Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

ARS.CN ·

Ares Strategic Mining Acquires Heavy Mining Equipment to Advance Fluorspar Project

Mergers & Acquisitions

Ares Strategic Mining Acquires Heavy Mining Equipment to

Advance Fluorspar Project

• Ares has procured essential heavy mining equipment to progress its flagship fluorspar

project in the United States.

• This acquisition reinforces Ares’ position as a key supplier of high-grade fluorspar, critical

to the nuclear energy and industrial sectors.

• The Company’s fluorspar production will support domestic industries and align with the

Department of Energy’s (DOE) mission to strengthen the U.S. nuclear fuel supply chain.

Vancouver, B.C., December 1 9, 2024 – Ares Strategic Mining Inc. (the “Company”) (CSE: ARS)

(OTC: ARSMF) (FRA: N8I1) is pleased to announce the acquisition of the heavy mining equipment

critical to the advancement of its flagship fluorspar project. As the owner of the only fluorspar

mine in the United States, Ares is well- positioned to support domestic industries with essential

minerals used in nuclear energy, electronics, and other key sectors.

This acquisition marks a significant step forward in the Company’s strategy to meet the rising

demand for fluorspar, particularly as a critical component in uranium enrichment and other

industrial applications. By ensuring a reliable domestic supply chain, Ares is actively contributing

to U.S. energy security and industrial independence.

A Key Milestone for U.S. Fluorspar Production

Fluorspar, used to produce hydrofluoric acid, is indispensable in the manufacturing of uranium

hexafluoride for nuclear fuel production. As global interest in nuclear energy surg es, Ares’

production capacity will be integral to bolstering the U.S. nuclear energy sector. The newly

acquired heavy mining equipment will allow Ares to scale operations efficiently, ensuring timely

delivery of high-grade acidspar to support critical industries.

Strengthening Partnerships and Industry Alignment

“The acquisition of this equipment is a major milestone in Ares’ journey to become a leading

supplier of high-grade fluorspar in North America,” said James Walker, President and CEO of Ares

Strategic Mining. “With this development, we are reinforcing our commitment to supporting

domestic energy security, industrial growth, and technological innovation.”

Positioned for Growth and Sustainability With its strategic advancements and collaborations,

Ares Strategic Mining remains dedicated to its mission of delivering high -grade fluorspar to

support national priorities, driving innovation, and ensuring a sustainable future for its

stakeholders.

In 2018 the U.S. government classified fluorspar as a Critical Mineral, “deemed critical to U.S.

national security and the economy.” Fluorspar remains the only non -metallic Critical Mineral,

which is 100% imported in the entire country. Fluorspar’s classification as a Critical Mineral in the

United States translates to a faster permitting period, enabling mining operations to initiate more

quickly than operations for conventional minerals.

As part of its ongoing efforts to manage the development of the Com pany, Ares has entered

several arrangements to further the business interests. At the request of the equipment

suppliers, Ares has agreed to settle $480,541.91 in equipment purchase costs through the

issuance of up to 2,52 9,168 Ares common shares (the "Set tlement"). Ares has also agreed to

settle $91,795.20 in professional lobbying service fees through the issuance of up to 483,133 Ares

common shares (the "Service Settlement"). Additionally, Ares has agreed to settle $8,900 in

management service fees throug h the issuance of up to 46,842 Ares common shares (the

"Management Settlement"). Purchases of an Ares debenture have also requested the conversion

of their $192,720.70 investment to 741,234 Ares common shares (the “Investment Settlement”).

All shares issued in connection with the Settlement will be subject to a four -month hold period

in accordance with applicable securities laws.

About Ares Strategic Mining

Ares Strategic Mining Inc. is a mining company focused on the development of its fluorspar

projects in the U.S. The Company aims to become a significant supplier of high -grade fluorspar

to North American markets, supporting industries vital to modern technology and infrastructure.

Lost Sheep Fluorspar Project – Delta, Utah

• 100% owned – 5,982 acres – 353 Claims

• Located in the Spor Mountain area, Juab County, Utah, approximately 214 km south-

west of Salt Lake City.

• Fully Permitted – including mining permits.

• NI 43-101 Technical Report identified extensive high- grade fluorspar with low levels

of impurities.

• Mining plan approved by BLM1

First approved by Rex Rowley – Area Manager, Bureau of Land Management – 24th August 1992.

Renewed by Paul B. Baker – Minerals Program Manager, Bureau of Land Management – 12th December 2016.

ON BEHALF OF THE BOARD OF DIRECTORS OF

ARES STRATEGIC MINING INC.

James Walker

Chief Executive Officer and President

For further information, please contact James Walker by email at [email protected]

DISCLOSURE AND FORWARD-LOOKING STATEMENTS:

Companies typically rely on comprehensive feasibility reports on mineral reserve estimates to reduce the

risks and uncertainties associated with a production decision. Historically, situations where the issuer

decides to put a mineral project into production without first establishing mineral reserves supported by a

technical report and completing a feasibility study have a higher risk of economic or technical failure,

though some industrial mineral ventures are relatively simple operations with low levels of investment and

risk, where the operating entity has determined that a formal prefeasibility or feasibility study in

conformance with NI 43-101 and 43-101 CP is not required for a production decision. Based on historical

engineering work, geological reports, historical production data and current engineering work completed

or in the process by Ares, the Company intends to move forward with the development of its Utah asset.

Certain information in this news release may contain forward-looking statements that involve substantial

known and unknown risks and uncertainties. Forward-looking statements are often identified by terms

such as “will”, “may”, “should”, “anticipate”, “expects” and similar expressions. All statements other than

statements of historical fact included in this news release are forward-looking statements that involve risks

and uncertainties. There can be no assurance that such statements will prove to be accurate and actual

results and future events could differ materially from those anticipated in such state ments. Important

factors that could cause actual results to differ materially from the Company’s expectations include the

failure to satisfy the conditions of the relevant securities exchange(s) and other risks detailed from time to

time in the filings mad e by the Company with securities regulations. The reader is cautioned that

assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events

or circumstances may cause actual results to differ materially from those predicted, as a result of numerous

known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the

Company. The reader is cautioned not to place undue reliance on any forward-looking information. Such

information, although considered reasonable by management at the time of preparation, may prove to be

incorrect and actual results may differ materially from those anticipated. Forward-looking statements

contained in this news release are expressly qualified by this cautionary statement. The forward -looking

statements contained in this news release are made as of the date of this news release and the Company

disclaims any intention or obligation to update or revise such information, except as required by applicable

law.