Provides Quarterly Update
TSX
-
V: ARU
NR 20
20
-
20
AURANIA
PROVIDES QUARTERLY UPDATE
Toronto, Ontario,
June 1
,
20
20
–
Aurania Resources Ltd. (TSXV: ARU)
(OTCQB: AUIAF)
(F
rankfurt
: 20Q)
(“Aurania” or the “Company”)
is pleased to
provide a
n update of
activities
, many of
which are
key points from the
Company’s results for
the three months ended March 31, 2020
,
contained in
the F
inancial
S
tatements and
Management’s Discussion and Analysis dated
May 26, 2020
that
are available
on SEDAR at
www.sedar.com
and the Company’s website
http://aurania.com/investors/financial
-
reports/
.
Highlights
COVID
-
19:
All field work was suspended
during the quarter
as a precaution to mitigate the spread of the
COVID
-
19 virus. All field teams were withdrawn from the operational area by March 21, 2020
;
Our first exploration teams are
now
back in
Macas, the town in which Aurania’s field office is
located,
in quarantine
in preparation
to recommence exploration by June 10. The quarantine period
and associated testing for COVID
-
19 infection is in accordance with the Company’s COVID
-
19
protocol
that was implemented
following approval of the
biosafety protocol
for
the reopening of
mining activities that was approved by Ecuador’s National Committee of Emergency
;
The Company
translated
factual information regarding the COVID
-
19 virus
prepared by Ecu
ador’s
Ministry of Health
into the Shuar language of the local people
,
and helped disseminate that
information to
communities in its area of influence
of the
Lost Cities
–
Cutucu Project (“Project”)
;
and
The Company, in co
-
operation with the Step Forward F
oundation, with assistance with logistics
and transport from the Ministry of Social Inclusion and the Ecuadorian military, made two
d
eliveries
of
dried food such as rice, lentils and beans
to communities within the area of interest of
the
Project
.
The f
irst delivery totaled 8 tonnes
of food
to 970 families in 44 communities and the
second was 10 tonnes to 1,29
0
families in 49 communities.
Exploration:
LiDAR
data from
seven priority target areas
flown in Q1 is being integrated with geophysical data
from the 2017 survey, as well as with stream sediment and soil sampling results to refine target
areas;
LiDAR data
has
show
n
a feature that appears to be an old, engineered road along a ridgeline
in th
e
central part of the Project area
. The structure is completely jungle
-
covered, and the
re is a footpath
along the structure that is used by the
Shuar people. We believe that the engineered road is part of
an infrastructure network that linked the Spanish
Colonial gold mining centres of Logrono and
Sevilla. LiDAR interpretation is on
-
going
;
The first phase of scout drilling on the Yawi epithermal
gold
-
silver
target (3,010m drilled in 7
holes) was
completed. All of the boreholes confirmed the presence of
a maar
-
diatreme system
and
alteration and pathfinder element distribution provided a clear vector direction towards the core of
2
the
mineralized
system. Detailed field work in the direction of the vector identified a diatreme
breccia that contains fragment
s of mineralized porphyry and fragments of silica typical of an
epithermal
gold
-
silver
system. Now that the geological framework of the target area has been
established, the next step is to undertake a geophysical program aimed at identifying sulphides
re
lated to epithermal and porphyry systems. Two types of
geophysics
are being evaluated, to be
implemented as soon as possible: ground
-
based CSAMT that detects resistive zones
such as
quartz
related to epithermals
, and heliborne ZTEM or Mobile MT. The heli
borne
geophysics options are
designed to detect conductive and/or chargeable areas such as sulphide
-
bearing zones, as well as
resistive areas
–
such as
epithermal veins
;
and
A tenth bore hole was drilled at Crunchy Hill just prior to the drill crews and ex
ploration teams
withdrawing due to the COVID
-
related lockdown.
Hole CH
-
010 was drilled to a depth of 401m,
bringing the total scout drilling at Crunch Hill to 3,605m.
The bore hole intersected the maar
-
diatreme target and alteration and pathfinder element distribution between holes CH
-
009 and 010
showed a vector towards the north. The
next step
is to
undertake
a
similar geophysics
program
to
that planned for Yawi
prior
to any
further drilling
.
Environmental:
Revegetation of
the
drill platforms
at Yawi
was completed
and has been approved by the Ministry
of the Environment;
and
The Company received ISO14001 accreditation for the environmental aspects of its exploration
p
rogram
. This is an unusual accreditation for an exploration company and is
a sign of recognition,
by an unrelated third party, for the care with which the Company is striving to minimize its
environmental footprint and to engender improved environmental p
ractices in the communities
with which it works
.
ISO14001 provides a framework for ongoing improvement.
