the Avino open pit

area. A tab is now available on our website that provides further information on our tailings management

system, along with a video (in Spanish) from the minesite that can be viewed. In addition, a selection of short

videos of the facility in operation can be viewed under Videos and Media.

• La Preciosa Update: The Company is conducting community engagement in the nearby towns adjacent to the

property and will provide further updates as plans develop. Avino is fully committed to moving this project

forward as it factors prominently in the Company's 5-year growth strategy.

Quality Assurance/Quality Control

Mill assays are performed at the Avino property’s on -site lab. Check samples were submitted to SGS Labs in

Durango, Mexico for verification. Gold and silver assays are performed by the fire assay method with a gravimetric

finish for concentrates and AAS (Atomic Absorption Spectrometry) methods for copper, lead, zinc and silver for

feed and tail grade samples. All concentrate shipments are assayed by one of the following independent third-

party labs: Inspectorate in the UK, LSI in the Netherlands, and AHK.

July 20, 2023 – Avino Silver & Gold Mines Ltd. – News Release

Avino Announces Q2 2023 Production Results

Page 3

Qualified Person(s)

Peter Latta, P. Eng , MBA, Avino’s VP T echnical Services, is a qualified perso n within the context of National

Instrument 43-101 who has reviewed and approved the technical data in this news release.

About Avino

Avino is a silver producer from its wholly owned Avino Mine near Durango, Mexico. The Company’s silver, gold

and copper production remains unhedged. The Company’s mission and strategy is to create shareholder value

through its focus on profitable organic growth at the historic Avino Property and the strategic acquisition of the

La Preciosa property. Avino currently controls mineral resources, as per NI 43 -101, that total 368 million silver

equivalent ounces, within our district-scale land package. We are committed to managing all business activities in

a safe, environmentally responsible, and cost -effective manner, while contributing to the well -being of the

communities in which we operate. We encourage you to connect with us on Twitter at @Avino_ASM and

on LinkedIn at Avino Silver & Gold Mines. To view the Avino Mine VRIFY tour, please click here.

ON BEHALF OF THE BOARD

“David Wolfin”

David Wolfin

President & Chief Executive Officer

This news release contains “forward -looking information” and “forward -looking statements” (together, the “forward looking statements”) within the meaning of

applicable securities laws and the United States Private Securities Litigation Reform Act of 1995, including the mineral resource estimate for the Company’s Avino

Property, including La Preciosa, located near Durango in west-central Mexico (the “Avino Property”) with an effective date of November 30, 2022, prepared for the

Company, and references to Measured, Indicated, Inferred Resources referred to in this press release. These forward-looking statements are made as of the date of

this news release and the dates of technical reports, as applicable. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be

no assurance that the future circumstances, outcomes or results anticipated in or implied by such forward -looking statements will occur or that plans, intentions or

expectations upon which the forward -looking statements are based will occur. While we have based these forward -looking statements on our expectations about

future events as at the date that such statements were prepared, the statements are not a guarantee that such future events w ill occur and are subjec t to risks,

uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed o r implied by such forward -looking

statements. No assurance can be given that the Company’s Avino Property has the amount of mineral resources indicated in their reports or that such mineral resources

may be economically extracted. Such factors and assumptions include, among others, the effects of general economic conditions, the price of gold, silver and copper,

changing foreign exchange rates and actions by government authorities, uncertainties associated with legal proceedings and negotiations and misjudgments in the

course of preparing forward -looking information. In addition, there are known and unknown risk factors whi ch could cause our actual results, performance or

achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors

include risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; the COVID -19

pandemic; volatility in the global financial markets; fluctuations in metal prices; title matters; uncertainties and risks related to carrying on business in foreign countries;

environmental liability claims and insurance; reliance on key personnel; the potential for conflicts of interest among certain of our officers, directors or promoters with

certain other projects; the absence of divi dends; currency fluctuations; competition; dilution; the volatility of the our common share price and volume; tax

consequences to U.S. investors; and other risks and uncertainties. Although we have attempted to identify important factors t hat could cause actual actions, events

or results to differ materially from those described in forward -looking statements, there may be other factors that cause actions, events or results not to be as

anticipated, estimated or intended. There can be no assurance that forwa rd-looking statements will prove to be accurate, as actual results and future events could

differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward -looking statements. We are under no

obligation to update or alter any forward-looking statements except as required under applicable securities laws. For more detailed information regarding the Company

including its risk factors, investors are directed to the Company’s Annual Report on Form 20 -F and other periodic reports that it files with the U.S. Securities and

Exchange Commission.

References to Measured & Indicated Mineral Resources and Inferred Mineral Resources in this press release are terms that are defined under Canadian rules by

National Instrument 43-101 (“NI 43-101”). On October 31, 2018, the US Securities and Exchange Commission adopted Item 1300 of Regulation S -K (“Regulation SK-

1300”) to modernize the property disclosure requirements for mining registrants, and related guidance, under the Securities Act of 1933 and the Securities Exchange

Act of 1934. All registrants were required to comply with Regulation SK-1300 for fiscal years ending after January 1, 2021. Regulation SK-1300 uses the Committee for

Mineral Reserves International Reporting Standards (“CRIRSCO”) based classification scheme for mineral resources and mineral reserves, that includes definitions for

inferred, indicated, and measured mineral resources. U.S. Investors are cautioned not to assume that any part of the miner al resources in these categories will ever

be converted into probable or proven mineral reserves within the meaning of Regulation S-K 1300.

Footnotes:

In Q2 2023, AgEq was calculated using metals prices of $24.18 oz Ag, $1,978 oz Au and $3.85 lb Cu. In Q2 2022, AgEq was calculated using metals prices of $22.64 oz

Ag, $1,873 oz Au and $4.32 lb Cu. For YTD 2023, AgEq was calculated using metals prices of $23.37 oz Ag, $1,933 oz Au and $3. 95 lb Cu. For YTD 2022, AgEq was

calculated using metal prices of $23.29 oz Ag, $1,873 oz Au and $4.43 lb Cu.