Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ARU.V ·

Aurania Applies FOR Exploration License IN Brittany, France

Permits & Approvals

TSX-V: ARU

NR 2022-16

AURANIA APPLIES FOR EXPLORATION LICENSE IN BRITTANY, FRANCE

Toronto, Ontario, July 24 , 2023 – Aurania Resources Ltd. (TSXV: ARU; OTCQB: AUIAF;

Frankfurt: 20Q) (“Aurania” or the “Company”) is pleased to announce it has applied for an exploration

license in the Brittany Peninsula of northwestern France through a wholly-owned French subsidiary. The

concession area, which includes Hennebont in the Morbihan Department , has historically been the site of

significant high-grade gold finds. Placer gold in streams is present in the vicinity of the area.

In December 2022, a very large and high -grade gold specimen was displayed at the Muséum National

d’Histoire Naturelle (Natural History Museum) in Paris, France. Museum staff estimates this sample of

3.31 kilograms weight to contain one kilo of gold; it is considered the highest-grade gold sample currently

known in France (Figure 1). It consists of vuggy coarse white quartz and native gold. Gold within the vugs

is crystalline in nature (Figure 2). The sample is displayed next to a dendritic crystalline gold sample from

the same locality (Figures 3 and 4).

Figure 1: High-grade gold specimen in the Natural History Museum, Paris, estimated to contain one

kilogram of gold.

2

Figure 2: Vug in the quartz vein sample, approximately one centimetre across, containing drusy

quartz and crystalline native gold.

3

Figure 3: Gold sample displayed next to a dendritic crystalline gold sample from the same locality.

4

Figure 4: Description of gold sample at the Natural History Museum in Paris. “Native gold in quartz

vein, piece of vein containing more than 1 kilogram of gold, largest sample found in France kept as

is, Bank of France deposit (loan)”.

Aurania’s team became aware of the sample last year and approached the museum staff as to its origins and

provenance. We were told the samples were purchased by the Banque de France and were on loan to the

Museum and that they supposedly came from an old collection. Museum staff supplied us with an article

from the Journal du Morbihan, a newspaper dated August 13, 1875 and entitled “Le quartz aurifere dans le

Morbihan”, and an extract from a book published by L’Abbe Henry Breuil, described in Wikipedia as a

“French Catholic priest, archaeologist, anthropologist, ethnologist and geologist” and one of the principal

early investigators of the cave paintings at Lascaux. Breuil examined a sample weighing 1,400 grams “with

a little adhering quartz” that was found in 1875 and acquired by a jeweller. The son of the jeweller said his

father had also purchased a nugget of 800 grams at the same time. The newspaper article said that two

pieces of auriferous quartz were discovered by road builders 400 metres apart and that one was broken into

a piece weighing 117 grams and a piece weighing about 900 grams. A third piece of 1,470 grams was found

separately and purchased by the jeweller . The description continued, “These ores are gold -bearing quartz,

very rich in gold, even excessively so. This gold is not compact, it is crystalline.”

Aurania’s President and CEO, Dr. Keith Barron met with a collector who wishes to remain anonymous, at

the Sainte-Marie-aux-Mines mineral show in Alsace in June 2023, who allowed him to examine a one -

kilogram specimen of quartz vein material with abundant gold that he claims comes from the same locality

in France. The sample (see Figure 5) closely resembles the museum sample and given the estimated grade

of 46% gold (460,000 g/t, or 13,416 oz/ton Au) it is almost certainly from the same locality.

5

Figure 5: Photo of a new gold -bearing quartz sample shown to Keith Barron by a collector and

presumably coming from the same area.

A visit to the locality in December 2022 showed abundant quartz vein material on surface and evidence of

past mining activity. Part of the site contains deep water filled pits and trenches that were presumably dug

in the 19th century. Growth of moss on the quartz rocks is considered “luxuriant” and there is no evidence

of modern prospecting or mining activity in the area . There has been no glaciation at the site and so the

quartz vein material at surface is more or less “in situ”.

Update on Ecuador

On July 31st, Dr. Barron will meet with Mines Minister of Ecuador , Sr. Fernando Santos to discuss the

potential “work around” mentioned in the Company’s press release dated June 19, 2023, to recover part or

all of the former “Reserved Areas” that were initially applied for in 2016, and contain a large number of

discrete magnetic, porphyry type targets.

At the same time, and in tandem with its exploration project and activities in Ecuador , the Company is

excited to actively pursue this extraordinary new gold exploration opportunity in Brittany, France,

mentioned above.

Qualified Person

The geological information contained in this news release has been verified and approved by Jean-Paul

Pallier, MSc., Vice -President Exploration of the Company. Mr. Pallier is a designated EurGeol by the

European Federation of Geologists and a Qualified Person as defined by National Instrument 43-101,

Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators.

About Aurania

Aurania is a mineral exploration company engaged in the identification, evaluation, acquisition, and

exploration of mineral property interests, with a focus on precious metals and copper in South America. Its

flagship asset, The Lost Cities – Cutucú Project, is located in the Jurassic Metallogenic Belt in the eastern

foothills of the Andes mountain range of southeastern Ecuador.

Information on Aurania and technical reports are available at www.aurania.com and www.sedar.com, as

well as on Facebook at https://www.facebook.com/auranialtd/, Twitter at https://twitter.com/auranialtd ,

and LinkedIn at https://www.linkedin.com/company/aurania-resources-ltd-.

For further information, please contact:

Carolyn Muir

VP Corporate Development & Investor Relations

Aurania Resources Ltd.

(416) 367-3200

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains forward-looking information as such term is defined in applicable securities

laws, which relate to future events or future performance and reflect management ’s current expectations

and assumptions. The forward-looking information includes Aurania ’s objectives, goals or future plans,

statements, exploration results, potential mineralization, the corporation’s portfolio, treasury, management

team and enhanced capital markets profile, the estimation of min eral resources, exploration, timing of the

6

commencement of operations, the Company’s teams being on track ahead of any drill program, the

commencement of any drill program and estimates of market conditions. Such forward-looking statements

reflect management ’s current beliefs and are based on assumptions made by and information currently

available to Aurania, including the assumption that, there will be no material adverse change in metal prices,

all necessary consents, licenses, permits and approvals will be obtained, including various local government

licenses and the market. Investors are cautioned that these forward-looking statements are neither promises

nor guarantees and are subject to risks and uncertainties that may cause future results to differ materially

from those expected. Risk factors that could cause actual results to differ materially from the results

expressed or implied by the forward -looking information include, among other things, the ability to

anticipate and counteract the effects of COVID-19 pandemic on the business of the Company, including

without limitation the effects of COVID -19 on the capital markets, commodity prices supply chain

disruptions, restrictions on labour and workplace attendance and local and international travel ; a failure to

obtain or delays in obtaining the required regulatory licenses, permits, approvals and consents; an inability

to access financing as needed; a general economic downturn, a volatile stock price, labour strikes, political

unrest, changes in the mining regulatory regime governing Aurania; a failure to comply with environmental

regulations; a weakening of market and industry reliance on precious metals and copper ; and. those risks

set out in the Company’s public documents filed on SEDAR. Aurania cautions the reader that the above list

of risk factors is not exhaustive. Although the Company believes that the assumptions and factors used in

preparing the forward-looking information in this news release are reasonable, undue reliance should not

be placed on such information, which only applies as of the date of this news release, and no assurance can

be given that such events will occur in the disclosed time frames or at all. The Company disclaims any

intention or obligation to update or revise any forward-looking information, whether as a result of new

information, future events or otherwise, other than as required by law.