Concessions:
The Company paid a total of
US
$
2,077,640 (CAD 2,785,907)
to the Ecuador government for the
20
20
renewal
fees
for Aurania’s 42 mineral concessions
that constitute the Project
.
Financial
,
C
orporate
and
R
egulatory
:
The Company completed a
non
-
brokered private placement
for gross proceeds of
$6,
470
,1
3
1
, with
the issuance of
2,087,139
common shares;
Dr. Barron
agreed to
extend the maturity date of a 2017 Promissory Note
of $620,699 from May
29, 2020 to May 29, 2021
;
Mr. Alfred Lenarciak, an Independent director since June 2018, was appointed as Lead Director
;
Ms. Carolyn Muir was appointed VP
–
Inves
tor Relations
; and
The Company filed a National Instrument 43
-
101 report entitled “A Technical Review of the Lost
Cities
–
Cutucu Exploration Project, Morona
-
Santiago Province, Ecuador”.
Qualified Person
The technical information contained in this news release has been verified and approved by Jean
-
Paul
Pallier, MSc. Mr. Pallier is a designated EurGeol by the European Federation of Geologists and is a
Qualified Person as defined by National Instrument 43
-
101, Standards of Disclosure for Mineral Projects
of the Canadian Securities Administrators.
About Aurania
Aurania is a
mineral
exploration company engaged in the identification, evaluation, acquisition and
exploration of mineral property interests, wit
h a focus on precious metals and copper
in South America
. Its
flagship asset, The Lost Cities
–
Cutucu Project, is located in the Jurassic Metallogenic Belt in the eastern
foothills of the Andes mountain range of southeastern Ecuador.
3
Information on Auran
ia and technical reports are available at
www.aurania.com
and
www.sedar.com
, as
well as on Facebook at
https://www.facebook.com
/auranialtd/
, Twitter at
https://twitter.com/auranialtd
,
and LinkedIn at
https://www.linkedin.com/company/aurania
-
resources
-
ltd
-
.
For
further information, please contact:
Carolyn Muir
VP Investor
Relations
Aurania Resources Ltd.
(416) 367
-
3200
Dr. Richard Spencer
President
Aurania Resources Ltd.
(416)
367
-
3200
Neither the TSX
V
enture Exchange
nor its Regulation Services Provider (as that term is defined in the
policies of the
TSX Venture Exchange
) accepts responsibility for
the adequacy or accuracy of this release.
Forward
-
Looking Statements
This news release
may contain
forward
-
looking information that involves substantial known and unknown
risks and uncertainties, most of which are beyond the control of Aurania. Forward
-
looking statements
include estimates and statements that describe Aurania’s future plans, objectives or goals, including words
to the effect that Aurania or its management expects a stated condition or result to occur. Forward
-
looking
statements may be id
entified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”,
“could”, “would”, “will”, or “plan”. Since forward
-
looking statements are based on assumptions and
address future events and conditions, by their very nature they involve i
nherent risks and uncertainties.
Although these statements are based on information currently available to Aurania, Aurania provides no
assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors
involved with
forward
-
looking information could cause actual events, results, performance, prospects and
opportunities to differ materially from those expressed or implied by such forward
-
looking information.
Forward looking information in this news release includes, bu
t is not limited to, Aurania’s objectives, goals
or future plans, statements, exploration results, potential mineralization, the corporation’s portfolio,
treasury, management team and enhanced capital markets profile, the estimation of mineral resources,
e
xploration and mine development plans, timing of the commencement of operations and estimates of
market conditions. Factors that could cause actual results to differ materially from such forward
-
looking
information include, but are not limited to, failure
to identify mineral resources, failure to convert estimated
mineral resources to reserves, the inability to complete a feasibility study which recommends a production
decision, the preliminary nature of metallurgical test results, delays in obtaining or fa
ilures to obtain
required governmental, regulatory, environmental or other project approvals, political risks, inability to
fulfill the duty to accommodate indigenous peoples, uncertainties relating to the availability and costs of
financing needed in the
future, changes in equity markets, inflation, changes in exchange rates, fluctuations
in commodity prices, delays in the development of projects, capital and operating costs varying significantly
from estimates and the other risks involved in the mineral e
xploration and development industry, and those
risks set out in Aurania’s public documents filed on SEDAR. Although Aurania believes that the
assumptions and factors used in preparing the forward
-
looking information in this news release are
reasonable, und
ue reliance should not be placed on such information, which only applies as of the date of
this news release, and no assurance can be given that such events will occur in the disclosed time frames or
at all. Aurania disclaims any intention or obligation to
update or revise any forward
-
looking information,
whether as a result of new information, future events or otherwise, other than as required by law.