Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ARK.V ·

Arras Minerals Drills 154 Meters Grading 1.09% CuEq Including 118 Meters Grading 1.38% CuEq ON Berezski North Target

Drill Results

ARRAS MINERALS DRILLS 154 METERS

GRADING 1.09% CUEQ INCLUDING 118

METERS GRADING 1.38% CUEQ ON

BEREZSKI NORTH TARGET

TSX-V: ARK / OTCQB: ARRKF

VANCOUVER, BC

,

Aug. 27, 2025

/CNW/ -

Arras Minerals Corp.

(TSXV: ARK) (OTCQB: ARRKF)

("Arras" or "Arras Minerals" or "the Company")

is pleased to announce results from drillholes

EL25014, EL25014A, and EL25015, part of the ongoing 2025 drill program at the Elemes Project in

Northeast Kazakhstan

. The program is designed to systematically test multiple high-priority targets

along the 8.8-kilometre Berezski and the 14-kilometre Aimandai Trends.

Highlights include:

EL25014A:

154m

of mineralization grading 1.09 % copper-equivalent

("CuEq") (0.29% Cu

and 0.72 g/t Au), starting at

130m

depth; including:

118m

grading 1.38% CuEq (0.36% Cu and 0.91 g/t Au) starting at

130m

depth

24m

grading 2.32% CuEq (0.42% Cu, 1.73 g/t Au) starting at

144m

depth

Results confirm the presence of a large, well-developed hydrothermal system along the

Berezski 8.8 kilometre Berezski Trend.

Tim Barry

, CEO of Arras Minerals, commented:

"

Hole EL25014A underscores the quality of

copper and gold mineralization at the Berezski North Target and continues to confirm the scale of

the mineralized system we are drilling into. This hole was collared approximately

300m

northwest

of Hole EL24005 which reported

547m

@ 0.70% CuEq starting from

14m

and announced in our

February 11, 2025

news release. Hole El25016 as outlined in Figure 2 is collared approximately

300m

to the SE of Hole El25014A and once assay results are available for this hole, we will then

review next steps for the Berezski North target.

He continued,

"This result builds on our recent

announcement of 578 meters at 0.42% CuEq from the Berezski Central Target, located

approximately 5 kilometres to the south. Together, these intercepts highlight the district-scale

potential of the Elemes Project. With only a small portion of our Phase II drilling completed along

the 8.8-kilometre copper-in-soil anomaly that defines the Berezski Trend, we believe there remains

substantial upside yet to be tested. The presence of thick mineralized intercepts often starting at

surface and with broad zones exceeding 0.8% CuEq at Berezski North is particularly encouraging.

We're excited to build on this momentum as we advance what we view as one of the most

compelling copper-gold exploration opportunities in

Kazakhstan

.

"

Results from this news release include:

Table 1. Summary results from holes EL25014A and EL25015

Hole_ID

Intersection

Interval

Au

Cu

Ag

Mo

CuEq

AuEq

From (m)

To (m)

(m)

(g/t)

( %)

(g/t)

ppm

( %)

(g/t)

EL25014A

130.0

284.0

154.0

0.72

0.29

3.43

53.5

1.09

0.94

Including

130.0

248.0

118.0

0.91

0.36

4.41

68.7

1.38

1.18

including

144.0

168.0

24.0

1.73

0.42

4.70

89.3

2.32

1.99

EL25015

191.9

197.0

5.1

0.10

0.01

1.08

1.0

0.13

0.11

Notes: For copper and gold equivalent calculations the following metal process were used: US$3.75/lb. Copper, US$3,000/oz Gold, US$35/oz Silver, US$30/lb Molybdenum, and

metallurgical recoveries were assumed to be 90%. True thickness/widths of mineralization are unknown.

Table 2. Drill-hole locations

Hole_ID

Coordinates (UTM)

Azimuth

Dip

Hole Depth (m)

Easting

Northing

RL

EL25014

508114.2

5717557

236

050

-70

30

EL25014A

508123

5717561

236

050

-70

334.7

EL25015

508693

5718465

236

270

-60

499.5

A summary of each hole is outlined below:

Hole EL25014A:

The first attempt of hole EL25014 was abandoned at

30m

when drilling intersected

a highly weathered fault zone. A second version of the hole, EL25014A, was successfully

completed, collared

10m

to the northeast of the original hole. Hole EL25014A was designed to test

the westward extension and structural controls of the hydrothermal breccia pipe that hosts the

copper-gold mineralization previously encountered in Hole EL24005. Collared

300m

northwest of

EL24005, Hole EL25014A intersected weak to moderate propylitically altered diorite to

147m

before

entering a hydrothermal diorite-andesite breccia between

147m

to

284m

, cemented by a

tourmaline–pyrite matrix with ± chalcopyrite and overprinted by strong argillic alteration. Below the

breccia, drilling passed into a strongly propylitically altered andesite, which continued to the end of

hole at

334.7m

.

Mineralization from surface to

130m

consisted mainly of disseminated pyrite with rare pyrite-

chalcopyrite patches. Between

130m

and

284m

, mostly within the breccia, sulfide content increased

significantly, with strong pyrite-chalcopyrite mineralization observed throughout.

Hole EL25015:

Hole EL25015 was located 1 kilometre to the north of the Berezski North target and

drilled to test a copper-molybdenum soil anomaly associated with a magnetic low feature within the

8.8 kilometre Berezski Trend. The hole intersected a sequence of propyllitically altered andesites,

crosscut by several diorite dykes before the hole intersected a large weak to moderate propylitically

altered diorite body at

228m

to the end of the hole at

499.5m

. Weak mineralization is hosted along

localized quartz–sericite–pyrite alteration zones with associated minor quartz veins.

Figure 1. Map of the Berezski Trend highlighting the 8.8 km copper-in-soil anomaly. Drill holes

completed by Arras in 2024 are marked in white with a blue center, while holes drilled in 2025 to

date are shown in solid yellow. The location of the section in Figure 2 of this news release is shown

by the dashed blue line A-A’. (CNW Group/Arras Minerals Corp.)

Figure 2. Cross-section A-A’ looking NW showing key intercepts in drill-holes EL25014A, and last

year drill hole EL24005. Assays for drill hole EL25016 are pending. (CNW Group/Arras Minerals

Corp.)

Figure 3. Select photos from drill holes EL25014A (CNW Group/Arras Minerals Corp.)

Figure 4. Arras Minerals Elemes Project and project portfolio located in Pavlodar, Northeastern

Kazakhstan. (CNW Group/Arras Minerals Corp.)

Elemes Phase II Drill Program:

Since late June, Arras has been advancing its 20,000-metre Phase

II diamond drill program at Elemes. Two rigs are actively testing the highly prospective Berezski

Trend, building on the success of the 2024 campaign. To date, eight holes have been completed,

with assays pending for several. In parallel, the Company is carrying out Magnetotellurics ("MT") and

gravity surveys across key sections of the Berezski and Aimandai Trends, which will guide and refine

future targeting. Drilling is scheduled to continue through to the end of the year and continuing into

2026.

Elemes Project Overview:

The Elemes Project comprises two exploration licenses covering 531

square kilometres in northeast

Kazakhstan

, located approximately 13 km southwest of Ekibastuz

and just 20 km from Arras's operational base. The project benefits from exceptional infrastructure,

with a paved highway crossing the licence, and access to 1100 KVA power lines, heavy rail, and

other utilities within a 15 km radius.

Situated within the prolific Bozshakol-Chingiz metallogenic belt, Elemes lies near significant regional

deposits, including the Beskauga porphyry copper-gold-silver deposit (~80 km east) and KAZ

Minerals' Bozshakol mine (~60 km northwest)

1

.

Geologically, the property is underlain by interbedded intermediate volcanic and sedimentary rocks

intruded by multiple phases of diorite and monzodiorite porphyry. Copper-gold mineralization occurs

in sheeted and stockwork quartz-chalcopyrite veins associated with these intrusions. In addition,

high-grade low-sulphidation epithermal veins have been mapped on the property, representing a

secondary exploration target.

Property-wide soil sampling programs in 2022 and 2023 defined two extensive Cu-Mo-As

geochemical anomalies: the Berezski and Aimandai Trends, both considered priority targets for

follow-up exploration drilling. Initial drilling on the Berezski Trend in late 2024 returned high-grade

porphyry/epithermal copper and gold mineralization.

References

1

Bozshakol 2024 Report

https://www.kazminerals.com/media/23240/q4-2024-production-report_final.pdf

Qualified Person:

The scientific and technical disclosure for this news release has been prepared

under supervision of and approved by Matthew

Booth, Vice President of Exploration, of Arras Minerals Corp., a Qualified Person for the purposes

of NI 43-101. Mr. Booth has reviewed and approved the release. Mr. Booth has over 20 years of

mineral exploration experience and is a Qualified Person member of the American Institute of

Professional Geologists (CPG 12044).

On behalf of the Board of Directors

"Tim Barry"

Tim Barry, MAusIMM CP(Geo)

Chief Executive Officer and Director

Further information can be found on:

the Company's website

https://www.arrasminerals.com

or

follow us on LinkedIn:

https://www.linkedin.com/company/arrasminerals

or

follow us on X (formerly Twitter):

https://twitter.com/arrasminerals

About Arras Minerals Corp:

Arras is a Canadian exploration and development company advancing

a portfolio of copper and gold assets in northeastern

Kazakhstan

, including the Elemes copper-gold

porphyry project. The Company has established one of the largest land packages in the country

prospective for copper and gold. In

December 2023

, the Company entered into a strategic alliance

with Teck Resources Limited ("Teck") in which Teck may sole fund a

US$5 million

generative

exploration program over a portion of the Arras license package in 2024-2025. The Company's

shares are listed on the TSX-V under the trading symbol "ARK" and on the OTCQB under the

trading symbol "ARRKF".

Cautionary Note to U.S. Investors concerning estimates of Measured, Indicated, and Inferred

Resources:

References contained in this press release uses the terms "measured resources",

"indicated resources", and "inferred resources" which are defined in, and required to be disclosed

by, NI43-101. The Company advises U.S. investors that these terms are not recognized by the SEC.

The estimation of measured, indicated and inferred resources involves greater uncertainty as to their

existence and economic feasibility than the estimation of proven and probable reserves. U.S.

investors are cautioned not to assume that measured and indicated mineral resources will be

converted into reserves. The estimation of inferred resources involves far greater uncertainty as to

their existence and economic viability than the estimation of other categories of resources. U.S.

investors are cautioned not to assume that estimates of inferred mineral resources exist, are

economically minable, or will be upgraded into measured or indicated mineral resources. Under

Canadian securities laws, estimates of inferred mineral resources may not form the basis of

feasibility or other economic studies. Disclosure of "contained ounces" in a resource is permitted

disclosure under Canadian regulations, however the SEC normally only permits issuers to report

mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade

without reference to unit measures. Accordingly, the information contained in this press release may

not be comparable to similar information made public by U.S. companies that are not subject NI 43-

101.

Cautionary note regarding forward-looking statements

: This news release contains forward-

looking statements regarding future events and Arras' future results that are subject to the safe

harbors created under the U.S. Private Securities Litigation Reform Act of 1995, the Securities Act

of 1933, as amended, and the Exchange Act, and applicable Canadian securities laws. Forward-

looking statements include, among others, statements regarding plans and expectations of the

exploration program Arras is in the process of undertaking. These statements are based on current

expectations, estimates, forecasts, and projections about Arras' exploration projects, the industry in

which Arras operates and the beliefs and assumptions of Arras' management. Words such as

"expects," "anticipates," "targets," "goals," "projects," "intends," "plans," "believes," "seeks,"

"estimates," "continues," "may," variations of such words, and similar expressions and references to

future periods, are intended to identify such forward-looking statements. Forward-looking

statements are subject to a number of assumptions, risks and uncertainties, many of which are

beyond management's control, including undertaking further exploration activities, the results of such

exploration activities and that such results support continued exploration activities, unexpected

variations in ore grade, types and metallurgy, volatility and level of commodity prices, the availability

of sufficient future financing, and other matters discussed under the caption "Risk Factors" in the

Management Discussion and Analysis filed on the Company's profile on SEDAR on

February 27,

2025

. Readers are cautioned that forward-looking statements are not guarantees of future

performance and that actual results or developments may differ materially from those expressed or

implied in the forward-looking statements. Any forward-looking statement made by the Company in

this release is based only on information currently available and speaks only as of the date on which

it is made. The Company undertakes no obligation to publicly update any forward-looking statement,

whether written or oral, that may be made from time to time, whether as a result of new information,

future developments, or otherwise.

SOURCE

Arras Minerals Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/August2025/27/c1247.html

%SEDAR: 00053495E

For further information:

INVESTOR RELATIONS: +1 604 687 5800, [email protected]

CO: Arras Minerals Corp.

CNW 06:00e 27-AUG-25